FDOT letting results, November 15, 2023
12 contracts let by Florida DOT on November 15, 2023, $76,614,402 in low bids, a median of 3.5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 12
- Low bids, total
- $76,614,402
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T5798 | SR 50 (W COLONIAL DR) FROM PINE HILLS RD TO TAMPA AVE | District 5 | 4 | Watson Civil Construction, Inc. | $16,797,190 | $18,180,559 | +8.0% | FDOT |
| T3882 | SR 83 (US 331) AND SR 30 (US 98) AT VARIOUS LOCATIONS AS ... | District 3 | 2 | Traffic Management Solutions, LLC | $10,161,964 | $11,164,164 | +10% | FDOT |
| T3872 | SR 30 (US 98) FROM W OF WAKULLA RIVER BRIDGE TO SR 267 ... | District 3 | 4 | M of Tallahassee, Inc. | $7,954,987 | $8,593,736 | +8.0% | FDOT |
| T2985 | SR 134 (103RD ST / TIMUQUANA RD) FROM SHINDLER DR TO FIRE... | District 2 | 4 | Reeves Construction Company | $7,308,506 | $8,255,149 | +13% | FDOT |
| T1881 | SR 563 FROM S OF BEAKER RD TO FOREST PARK ST | District 1 | 4 | Hubbard Construction Company | $6,196,035 | $6,656,093 | +7.0% | FDOT |
| T2975 | SR 47 (US 441) FROM SR 100A (NW BASCOM NORRIS DR TO I-10 | District 2 | 1 | Anderson Columbia Co., Inc. | $5,714,115 | FDOT | ||
| T4652 | SR 68 (ORANGE AVE) FROM N 32ND ST TO W OF SR 5 (US 1) | District 4 | 5 | C.W. Roberts Contracting, Inc. | $5,424,973 | $5,790,536 | +7.0% | FDOT |
| T5807 | SR 400 (I-4) FROM ADVENTURE WAY TO WB REST AREA | District 5 | 3 | Highway Safety Devices, Inc. | $5,376,805 | $5,955,505 | +11% | FDOT |
| T1866 | SR 15 (US 98) AND SR 15/SR 700, From SW 23RD ST TO SW 14 ... | District 1 | 5 | MJC Land Development, LLC | $3,945,642 | $4,069,180 | +3.0% | FDOT |
| T1862 | HARDEE, LEE, | District 1 | 2 | American Lighting and Signalization, LLC. | $3,737,000 | $4,821,615 | +29% | FDOT |
| T7513 | SR 616 (BOY SCOUT BLVD) FROM E OF MANHATTAN AVE TO W OF ... | District 7 | 3 | Preferred Materials Inc. | $2,131,372 | $2,859,225 | +34% | FDOT |
| T2949 | SR 13 (HENDRICKS AVE) AT SAN MARCO BLVD | District 2 | 2 | Janus Construction Corp. | $1,865,813 | $1,896,084 | +2.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.