Under Power Corp: FDOT bid record
Under Power Corp submitted 29 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 26 AUG 2026, and was the low bidder on 3 of them (10%). When it was not low, its total sat a median +33% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $2,514,974
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 6 | 0 | 0% |
| 2019 | 5 | 0 | 0% |
| 2020 | 6 | 1 | 17% |
| 2021 | 7 | 2 | 29% |
| 2022 | 3 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 16 | 1 | 6% |
| District 6 | 13 | 2 | 15% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Arrow board / advance warning arrow panel | 0102-76 | ED | 29 | 6 (21%) | $7.30 | $5.90 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 37 | 5 (14%) | $27.20 | $30.82 |
| Work zone sign | 0102-60 | ED | 29 | 5 (17%) | $0.30 | $0.25 |
| Pole cable distribution system, furnish and install, conventional | 0715-500-1 | EACH | 19 | 5 (26%) | $843.00 | $816.00 |
| Inlet protection system | 0104-18 | EACH | 16 | 5 (31%) | $149.80 | $150.00 |
| Pedestrian detector, furnish & install, standard | 0665-1-11 | EACH | 10 | 5 (50%) | $183.10 | $327.75 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 29 | 4 (14%) | $0.20 | $0.13 |
| Lighting conductors, remove & dispose, contractor owns | 0715-1-60 | LF | 13 | 4 (31%) | $0.20 | $0.50 |
| Selective clearing and areas with trees to remain | 0110-2-2 | ACRE | 7 | 4 (57%) | $13,601 | $51,000 |
| Electrical service wire, | 0639-2-6 | LF | 5 | 4 (80%) | $0.10 | $1.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 29 | 3 (10%) | $14.20 | $12.00 |
| Performance turf, sod | 0570-1-2 | SY | 16 | 3 (19%) | $15.65 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aum Construction Inc. | 22 | 19 of 22 |
| Signal Technology and Installation Corp. | 16 | 10 of 16 |
| Arc Electric Inc | 13 | 12 of 13 |
| Weekley Asphalt Paving, Inc. | 13 | 3 of 13 |
| Powercore, Inc. | 9 | 5 of 9 |
| American Lighting and Signalization, LLC. | 9 | 5 of 9 |
| Horsepower Electric, Inc. | 8 | 5 of 8 |
| Florida Safety Contractors, Inc. | 5 | 4 of 5 |
| Traffic Control Devices, Inc. | 5 | 4 of 5 |
| Agc Electric, Inc. | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | T4773 | District 4 | SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1 | 13 of 13 | $4,847,918 | +87% |
| 25 JAN 2023 | T4636 | District 4 | SR 838 (SUNRISE BLVD) | 2 of 4 | $939,406 | +18% |
| 25 MAY 2022 | T4611 | District 4 | SR 5 (US 1) | 6 of 6 | $11,831,232 | +65% |
| 27 APR 2022 | T4601 | District 4 | NW 9TH AVE AND SR 845 (POWERLINE RD) | 6 of 6 | $1,942,284 | +56% |
| 26 JAN 2022 | T4597 | District 4 | SR 805 (DIXIE HWY) | 4 of 4 | $1,456,782 | +52% |
| 29 SEP 2021 | T6527 | District 6 | SR 909 (W DIXIE HWY) AND SR 915 (NE 6 AVE) | 6 of 7 | $754,341 | +44% |
| 28 JUL 2021 | T4574 | District 4 | SR 25 (US 27) | 2 of 6 | $654,303 | +5.0% |
| 26 MAY 2021 | T6509 | District 6 | SR 7 (NW 2ND AVE) | 3 of 6 | $795,860 | +2.0% |
| 17 FEB 2021 | T6480 | District 6 | SR 90 (SW 8TH ST) AND US 1 | 3 of 3 | $699,758 | +36% |
| 27 JAN 2021 | T4572 | District 4 | AUSTRALIAN AVE | 3 of 11 | $3,038,769 | +3.0% |
| 27 JAN 2021 | T6488 | District 6 | SR 973 (SW 87TH AVE) | 1 of 5 | $1,453,437 | Low, 7.0% under the second |
| 27 JAN 2021 | T6502 | District 6 | SR 953 (EAST 8 AVE) | 1 of 5 | $619,555 | Low, 7.0% under the second |
| 18 NOV 2020 | T6479 | District 6 | SR 826 (NE 163RD ST) AND SR 934 (NW 81ST ST/NW 82ND ST) | 2 of 4 | $599,934 | +8.0% |
| 18 NOV 2020 | T6497 | District 6 | SR 934 (NW 79 ST), SR 25 AND SR 934 (E 25TH ST) | 3 of 4 | $595,040 | +10% |
| 30 SEP 2020 | T4555 | District 4 | SR 845 (POWERLINE RD) | 1 of 6 | $441,982 | Low, 3.0% under the second |
| 30 SEP 2020 | T6501 | District 6 | SR 860/MIAMI GARDENS DR | 2 of 4 | $749,670 | +2.0% |
| 29 JUL 2020 | T4521 | District 4 | SR 823 (FLAMINGO RD) | 2 of 6 | $798,414 | +8.0% |
| 29 JUL 2020 | T6526 | District 6 | SR 90/SW 8TH ST | 3 of 4 | $381,846 | +9.0% |
| 30 OCT 2019 | T6493 | District 6 | HURRICANE IRMA PERMANENT REPAIRS | 2 of 2 | $3,800,473 | +45% |
| 22 MAY 2019 | T4520 | District 4 | SR 7 | 3 of 3 | $599,963 | +17% |
| 24 APR 2019 | T4512 | District 4 | SR 845 (POWERLINE ROAD) | 7 of 7 | $2,733,303 | +88% |
| 24 APR 2019 | T4516 | District 4 | SR 838 AND SR A1A | 7 of 7 | $2,023,182 | +31% |
| 24 APR 2019 | T4517 | District 4 | SR 816 AND SR 870 | 6 of 7 | $2,985,239 | +62% |
| 05 DEC 2018 | T6457 | District 6 | SR 5 (US 1) | 5 of 5 | $2,169,530 | +36% |
| 31 OCT 2018 | T6459 | District 6 | SR 7 (NW 7 AVE) | 3 of 3 | $2,414,909 | +34% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.