FDOT contract T4757 bid tabulation
SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27). Let by Florida DOT on August 26, 2026, Broward, District 4. 12 bids received; low bid $6,106,000 by American Lighting and Signalization, LLC..
- Owner
- Florida DOT
- Letting
- 26 AUG 2026
- Pay items
- 63
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Lighting and Signalization, LLC. | $6,106,000 | Low |
| 2 | Traffic Management Solutions, LLC | $6,241,763 | +2.0% |
| 3 | Arc Electric Inc | $6,244,444 | +2.0% |
| 4 | Sice Inc | $6,581,603 | +8.0% |
| 5 | Florida Signal & Lighting Contractors, Inc. | $6,597,680 | +8.0% |
| 6 | Aum Construction Inc. | $6,969,999 | +14% |
| 7 | Signal Technology and Installation Corp. | $6,989,854 | +14% |
| 8 | Florida Engineering & Development Corp | $7,089,578 | +16% |
| 9 | Rtech Engineering, LLC | $7,329,162 | +20% |
| 10 | Jones Benitez Corporation | $7,688,761 | +26% |
| 11 | Horsepower Electric, Inc. | $7,995,263 | +31% |
| 12 | Ranger Construction Industries, Inc. | $8,526,888 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Lighting and Signalization, LLC. | 2. Traffic Management Solutions, LLC | 3. Arc Electric Inc | 4. Sice Inc | 5. Florida Signal & Lighting Contractors, Inc. | 6. Aum Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $561,594 | $585,521 | $30,000 | $723,630 | $400,000 | $550,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $110,280 | $191,166 | $185,000 | $136,855 | $366,000 | $275,000 |
| 0015 | Traffic control officer (0102-14) | HR | 240 | $141.81 | $111.33 | $85.00 | $106.26 | $85.00 | $80.00 |
| 0020 | Work zone sign (0102-60) | ED | 20,400 | $0.21 | $0.26 | $0.35 | $0.22 | $0.19 | $0.20 |
| 0025 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 3,588 | $26.63 | $41.24 | $32.00 | $35.42 | $30.00 | $35.00 |
| 0030 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 6,078 | $11.09 | $15.12 | $12.00 | $12.99 | $11.00 | $14.00 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 74,460 | $0.11 | $0.14 | $0.15 | $0.12 | $0.10 | $0.12 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 1,020 | $5.55 | $6.87 | $6.00 | $5.90 | $5.00 | $7.00 |
| 0045 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $937.52 | $1,642.58 | $875.00 | $997.69 | $845.00 | $1,000.00 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 1,048 | $9.60 | $11.89 | $9.00 | $10.21 | $8.65 | $10.00 |
| 0055 | Existing ITS maintenance (0102-112) | DA | 510 | $138.69 | $159.19 | $100.00 | $48.67 | $300.00 | $30.00 |
| 0060 | Sediment barrier (0104-10-3) | LF | 500 | $6.66 | $2.51 | $5.00 | $60.81 | $5.00 | $5.00 |
| 0065 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $42,311 | $3,536.30 | $12,000 | $3,187.89 | $25,000 | $5,000.00 |
| 0070 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $9,708.02 | $10,478 | $12,000 | $9,445.61 | $25,000 | $14,237 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $32,730 | $38,637 | $40,000 | $82,674 | $85,000 | $150,000 |
| 0080 | Removal of existing concrete (0110-4-10) | SY | 626 | $210.80 | $248.85 | $175.00 | $177.11 | $150.00 | $250.00 |
| 0085 | Type B stabilization (0160-4) | SY | 144 | $134.25 | $102.16 | $165.00 | $251.70 | $5.00 | $55.00 |
| 0090 | Optional base, base group 15 (0285-715) | SY | 288 | $188.61 | $163.72 | $285.00 | $202.75 | $115.00 | $210.00 |
| 0095 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 3,804 | $3.94 | $4.65 | $6.00 | $3.11 | $9.00 | $10.00 |
| 0100 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 120 | $439.91 | $519.31 | $1,100.00 | $1,683.24 | $291.00 | $450.00 |
| 0105 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 152.20 | $360.03 | $425.01 | $450.00 | $438.51 | $325.00 | $500.00 |
| 0110 | Concrete barrier, with slab, 36" single slope (0521-8-7) | LF | 647 | $1,303.65 | $749.29 | $850.00 | $510.77 | $900.00 | $1,500.00 |
| 0115 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0120 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $72,142 | $72,142 | $72,142 | $72,142 | $72,142 | $72,142 |
| 0125 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 46 | $2,218.98 | $1,002.35 | $700.00 | $2,148.88 | $2,500.00 | $2,000.00 |
| 0130 | Enhanced highway sign AC powered, F&I ground mount, W/eds and beacon, 12-20 SF of static sign panels (0700-141172) | EACH | 2 | $15,105 | $17,472 | $15,000 | $9,355.14 | $15,000 | $18,000 |
| 0135 | Raised pavement marker, type B (0706-1-3) | EACH | 276 | $11.09 | $13.10 | $12.00 | $5.90 | $10.00 | $6.00 |
| 0140 | Painted pavement markings, surface (0710-90) | LS | 1 | $11,095 | $13,097 | $12,000 | $8,841.27 | $8,000.00 | $10,000 |
| 0145 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,556 | $8.88 | $10.48 | $10.00 | $3.93 | $4.00 | $6.00 |
| 0150 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.06 | $8,321.16 | $9,823.04 | $8,000.00 | $5,920.04 | $8,000.00 | $15,000 |
| 0155 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.89 | $9,430.64 | $11,133 | $9,000.00 | $7,659.21 | $7,000.00 | $9,000.00 |
| 0160 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 0.10 | $8,321.16 | $9,823.04 | $8,000.00 | $2,538.51 | $3,000.00 | $5,000.00 |
| 0165 | Conduit, furnish & install, open trench (0630-2-11) | LF | 32,266 | $10.75 | $12.39 | $12.00 | $9.46 | $18.00 | $16.00 |
| 0170 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 15,797 | $19.42 | $28.90 | $25.00 | $29.07 | $24.00 | $30.00 |
| 0175 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 860 | $24.86 | $43.05 | $50.00 | $43.10 | $30.00 | $40.00 |
| 0180 | Conduit, furnish & install, mount (0630-2-15) | LF | 331 | $24.43 | $42.12 | $35.00 | $77.34 | $30.00 | $70.00 |
| 0185 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 214 | $868.52 | $1,581.76 | $1,200.00 | $1,026.68 | $1,700.00 | $2,000.00 |
| 0190 | Junction box, furnish & install, mounted (0635-3-12) | EACH | 8 | $867.81 | $1,056.10 | $1,200.00 | $944.56 | $900.00 | $1,200.00 |
| 0195 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 20 | $793.83 | $790.66 | $1,200.00 | $944.56 | $900.00 | $1,200.00 |
| 0200 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 5 | $4,182.87 | $5,552.99 | $6,800.00 | $4,377.45 | $5,000.00 | $7,000.00 |
| 0205 | Electrical service wire, & install (0639-2-1) | LF | 8,341 | $5.10 | $9.92 | $10.00 | $5.68 | $10.00 | $12.00 |
| 0210 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $1,871.40 | $2,547.95 | $2,200.00 | $2,259.27 | $3,500.00 | $2,500.00 |
| 0215 | Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111) | EACH | 2 | $1,051.33 | $2,254.09 | $5,010.00 | $2,472.98 | $5,000.00 | $4,000.00 |
| 0220 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 0225 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 2 | $1,490.83 | $1,864.53 | $2,800.00 | $3,065.79 | $2,900.00 | $2,000.00 |
| 0230 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 10 | $1,655.22 | $1,766.43 | $3,000.00 | $3,107.28 | $2,900.00 | $2,000.00 |
| 0235 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 61,946 | $1.83 | $2.21 | $4.00 | $1.90 | $3.00 | $2.80 |
| 0240 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 74,534 | $4.26 | $3.76 | $6.00 | $3.34 | $4.50 | $4.00 |
| 0245 | Lighting conductors, F&I, no.1/0 3/0 (0 to 000) (0715-1-15) | LF | 1,073 | $8.57 | $7.08 | $22.00 | $5.51 | $10.00 | $10.00 |
| 0250 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 5 | $12,864 | $15,158 | $15,000 | $13,935 | $21,500 | $18,000 |
| 0255 | Luminaire, F&I, under deck, wall mount (0715-11125) | EACH | 2 | $795.01 | $1,523.64 | $1,499.00 | $1,161.22 | $1,960.00 | $1,000.00 |
| 0260 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 120 | $1,334.30 | $1,137.93 | $1,300.00 | $1,564.43 | $1,450.00 | $1,100.00 |
| 0265 | Luminaire, remove (0715-11500) | EACH | 2 | $428.51 | $150.35 | $750.00 | $340.04 | $100.00 | $250.00 |
| 0270 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 11 | $9,702.70 | $8,802.87 | $10,000 | $9,474.97 | $8,000.00 | $7,800.00 |
| 0275 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352) | EACH | 2 | $9,879.50 | $8,858.92 | $10,000 | $9,525.50 | $8,500.00 | $8,250.00 |
| 0280 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442) | EACH | 113 | $10,083 | $9,209.28 | $10,000 | $9,828.71 | $8,000.00 | $8,200.00 |
| 0285 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 14 | $10,146 | $9,265.34 | $11,000 | $9,879.24 | $8,000.00 | $7,900.00 |
| 0290 | Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 15' arm length (0715-61552) | EACH | 4 | $11,126 | $10,709 | $12,000 | $11,143 | $8,500.00 | $9,100.00 |
| 0295 | Light pole complete, F&I, standard pole special foundation, 40' mounting height, 15' arm length (0715-62352) | EACH | 26 | $9,933.34 | $11,785 | $20,000 | $26,955 | $16,900 | $11,500 |
| 0300 | Light pole complete, F&I, standard pole special foundation, 45' mounting height, 15' arm length (0715-62452) | EACH | 4 | $11,535 | $13,180 | $20,000 | $24,792 | $16,900 | $12,000 |
| 0305 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 6 | $4,830.25 | $542.11 | $1,000.00 | $680.08 | $1,000.00 | $1,500.00 |
| 0310 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 178 | $569.51 | $652.48 | $650.00 | $845.38 | $750.00 | $750.00 |
| 0315 | Fiber optic cable locator (0633-6) | DA | 510 | $127.59 | $165.39 | $75.00 | $94.46 | $100.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.