FDOT contract T4773 bid tabulation
SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1. Let by Florida DOT on August 26, 2026, St Lucie, District 4. 13 bids received; low bid $2,598,162 by Gerelco Traffic Controls, Inc..
- Owner
- Florida DOT
- Letting
- 26 AUG 2026
- Pay items
- 37
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerelco Traffic Controls, Inc. | $2,598,162 | Low |
| 2 | Carr Construction, LLC | $2,688,590 | +3.0% |
| 3 | Chinchor Electric Inc. | $2,789,214 | +7.0% |
| 4 | Arc Electric Inc | $3,000,000 | +15% |
| 5 | Traffic Management Solutions, LLC | $3,031,997 | +17% |
| 6 | American Lighting and Signalization, LLC. | $3,048,000 | +17% |
| 7 | Aum Construction Inc. | $3,149,000 | +21% |
| 8 | Sice Inc | $3,200,756 | +23% |
| 9 | Ferreira Construction Co., Inc. | $3,299,688 | +27% |
| 10 | New Era Electric Inc | $3,337,215 | +28% |
| 11 | Signal Technology and Installation Corp. | $4,169,372 | +60% |
| 12 | Horsepower Electric, Inc. | $4,633,407 | +78% |
| 13 | Under Power Corp | $4,847,918 | +87% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerelco Traffic Controls, Inc. | 2. Carr Construction, LLC | 3. Chinchor Electric Inc. | 4. Arc Electric Inc | 5. Traffic Management Solutions, LLC | 6. American Lighting and Signalization, LLC. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $155,000 | $66,490 | $291,184 | $266,000 | $229,842 | $375,478 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $45,000 | $29,800 | $55,644 | $125,909 | $100,883 | $127,734 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $12,500 | $20,460 | $9,389.60 | $5,000.00 | $106,163 | $12,208 |
| 0020 | Traffic control officer (0102-14) | HR | 440 | $58.00 | $80.00 | $53.35 | $65.00 | $112.17 | $144.00 |
| 0025 | Work zone sign (0102-60) | ED | 9,525 | $0.30 | $0.25 | $0.23 | $0.25 | $0.26 | $0.24 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 20,970 | $0.20 | $0.15 | $0.11 | $0.20 | $0.16 | $0.12 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 411,857 | $0.05 | $0.05 | $0.09 | $0.05 | $0.05 | $0.06 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 2,036 | $6.20 | $6.05 | $6.40 | $6.00 | $6.60 | $6.00 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 1,580 | $11.00 | $10.50 | $11.74 | $10.00 | $11.41 | $11.00 |
| 0050 | Temporary signalization and maintenance, intersection (0102-104) | ED | 762 | $10.60 | $3.75 | $6.60 | $8.00 | $26.11 | $15.00 |
| 0055 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 762 | $9.20 | $3.75 | $6.60 | $8.00 | $26.11 | $35.00 |
| 0060 | Sediment barrier (0104-10-3) | LF | 172 | $2.90 | $4.70 | $12.80 | $10.00 | $2.55 | $7.00 |
| 0065 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $12,000 | $5,050.00 | $5,868.50 | $3,510.29 | $29,337 | $6,582.00 |
| 0070 | Removal of existing concrete (0110-4-10) | SY | 377 | $36.40 | $19.90 | $28.81 | $40.00 | $85.79 | $32.00 |
| 0075 | Tree protection barrier (0110-21) | LF | 778 | $4.30 | $4.90 | $26.68 | $5.00 | $4.28 | $30.00 |
| 0080 | Tree root and branch pruning (0110-22) | EACH | 35 | $600.00 | $330.00 | $613.53 | $1,000.00 | $428.51 | $688.00 |
| 0085 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 312 | $68.30 | $110.00 | $74.69 | $85.00 | $119.77 | $84.00 |
| 0090 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 15 | $165.00 | $140.00 | $213.40 | $200.00 | $238.53 | $239.00 |
| 0095 | Performance turf, sod (0570-1-2) | SY | 826 | $7.00 | $9.95 | $14.40 | $5.00 | $4.06 | $16.00 |
| 0100 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0105 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0110 | Conduit, furnish & install, open trench (0630-2-11) | LF | 7,975 | $9.70 | $8.50 | $12.64 | $18.00 | $13.12 | $12.00 |
| 0115 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 9,352 | $26.00 | $29.60 | $25.20 | $26.00 | $31.98 | $17.00 |
| 0120 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 142 | $1,450.00 | $1,320.00 | $951.99 | $1,400.00 | $1,525.96 | $1,445.00 |
| 0125 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $2,654.00 | $4,910.00 | $3,998.05 | $8,505.00 | $5,808.13 | $4,267.00 |
| 0130 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $1,991.00 | $3,110.00 | $2,875.03 | $3,500.00 | $2,423.60 | $1,645.00 |
| 0135 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $118,998 | $118,998 | $118,998 | $118,998 | $118,998 | $118,998 |
| 0140 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,002.00 | $2,170.00 | $2,243.68 | $3,000.00 | $1,416.42 | $1,390.00 |
| 0145 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 42,034 | $2.40 | $2.35 | $2.11 | $4.25 | $1.98 | $2.00 |
| 0150 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 64,272 | $3.40 | $3.40 | $3.79 | $5.00 | $2.90 | $3.00 |
| 0155 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 2 | $18,500 | $16,110 | $13,459 | $15,000 | $14,268 | $10,520 |
| 0160 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 7 | $1,063.00 | $1,230.00 | $1,404.17 | $1,200.00 | $1,187.37 | $861.00 |
| 0165 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352) | EACH | 6 | $12,523 | $15,680 | $14,620 | $10,000 | $20,869 | $20,043 |
| 0170 | Light pole complete, F&I, standard pole special foundation, 40' mounting height, 15' arm length (0715-62352) | EACH | 88 | $10,433 | $12,020 | $10,705 | $10,000 | $9,801.66 | $11,734 |
| 0175 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 3 | $11,616 | $16,050 | $14,597 | $10,000 | $23,811 | $20,016 |
| 0180 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 97 | $867.00 | $1,100.00 | $706.30 | $600.00 | $873.34 | $579.00 |
| 0185 | Fiber optic cable locator (0633-6) | DA | 381 | $43.40 | $27.00 | $133.38 | $150.00 | $152.92 | $103.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.