FDOT contract T4773 bid tabulation

SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1. Let by Florida DOT on August 26, 2026, St Lucie, District 4. 13 bids received; low bid $2,598,162 by Gerelco Traffic Controls, Inc..

Owner
Florida DOT
Letting
26 AUG 2026
Pay items
37
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gerelco Traffic Controls, Inc.$2,598,162Low
2Carr Construction, LLC$2,688,590+3.0%
3Chinchor Electric Inc.$2,789,214+7.0%
4Arc Electric Inc$3,000,000+15%
5Traffic Management Solutions, LLC$3,031,997+17%
6American Lighting and Signalization, LLC.$3,048,000+17%
7Aum Construction Inc.$3,149,000+21%
8Sice Inc$3,200,756+23%
9Ferreira Construction Co., Inc.$3,299,688+27%
10New Era Electric Inc$3,337,215+28%
11Signal Technology and Installation Corp.$4,169,372+60%
12Horsepower Electric, Inc.$4,633,407+78%
13Under Power Corp$4,847,918+87%
FDOT contract T4773: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gerelco Traffic Controls, Inc.2. Carr Construction, LLC3. Chinchor Electric Inc.4. Arc Electric Inc5. Traffic Management Solutions, LLC6. American Lighting and Signalization, LLC.
0005Mobilization (0101-1)LS1$155,000$66,490$291,184$266,000$229,842$375,478
0010Maintenance of traffic (0102-1)DA1$45,000$29,800$55,644$125,909$100,883$127,734
0015Pedestrian or bicycle special detour (0102-4-1)SY1$12,500$20,460$9,389.60$5,000.00$106,163$12,208
0020Traffic control officer (0102-14)HR440$58.00$80.00$53.35$65.00$112.17$144.00
0025Work zone sign (0102-60)ED9,525$0.30$0.25$0.23$0.25$0.26$0.24
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED20,970$0.20$0.15$0.11$0.20$0.16$0.12
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD411,857$0.05$0.05$0.09$0.05$0.05$0.06
0040Arrow board / advance warning arrow panel (0102-76)ED2,036$6.20$6.05$6.40$6.00$6.60$6.00
0045Portable changeable message sign, temporary (0102-99)ED1,580$11.00$10.50$11.74$10.00$11.41$11.00
0050Temporary signalization and maintenance, intersection (0102-104)ED762$10.60$3.75$6.60$8.00$26.11$15.00
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED762$9.20$3.75$6.60$8.00$26.11$35.00
0060Sediment barrier (0104-10-3)LF172$2.90$4.70$12.80$10.00$2.55$7.00
0065Clearing & grubbing (0110-1-1)ACRE1$12,000$5,050.00$5,868.50$3,510.29$29,337$6,582.00
0070Removal of existing concrete (0110-4-10)SY377$36.40$19.90$28.81$40.00$85.79$32.00
0075Tree protection barrier (0110-21)LF778$4.30$4.90$26.68$5.00$4.28$30.00
0080Tree root and branch pruning (0110-22)EACH35$600.00$330.00$613.53$1,000.00$428.51$688.00
0085Concrete sidewalk and driveways, 4" thick (0522-1)SY312$68.30$110.00$74.69$85.00$119.77$84.00
0090Concrete sidewalk and driveways, 6" thick (0522-2)SY15$165.00$140.00$213.40$200.00$238.53$239.00
0095Performance turf, sod (0570-1-2)SY826$7.00$9.95$14.40$5.00$4.06$16.00
0100Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0105Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0110Conduit, furnish & install, open trench (0630-2-11)LF7,975$9.70$8.50$12.64$18.00$13.12$12.00
0115Conduit, furnish & install, directional bore (0630-2-12)LF9,352$26.00$29.60$25.20$26.00$31.98$17.00
0120Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH142$1,450.00$1,320.00$951.99$1,400.00$1,525.96$1,445.00
0125Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$2,654.00$4,910.00$3,998.05$8,505.00$5,808.13$4,267.00
0130Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$1,991.00$3,110.00$2,875.03$3,500.00$2,423.60$1,645.00
0135Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$118,998$118,998$118,998$118,998$118,998$118,998
0140Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$2,002.00$2,170.00$2,243.68$3,000.00$1,416.42$1,390.00
0145Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF42,034$2.40$2.35$2.11$4.25$1.98$2.00
0150Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF64,272$3.40$3.40$3.79$5.00$2.90$3.00
0155Load center, F&I, secondary voltage (0715-7-11)EACH2$18,500$16,110$13,459$15,000$14,268$10,520
0160Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH7$1,063.00$1,230.00$1,404.17$1,200.00$1,187.37$861.00
0165Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352)EACH6$12,523$15,680$14,620$10,000$20,869$20,043
0170Light pole complete, F&I, standard pole special foundation, 40' mounting height, 15' arm length (0715-62352)EACH88$10,433$12,020$10,705$10,000$9,801.66$11,734
0175Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266)EACH3$11,616$16,050$14,597$10,000$23,811$20,016
0180Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH97$867.00$1,100.00$706.30$600.00$873.34$579.00
0185Fiber optic cable locator (0633-6)DA381$43.40$27.00$133.38$150.00$152.92$103.00
FDOT contract T4773: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way