FDOT contract T5869 bid tabulation

SR 40 (E SILVER SPRINGS BLVD) FROM US 441 TO SE 196 TERRACE. Let by Florida DOT on October 29, 2025, Marion, District 5. 3 bids received; low bid $16,582,343 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
29 OCT 2025
Pay items
158
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$16,582,343Low
2C.W. Roberts Contracting, Inc.$16,727,102+1.0%
3Superior Asphalt, Inc.$18,448,001+11%
FDOT contract T5869: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. C.W. Roberts Contracting, Inc.3. Superior Asphalt, Inc.
0005Mobilization (0101-1)LS1$498,930$545,381$351,692
0010Mobilization (0101-1)LS1$409,333$397,330$230,290
0015Mobilization (0101-1)LS1$400,824$397,292$184,230
0020Maintenance of traffic (0102-1)DA1$261,631$266,159$418,450
0025Maintenance of traffic (0102-1)DA1$240,337$236,845$272,900
0030Maintenance of traffic (0102-1)DA1$394,537$230,208$218,325
0035Pedestrian or bicycle special detour (0102-4-1)SY1$1,926.35$4,901.33$8,975.00
0040Pedestrian or bicycle special detour (0102-4-1)SY1$1,870.28$33,566$5,600.00
0045Traffic control officer (0102-14)HR1,286$128.97$92.50$106.50
0050Work zone sign (0102-60)ED132,048$0.19$0.21$0.20
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED164,640$0.10$0.10$0.10
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD1,279$0.03$0.22$0.25
0065Arrow board / advance warning arrow panel (0102-76)ED1,714$5.61$5.50$5.60
0070Portable changeable message sign, temporary (0102-99)ED7,048$10.09$9.62$9.80
0075Temporary signalization and maintenance, intersection (0102-104)ED8,820$40.67$8.30$40.75
0080Temporary traffic detection and maintenance, intersection (0102-107-1)ED8,820$6.56$1.10$6.50
0085Type III barricade (0102-115)ED1,843$0.26$0.33$0.35
0090Temporary raised rumble per day, includes all sets and relocations (0102-909)DA420$56.07$25.28$25.75
0095Removable tape, white, solid 6" (0102-913-21)GM0.10$29,604$28,732$35,895
0100Removable tape, yellow, solid, (0102-913-31)GM0.19$29,604$28,235$35,895
0105Sediment barrier (0104-10-3)LF4,400$3.58$1.03$1.25
0110Staked turbidity barrier- nylon reinforced PVC (0104-12)LF107$11.98$6.53$5.90
0115Inlet protection system (0104-18)EACH139$168.20$108.82$140.20
0120Litter removal (0107-1)ACRE4,955.89$61.67$28.29$29.15
0125Mowing (0107-2)ACRE4,599.30$61.67$45.71$47.10
0130Clearing & grubbing (0110-1-1)ACRE1$106,013$56,565$7,545.00
0135Clearing & grubbing (0110-1-1)ACRE1$17,754$2,090.15$6,225.00
0140Clearing & grubbing (0110-1-1)ACRE1$17,754$11,937$6,310.00
0145Removal of existing concrete (0110-4-10)SY522$76.69$48.46$115.50
0150Regular excavation (0120-1)CY75.50$268.97$89.53$58.35
0155Embankment (0120-6)CY54.20$414.03$166.73$86.35
0160Optional base, base group 09 (0285-709)SY102$77.78$174.68$138.40
0165Turnout base- optional materials (0286-1)SY33$187.73$150.33$163.75
0170Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY69,204$2.45$3.34$2.85
0175Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY56,990$2.65$4.66$6.25
0180Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY462,912$2.05$2.17$2.50
0185Superpave asphaltic conc, traffic C (0334-1-13)TN5,717.80$132.66$127.47$141.85
0190Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN23,841$141.47$160.30$175.35
0195Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88)TN26,338.60$134.28$147.61$201.95
0200Inlets, DT bot, type E, <10' (0425-1551)EACH4$9,136.97$4,767.53$7,795.00
0205Replace grate (0425-82)EACH2$1,682.04$2,177.55$1,965.00
0210Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF246$163.70$74.14$172.75
0215Pipe culvert,optional material,other-elip/arch, (0430-175218)LF179$171.93$100.14$192.00
0220U-endwall, with grate,index 260/430-010, 1:4 slope, 18" (0430-602125)EACH1$9,858.65$6,249.49$10,740
0225Mitered end section, optional - elliptical / arch, 18" CD (0430-982625)EACH2$4,483.69$3,963.34$2,300.00
0230Concrete curb & gutter, type F (0520-1-10)LF575$84.10$64.19$84.15
0235Concrete sidewalk and driveways, 4" thick (0522-1)SY414$96.72$98.15$96.75
0240Concrete sidewalk and driveways, 6" thick (0522-2)SY325$234.36$203.25$234.40
0245Detectable warnings (0527-2)SF1,494$44.85$30.47$32.00
0250Performance turf, sod (0570-1-2)SY48,258$6.51$5.97$5.70
0255Conduit, furnish & install, open trench (0630-2-11)LF328$36.80$32.15$36.75
0260Conduit, furnish & install, directional bore (0630-2-12)LF150$30.62$36.05$30.50
0265Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH14$2,166.93$1,709.29$2,170.00
0270Electrical power service- contribution in aid of construction (ciac), clay electric (DO not bid) (0639-8151)LS1$1,302.61$1,302.61$1,302.61
0275Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH29$2,621.89$3,908.84$2,625.00
0280Traffic monitoring site speed/classification unit, furnish & install, volume speed and classification (0695-3-11)AS1$13,907$11,607$13,900
0285Traffic monitoring site solar power unit, furnish & install (0695-5-1)EACH1$2,600.83$4,081.42$2,600.00
0290Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH29$3,509.58$2,546.90$3,510.00
0295Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132)EACH4$8,179.76$9,298.33$8,200.00
0300Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH1$9,172.29$10,688$9,175.00
0305Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH5$1,311.99$1,461.97$1,310.00
0310Traffic monitoring site surge suppressor, furnish & install (0695-16-1)EACH1$613.36$2,885.47$610.00
0315Raised pavement marker, type B (0706-1-3)EACH2,160$4.49$4.40$5.75
0320Painted pavement markings, standard, white, solid, 6" (0710-11101)GM5.98$2,072.27$2,028.31$1,850.00
0325Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.10$2,960.39$2,817.48$2,460.00
0330Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF6,551$1.68$1.65$2.00
0335Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF63$2.80$2.75$2.50
0340Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,612$3.36$3.30$3.00
0345Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM3.88$1,480.19$1,449.10$482.00
0350Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.59$1,480.19$1,443.64$840.00
0355Painted pavement markings, standard, white, message or symbol (0710-11160)EACH6$56.07$54.96$95.00
0360Painted pavement markings, standard, white, arrows (0710-11170)EACH129$67.28$65.95$67.30
0365Painted pavement markings, standard, white, yield line (0710-11180)LF27$11.21$10.99$11.20
0370Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM5.09$2,072.27$2,029.37$1,850.00
0375Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF1,149$2.80$2.75$2.60
0380Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM1.82$1,480.19$1,447.80$482.30
0385Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.04$1,480.18$1,209.17$841.00
0390Disputes review board, meeting- DO not bid (0999-20-1)DA10$4,800.00$4,800.00$4,800.00
0395Disputes review board, hearing- DO not bid (0999-20-2)EACH2$11,500$11,500$11,500
0400Initial contingency amount, DO not bid (0999-25)LS1$70,000$70,000$70,000
0405Initial contingency amount, DO not bid (0999-25)LS1$45,000$45,000$45,000
0410Initial contingency amount, DO not bid (0999-25)LS1$35,000$35,000$35,000
0415Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM36.44$1,687.65$2,001.05$1,165.00
0420Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH295$527.04$604.57$620.00
0425Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH46$2,242.73$1,978.60$2,025.00
0430Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH5$3,476.22$3,077.82$3,150.00
0435Single column ground sign assembly, relocate (0700-1500)EACH3$22.43$439.69$450.00
0440Single column ground sign assembly, remove (0700-1600)EACH87$22.43$32.98$33.75
0445Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112)EACH3$5,831.08$7,144.95$7,315.00
0450Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH2$7,625.26$8,793.79$9,000.00
0455Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH3$8,185.94$10,443$10,690
0460Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH8$11,774$9,013.63$9,230.00
0465Multi-column ground sign assembly, remove (0700-2600)EACH6$560.68$1,538.91$1,575.00
0470Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$3,644.42$494.66$510.00
0475Sign panel, furnish & install ground mount, 51-100 SF (0700-3105)EACH1$6,167.49$2,198.44$2,250.00
0480Sign panel, remove, 51-100 SF (0700-3605)EACH1$560.68$137.40$140.00
0485Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH148$78.49$82.44$84.50
0490Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH101$89.71$98.93$101.25
0495Tubular marker, 36" white post (0704-1-3)EACH4$207.45$247.33$255.00
0500Tubular marker, 36" yellow (0704-1-4)EACH1$207.45$247.32$255.00
0505Object marker, type 1 (0705-10-1)EACH55$280.34$274.81$280.00
0510Object marker, type 2 (0705-10-2)EACH20$280.34$120.91$125.00
0515Object marker, type 3 (0705-10-3)EACH4$280.34$274.81$280.00
0520Delineator, flexible tubular (0705-11-1)EACH47$207.45$109.92$115.00
0525Raised pavement marker, type B (0706-1-3)EACH11,373$4.49$4.40$5.90
0530Painted pavement markings, standard, white, island nose (0710-11190)SF40$11.21$10.99$11.20
0535Painted pavement markings, standard, yellow, island nose (0710-11290)SF4$11.21$10.99$11.20
0540Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF149$22.43$21.98$11.20
0545Painted pavement markings, surface (0710-90)LS1$84,102$82,442$111,750
0550Painted pavement markings, surface (0710-90)LS1$84,102$82,442$128,510
0555Painted pavement markings, surface (0710-90)LS1$84,102$82,442$50,285
0560Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.06$8,881.16$7,636.67$21,790
0565Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF11,945$3.92$3.85$3.10
0570Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF2,405$5.61$5.50$5.30
0575Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF3,429$8.97$8.79$9.50
0580Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM1.60$4,440.59$4,342.07$2,795.00
0585Thermoplastic, standard, message or symbol (0711-11160)EACH67$168.20$164.88$135.00
0590Thermoplastic, standard, arrow (0711-11170)EACH589$112.14$109.92$78.25
0595Thermoplastic, standard, yield line (0711-11180)LF154$28.03$27.48$11.20
0600Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF8,382$5.61$5.50$5.30
0605Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.85$4,440.59$4,347.81$2,795.00
0610Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF6,618$15.70$15.39$15.10
0615Thermoplastic, preformed, white, message (0711-14160)EACH4$364.45$357.25$290.50
0620Thermoplastic, preformed, white, arrow (0711-14170)EACH4$291.55$285.80$223.50
0625Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191)LF50$7.85$7.69$5.60
0630Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193)LF300$13.46$13.19$10.00
0635Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM43.55$5,920.79$5,803.23$4,025.00
0640Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM1.28$8,881.20$8,644.59$16,765
0645Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM14.01$4,440.59$4,352.92$1,565.00
0650Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.15$8,881.16$8,405.66$17,880
0655Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM43.37$5,920.79$5,802.69$4,025.00
0660Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM6.77$4,440.59$4,352.92$1,565.00
0665Conduit, furnish & install, open trench (0630-2-11)LF189$25.04$21.98$24.95
0670Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH9$1,904.53$3,033.86$1,900.00
0675Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112)AS1$5,526.11$10,510$4,800.00
0680Electrical service wire, & install (0639-2-1)LF28$6.63$10.99$6.60
0685Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,916.33$16,072$2,900.00
0690Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF1,487$4.58$3.90$4.50
0695Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321)EACH3$8,651.29$12,396$8,620.00
0700Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH3$924.26$1,154.19$920.00
0705Conduit, furnish & install, open trench (0630-2-11)LF70$35.52$34.88$35.40
0710Conduit, furnish & install, directional bore (0630-2-12)LF186$40.55$56.39$40.50
0715Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI4$9,953.18$9,883.12$9,920.00
0720Fiber optic cable locator (0633-6)DA420$262.40$405.61$261.00
0725Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH39$1,904.53$1,709.29$1,900.00
0730Electrical power service, remove overhead (0639-1610)AS1$524.80$1,819.22$523.00
0735Electrical service wire, & install (0639-2-1)LF22$69.60$10.99$69.35
0740Electrical service wire, (0639-2-6)LF20$2.62$4.40$2.60
0745Aluminum signals pole, (0646-1-11)EACH4$3,560.56$3,537.30$3,550.00
0750Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS4$925.66$1,203.65$922.50
0755Loop detector inductive, F&I, type 9 (0660-1109)EACH54$336.55$430.90$335.35
0760Loop assembly, F&I, type B (0660-2102)AS84$1,663.45$1,903.85$1,660.00
0765Loop assembly, F&I, type F (0660-2106)AS75$2,581.84$2,317.16$2,575.00
0770Pedestrian detector, furnish & install, standard (0665-1-11)EACH4$568.94$441.89$565.00
0775Traffic controller, modify (0671-2-40)EACH15$2,099.18$2,776.64$2,095.00
0780Remote power management rpmu, furnish and install (0685-2-1)EACH5$721.60$2,700.79$720.00
0785Sign panel, remove, 12-20 SF (0700-3602)EACH6$262.40$282.50$261.50
0790Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$8,061.15$11,325$8,035.00
FDOT contract T5869: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy