FDOT contract T5851 bid tabulation
SR 500 (US 441) FROM N OF SR 50 TO SR 414 INTERCHANGE RAMPS. Let by Florida DOT on June 11, 2025, Orange, District 5. 5 bids received; low bid $35,181,705 by JR. Davis Construction Co., Inc..
- Owner
- Florida DOT
- Letting
- 11 JUN 2025
- Pay items
- 344
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | JR. Davis Construction Co., Inc. | $35,181,705 | Low |
| 2 | Hubbard Construction Company | $38,677,299 | +10% |
| 3 | Southland Construction, Inc. | $38,777,778 | +10% |
| 4 | Ranger Construction Industries, Inc. | $39,332,112 | +12% |
| 5 | Masci General Contractors, Inc | $39,625,060 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. JR. Davis Construction Co., Inc. | 2. Hubbard Construction Company | 3. Southland Construction, Inc. | 4. Ranger Construction Industries, Inc. | 5. Masci General Contractors, Inc |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $800,000 | $1,357,288 | $808,491 | $1,193,873 | $1,249,159 |
| 0010 | Mobilization (0101-1) | LS | 1 | $2,550,000 | $1,703,755 | $1,610,000 | $2,739,752 | $1,249,159 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $210,000 | $313,441 | $300,000 | $513,000 | $328,900 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $325,000 | $1,621,297 | $2,000,000 | $515,000 | $328,900 |
| 0025 | Special detour- temporary pavement (0102-2200) | SY | 1 | $325,000 | $485,867 | $510,000 | $327,000 | $290,360 |
| 0030 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $60,000 | $19,713 | $34,000 | $143,000 | $11,579 |
| 0035 | Traffic control officer (0102-14) | HR | 136 | $250.00 | $101.85 | $102.00 | $105.90 | $97.50 |
| 0040 | Pedestrian escort operation (0102-25100) | HR | 1,500 | $72.00 | $44.47 | $46.00 | $39.55 | $72.50 |
| 0045 | Work zone sign (0102-60) | ED | 433,020 | $0.02 | $0.18 | $0.20 | $0.20 | $0.24 |
| 0050 | Business sign (0102-61) | EACH | 30 | $40.70 | $0.32 | $0.35 | $0.35 | $23.00 |
| 0055 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 690 | $100.00 | $42.88 | $45.40 | $47.05 | $45.00 |
| 0060 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 65 | $50.00 | $96.49 | $105.70 | $105.90 | $39.50 |
| 0065 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 163 | $45.00 | $26.80 | $29.00 | $29.40 | $20.00 |
| 0070 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 1,458,900 | $0.05 | $0.09 | $0.10 | $0.10 | $0.12 |
| 0075 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 392,999 | $0.06 | $0.04 | $0.05 | $0.05 | $0.08 |
| 0080 | Arrow board / advance warning arrow panel (0102-76) | ED | 61,110 | $0.10 | $4.29 | $4.85 | $4.70 | $4.90 |
| 0085 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 6,870 | $6.40 | $4.87 | $5.45 | $5.30 | $5.18 |
| 0090 | Temporary crash cushion, redirective option (0102-89-1) | LO | 2 | $2,250.00 | $1,045.31 | $1,185.00 | $6,420.00 | $1,400.00 |
| 0095 | Portable changeable message sign, temporary (0102-99) | ED | 10,500 | $9.60 | $8.58 | $9.70 | $9.40 | $12.00 |
| 0100 | Temporary signalization and maintenance, intersection (0102-104) | ED | 7,280 | $9.00 | $19.76 | $20.00 | $9.70 | $10.13 |
| 0105 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 7,280 | $9.00 | $1.08 | $1.10 | $9.70 | $10.13 |
| 0110 | Type III barricade (0102-115) | ED | 2,460 | $0.30 | $0.25 | $0.28 | $0.25 | $0.28 |
| 0115 | Portable regulatory, sign (0102-150-1) | ED | 8,320 | $4.30 | $4.29 | $4.85 | $4.70 | $5.00 |
| 0120 | Radar speed display unit (0102-150-2) | ED | 8,320 | $4.30 | $4.29 | $4.85 | $4.70 | $5.00 |
| 0125 | Removable tape, white, 12" crosswalk (0102-913-24) | LF | 525 | $5.85 | $4.22 | $5.75 | $4.60 | $4.49 |
| 0130 | Sediment barrier (0104-10-3) | LF | 75,971 | $5.50 | $1.08 | $1.14 | $2.25 | $1.50 |
| 0135 | Soil tracking prevention device (0104-15) | EACH | 2 | $7,500.00 | $3,259.21 | $3,200.00 | $5,230.00 | $3,850.00 |
| 0140 | Inlet protection system (0104-18) | EACH | 286 | $150.00 | $216.03 | $149.75 | $229.40 | $200.00 |
| 0145 | Litter removal (0107-1) | ACRE | 1,204.32 | $45.00 | $73.98 | $28.00 | $81.20 | $75.00 |
| 0150 | Mowing (0107-2) | ACRE | 1,204.32 | $65.00 | $111.50 | $85.00 | $122.40 | $114.00 |
| 0155 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $18,500 | $32,899 | $11,500 | $62,200 | $6,500.00 |
| 0160 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $15,000 | $17,583 | $5,000.00 | $34,500 | $7,100.00 |
| 0165 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $125,000 | $412,478 | $90,000 | $316,024 | $303,237 |
| 0170 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $75,000 | $16,368 | $5,000.00 | $7,510.00 | $5,000.00 |
| 0175 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $125,000 | $16,368 | $5,000.00 | $30,900 | $7,500.00 |
| 0180 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $632,000 | $398,292 | $200,000 | $810,331 | $267,597 |
| 0185 | Removal of existing structures/bridges (0110-3) | SF | 1 | $20,000 | $69,237 | $28,000 | $21,100 | $19,800 |
| 0190 | Removal of existing concrete (0110-4-10) | SY | 14,595 | $14.00 | $34.92 | $11.25 | $6.25 | $29.45 |
| 0195 | Regular excavation (0120-1) | CY | 8,782 | $16.00 | $41.47 | $13.00 | $58.50 | $17.25 |
| 0200 | Subsoil excavation (0120-4) | CY | 488 | $40.00 | $45.83 | $29.00 | $66.00 | $27.35 |
| 0205 | Embankment (0120-6) | CY | 8,080 | $30.00 | $34.92 | $34.00 | $45.30 | $24.90 |
| 0210 | Type B stabilization (0160-4) | SY | 21,105 | $25.00 | $19.64 | $19.00 | $37.65 | $9.15 |
| 0215 | Optional base, base group 01 (0285-701) | SY | 20,711 | $37.50 | $27.87 | $27.69 | $27.50 | $25.95 |
| 0220 | Optional base, base group 06 (0285-706) | SY | 67 | $200.00 | $39.28 | $200.00 | $143.80 | $75.98 |
| 0225 | Optional base, base group 09 (0285-709) | SY | 4,067 | $70.00 | $41.47 | $45.30 | $56.50 | $39.56 |
| 0230 | Optional base, base group 11 (0285-711) | SY | 1,289 | $84.00 | $43.65 | $51.40 | $58.50 | $45.75 |
| 0235 | Turnout base- optional materials (0286-1) | SY | 1,140 | $54.00 | $58.39 | $20.00 | $78.30 | $55.69 |
| 0240 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 35,798 | $2.50 | $4.79 | $5.56 | $5.40 | $3.15 |
| 0245 | Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3) | SY | 3,712 | $3.90 | $7.60 | $8.80 | $7.35 | $4.75 |
| 0250 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 72,589 | $2.00 | $3.62 | $4.20 | $4.25 | $3.25 |
| 0255 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 19,207 | $3.50 | $11.52 | $13.34 | $7.40 | $2.95 |
| 0260 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 9,980 | $2.50 | $5.16 | $5.96 | $4.95 | $2.99 |
| 0265 | Milling existing asphalt pavement, 5 1/2" avg depth (0327-70-18) | SY | 1,178 | $24.00 | $25.39 | $29.40 | $32.45 | $4.95 |
| 0270 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 2,571 | $2.70 | $5.73 | $6.64 | $7.30 | $2.25 |
| 0275 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 37,749 | $3.50 | $6.45 | $7.43 | $3.35 | $3.50 |
| 0280 | Milling existing asphalt pavement, 4 1/4" avg depth (0327-70-22) | SY | 82,461 | $4.40 | $7.21 | $8.34 | $8.15 | $4.15 |
| 0285 | Milling existing asphalt pavement, 8 1/4" avg depth (0327-70-35) | SY | 2,124 | $26.00 | $36.80 | $42.56 | $68.30 | $9.57 |
| 0290 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 58.70 | $228.00 | $693.14 | $801.35 | $1,060.00 | $159.70 |
| 0295 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 36,389.70 | $169.00 | $179.86 | $208.85 | $182.70 | $167.59 |
| 0300 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 5,774.90 | $256.00 | $270.80 | $313.25 | $258.70 | $203.58 |
| 0305 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 11,184.40 | $183.00 | $203.10 | $234.90 | $175.70 | $185.29 |
| 0310 | Miscellaneous asphalt (0339-1) | TN | 42.40 | $275.00 | $803.69 | $452.00 | $552.50 | $587.00 |
| 0315 | Concrete pavement for roundabout apron, 12" depth (0350-30-13) | SY | 70 | $208.00 | $283.72 | $136.00 | $522.50 | $159.97 |
| 0320 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 896.60 | $1,450.00 | $1,254.89 | $1,510.00 | $1,150.00 | $1,257.00 |
| 0325 | Conc class IV, retaining walls (0400-4-11) | CY | 67.60 | $2,100.00 | $1,964.18 | $3,042.00 | $2,000.00 | $1,789.00 |
| 0330 | Reinforcing steel- retaining wall (0415-1-3) | LB | 3,966 | $1.80 | $13.09 | $1.82 | $2.35 | $1.89 |
| 0335 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 1 | $12,100 | $13,422 | $13,600 | $11,800 | $11,290 |
| 0340 | Inlets, curb, type P-3, partial (0425-1335) | EACH | 1 | $11,300 | $10,039 | $8,400.00 | $12,500 | $5,795.00 |
| 0345 | Inlets, curb, type P-4, partial (0425-1345) | EACH | 2 | $11,250 | $13,640 | $8,400.00 | $13,400 | $6,950.00 |
| 0350 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 2 | $8,100.00 | $13,968 | $13,000 | $11,700 | $12,200 |
| 0355 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 3 | $8,700.00 | $11,349 | $7,300.00 | $10,100 | $5,352.00 |
| 0360 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 2 | $8,750.00 | $11,785 | $8,400.00 | $9,020.00 | $6,513.00 |
| 0365 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 1 | $17,200 | $18,332 | $33,500 | $33,000 | $17,627 |
| 0370 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 3 | $6,400.00 | $8,184.09 | $9,000.00 | $6,710.00 | $6,910.00 |
| 0375 | Inlets, DT bot, type C,jbot, <10' (0425-1523) | EACH | 2 | $11,800 | $15,277 | $11,060 | $9,080.00 | $11,934 |
| 0380 | Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531) | EACH | 2 | $7,400.00 | $8,729.70 | $6,770.00 | $4,240.00 | $7,050.00 |
| 0385 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 14 | $6,800.00 | $10,476 | $10,650 | $8,140.00 | $7,796.00 |
| 0390 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 2 | $12,800 | $18,769 | $13,300 | $15,700 | $15,177 |
| 0395 | Inlets, closed flume (0425-1910) | EACH | 1 | $2,400.00 | $12,003 | $8,600.00 | $5,880.00 | $8,295.00 |
| 0400 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $5,800.00 | $12,985 | $8,600.00 | $6,400.00 | $8,980.00 |
| 0405 | Manholes, P-8, <10' (0425-2-61) | EACH | 4 | $5,900.00 | $10,148 | $9,020.00 | $6,550.00 | $9,520.00 |
| 0410 | Manholes, P-8, partial (0425-2-63) | EACH | 4 | $5,700.00 | $8,184.09 | $5,530.00 | $7,600.00 | $5,425.00 |
| 0415 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $6,500.00 | $19,642 | $11,900 | $7,770.00 | $12,590 |
| 0420 | Manhole, adjust (0425-5) | EACH | 5 | $700.00 | $1,636.82 | $2,100.00 | $1,650.00 | $1,295.00 |
| 0425 | Manhole, adjust, utilities (0425-5-1) | EACH | 2 | $700.00 | $2,182.43 | $2,300.00 | $1,970.00 | $1,800.00 |
| 0430 | Valve boxes, adjust (0425-6) | EACH | 16 | $925.00 | $872.97 | $654.85 | $753.00 | $350.00 |
| 0435 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 161 | $180.00 | $196.42 | $452.00 | $179.50 | $179.57 |
| 0440 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 528 | $220.00 | $207.33 | $307.08 | $146.70 | $189.21 |
| 0445 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 235 | $210.00 | $245.52 | $267.00 | $138.90 | $271.15 |
| 0450 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 450 | $235.00 | $272.80 | $310.00 | $202.10 | $309.45 |
| 0455 | Pipe culvert, optional material, other shape - ellip/arch, 30"SD (0430-174230) | LF | 281 | $290.00 | $300.08 | $411.00 | $269.50 | $415.75 |
| 0460 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 738 | $180.00 | $196.42 | $306.00 | $150.90 | $179.57 |
| 0465 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 96 | $260.00 | $207.33 | $419.40 | $210.10 | $189.21 |
| 0470 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 303 | $280.00 | $245.52 | $410.80 | $214.10 | $259.97 |
| 0475 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 2 | $4,000.00 | $2,728.03 | $4,400.00 | $3,320.00 | $4,500.00 |
| 0480 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 3 | $3,200.00 | $2,728.03 | $2,700.00 | $2,710.00 | $3,900.00 |
| 0485 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 17 | $4,000.00 | $2,728.03 | $4,400.00 | $3,320.00 | $4,200.00 |
| 0490 | Mitered end section , optional round, 30" SD (0430-984133) | EACH | 2 | $7,300.00 | $4,146.61 | $9,000.00 | $8,710.00 | $6,500.00 |
| 0495 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $3,000.00 | $2,728.03 | $2,600.00 | $2,830.00 | $4,000.00 |
| 0500 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 1 | $6,400.00 | $2,728.03 | $8,000.00 | $6,060.00 | $4,500.00 |
| 0505 | Mitered end sect, optional /ellip/arch, 30" SD (0430-984633) | EACH | 7 | $6,500.00 | $4,146.60 | $4,700.00 | $6,680.00 | $7,900.00 |
| 0510 | Sheet piling steel, F&I (0455-133-3) | SF | 4,009 | $65.00 | $59.23 | $53.49 | $64.90 | $75.69 |
| 0515 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 4,464 | $50.00 | $57.69 | $60.16 | $52.90 | $59.36 |
| 0520 | Pipe handrail - guiderail, relocate, aluminum (0515-1-42) | LF | 34 | $75.00 | $75.10 | $78.00 | $52.90 | $39.10 |
| 0525 | Pedestrian / bicycle railing, aluminum, 42" type 2 (0515-2312) | LF | 595 | $85.00 | $103.40 | $107.00 | $93.70 | $109.25 |
| 0530 | Concrete curb & gutter, type E (0520-1-7) | LF | 1,991 | $42.00 | $43.65 | $55.00 | $59.30 | $47.59 |
| 0535 | Concrete curb & gutter, type F (0520-1-10) | LF | 4,996 | $65.00 | $46.92 | $54.75 | $91.60 | $51.20 |
| 0540 | Concrete curb, type A (0520-2-1) | LF | 4,724 | $31.00 | $38.19 | $50.60 | $45.75 | $35.40 |
| 0545 | Concrete curb, type B (0520-2-2) | LF | 50 | $85.00 | $81.84 | $49.00 | $128.20 | $65.50 |
| 0550 | Concrete curb, type D (0520-2-4) | LF | 150 | $44.20 | $81.84 | $49.60 | $56.10 | $59.40 |
| 0555 | Concrete curb, type RA (0520-2-8) | LF | 161 | $58.00 | $81.84 | $46.60 | $76.70 | $55.21 |
| 0560 | Valley gutter- concrete (0520-3) | LF | 81 | $56.00 | $54.56 | $49.75 | $82.10 | $69.25 |
| 0565 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 4 | $351.00 | $545.61 | $34.05 | $147.00 | $357.25 |
| 0570 | Traffic separator concrete- type I, 6' wide (0520-5-12) | LF | 870 | $231.00 | $190.96 | $51.00 | $147.00 | $159.90 |
| 0575 | Concrete traffic separator, special- variable width (0520-70) | SY | 739 | $550.00 | $201.87 | $85.10 | $376.50 | $169.00 |
| 0580 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 3,872 | $82.00 | $70.93 | $77.75 | $96.70 | $97.90 |
| 0585 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 24,533 | $75.00 | $81.84 | $86.30 | $86.10 | $105.29 |
| 0590 | Bus boarding pad- concrete (0522-3) | SY | 138 | $169.00 | $136.40 | $96.00 | $239.30 | $129.50 |
| 0595 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 165 | $231.00 | $70.93 | $113.40 | $480.50 | $62.50 |
| 0600 | Conc core ditch blocks (0524-3) | CY | 1.70 | $4,710.00 | $2,728.03 | $4,500.00 | $10,800 | $2,750.00 |
| 0605 | Detectable warnings (0527-2) | SF | 2,862 | $40.00 | $49.10 | $29.50 | $51.20 | $29.50 |
| 0610 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 99.90 | $399.00 | $300.08 | $242.00 | $229.10 | $229.23 |
| 0615 | Bedding stone (0530-74) | TN | 29.30 | $600.00 | $245.52 | $417.00 | $68.20 | $169.25 |
| 0620 | Guardrail -roadway, general (0536-1-1) | LF | 125 | $36.40 | $37.01 | $38.50 | $40.00 | $38.08 |
| 0625 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $4,440.00 | $4,517.04 | $4,700.00 | $4,880.00 | $4,648.00 |
| 0630 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 641 | $29.30 | $29.93 | $27.20 | $32.20 | $30.64 |
| 0635 | Fencing, type B, 5.1-6.0, reset existing (0550-10228) | LF | 36 | $35.70 | $36.47 | $14.00 | $39.20 | $37.34 |
| 0640 | Performance turf, sod (0570-1-2) | SY | 70,126 | $7.70 | $8.75 | $3.85 | $7.05 | $4.15 |
| 0645 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 489 | $106.00 | $11.20 | $4.00 | $12.00 | $6.75 |
| 0650 | Conduit, furnish & install, open trench (0630-2-11) | LF | 8 | $20.00 | $43.32 | $45.40 | $17.30 | $19.39 |
| 0655 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 196 | $26.00 | $33.03 | $34.60 | $25.60 | $25.36 |
| 0660 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,400.00 | $1,261.63 | $1,320.00 | $1,470.00 | $1,939.19 |
| 0665 | Electrical power service- contribution in aid of construction (ciac), duke (DO not bid) (0639-8100) | LS | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 0670 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 16 | $3,000.00 | $3,097.22 | $3,246.26 | $3,200.00 | $3,342.75 |
| 0675 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 16 | $1,900.00 | $2,176.72 | $2,281.46 | $2,180.00 | $2,276.35 |
| 0680 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 3 | $7,000.00 | $8,013.79 | $8,399.41 | $8,010.00 | $8,359.31 |
| 0685 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 5 | $700.00 | $920.50 | $964.80 | $776.50 | $810.00 |
| 0690 | Raised pavement marker, type B (0706-1-3) | EACH | 340 | $5.00 | $4.87 | $5.45 | $5.30 | $5.18 |
| 0695 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 59.84 | $1,440.00 | $2,165.64 | $1,547.62 | $2,590.00 | $89,456 |
| 0700 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 1.43 | $2,340.00 | $2,582.69 | $2,506.47 | $3,510.00 | $2,760.00 |
| 0705 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 488 | $2.00 | $1.08 | $2.01 | $1.20 | $1.15 |
| 0710 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 5,940 | $2.35 | $1.90 | $2.52 | $2.05 | $2.01 |
| 0715 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 17,745 | $2.85 | $2.17 | $3.04 | $2.35 | $2.30 |
| 0720 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 32.56 | $450.00 | $920.50 | $481.54 | $1,000.00 | $862.50 |
| 0725 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 9.68 | $780.00 | $1,028.48 | $830.97 | $1,120.00 | $977.50 |
| 0730 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 213 | $66.00 | $70.39 | $71.08 | $76.50 | $74.75 |
| 0735 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 973 | $45.00 | $48.73 | $48.15 | $52.90 | $51.75 |
| 0740 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 132 | $5.40 | $5.41 | $5.73 | $5.90 | $5.75 |
| 0745 | Painted pavement markings, standard, white, island nose (0710-11190) | SF | 137 | $5.40 | $5.41 | $5.73 | $5.90 | $5.75 |
| 0750 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 31.96 | $1,710.00 | $2,165.75 | $1,834.32 | $2,590.00 | $1,495.00 |
| 0755 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 2,862 | $2.50 | $1.90 | $2.52 | $2.05 | $2.01 |
| 0760 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 5.32 | $780.00 | $1,027.25 | $835.70 | $1,120.00 | $977.50 |
| 0765 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 3,557 | $5.40 | $5.41 | $5.73 | $5.90 | $5.75 |
| 0770 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 12 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0775 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0780 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $45,000 | $45,000 | $45,000 | $45,000 | $45,000 |
| 0785 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 |
| 0790 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 196 | $660.00 | $544.22 | $567.53 | $720.00 | $718.46 |
| 0795 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 25 | $1,660.00 | $2,693.89 | $2,809.26 | $1,810.00 | $1,803.82 |
| 0800 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 10 | $2,050.00 | $2,993.22 | $3,121.40 | $2,240.00 | $2,235.60 |
| 0805 | Single column ground sign assembly, relocate (0700-1500) | EACH | 36 | $310.00 | $1,469.40 | $1,532.33 | $338.00 | $337.50 |
| 0810 | Single column ground sign assembly, remove (0700-1600) | EACH | 209 | $124.00 | $32.65 | $34.05 | $135.30 | $135.00 |
| 0815 | Single column ground sign assembly, F&I cantilever mount, less than 12 SF (0700-1911) | EACH | 6 | $5,900.00 | $3,265.33 | $3,405.17 | $6,390.00 | $6,373.61 |
| 0820 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $6,200.00 | $7,074.87 | $7,377.86 | $6,720.00 | $6,706.80 |
| 0825 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $1,980.00 | $2,721.10 | $2,837.64 | $2,160.00 | $2,160.00 |
| 0830 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 3 | $124.00 | $272.11 | $283.76 | $135.30 | $135.00 |
| 0835 | Sign panel, relocate, 12-20 SF (0700-3502) | EACH | 28 | $248.00 | $163.27 | $170.26 | $270.60 | $270.00 |
| 0840 | Enhanced highway sign solar powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-142131) | EACH | 12 | $13,500 | $10,521 | $22,701 | $14,900 | $14,840 |
| 0845 | Tubular marker, 36" white post (0704-1-3) | EACH | 14 | $237.00 | $244.90 | $255.39 | $355.50 | $235.00 |
| 0850 | Tubular marker, 36" yellow (0704-1-4) | EACH | 73 | $234.00 | $244.90 | $255.39 | $355.50 | $235.00 |
| 0855 | Object marker, type 1 (0705-10-1) | EACH | 26 | $120.00 | $326.53 | $340.52 | $131.30 | $131.06 |
| 0860 | Delineator, non-flexible (0705-11-2) | EACH | 10 | $198.00 | $136.06 | $141.88 | $216.50 | $216.00 |
| 0865 | Raised pavement marker, type B (0706-1-3) | EACH | 6,684 | $5.10 | $4.87 | $5.45 | $5.30 | $5.18 |
| 0870 | Painted pavement markings, standard, white, island nose (0710-11190) | SF | 46 | $5.40 | $5.41 | $5.73 | $5.90 | $5.75 |
| 0875 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 1,214 | $5.40 | $5.41 | $5.73 | $5.90 | $5.75 |
| 0880 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,700.00 | $5,414.73 | $8,254.95 | $5,880.00 | $5,750.00 |
| 0885 | Painted pavement markings, surface (0710-90) | LS | 1 | $89,000 | $226,335 | $95,161 | $176,000 | $109,250 |
| 0890 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.51 | $20,000 | $9,864.44 | $21,001 | $10,700 | $10,580 |
| 0895 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,805 | $3.45 | $3.79 | $3.67 | $4.10 | $4.03 |
| 0900 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,980 | $5.10 | $5.41 | $5.45 | $5.90 | $5.75 |
| 0905 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 2,345 | $9.60 | $7.58 | $10.32 | $8.25 | $8.05 |
| 0910 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 3.26 | $3,100.00 | $2,704.04 | $3,320.83 | $2,940.00 | $2,875.00 |
| 0915 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 23 | $171.00 | $162.44 | $183.44 | $176.50 | $172.50 |
| 0920 | Thermoplastic, standard, arrow (0711-11170) | EACH | 293 | $80.00 | $108.29 | $85.99 | $117.70 | $115.00 |
| 0925 | Thermoplastic, standard, yield line (0711-11180) | LF | 58 | $10.00 | $21.66 | $9.75 | $23.55 | $23.00 |
| 0930 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 969 | $4.80 | $5.41 | $5.16 | $5.90 | $5.75 |
| 0935 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.78 | $3,090.00 | $2,695.18 | $3,309.96 | $2,930.00 | $2,875.00 |
| 0940 | Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123) | LF | 5,968 | $7.50 | $8.77 | $8.03 | $9.55 | $9.32 |
| 0945 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 6,572 | $15.00 | $15.16 | $16.05 | $16.45 | $16.10 |
| 0950 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 59 | $230.00 | $270.74 | $246.50 | $294.10 | $287.50 |
| 0955 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 52 | $161.00 | $108.29 | $171.98 | $117.70 | $115.00 |
| 0960 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 94 | $9.60 | $5.41 | $10.32 | $5.90 | $5.75 |
| 0965 | Thermoplastic, preformed, 12" white with 4" outside black contrast on concrete railroad dynamic envelope (0711-14194) | LF | 1,572 | $11.00 | $19.49 | $11.47 | $21.20 | $20.70 |
| 0970 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 8.80 | $4,810.00 | $6,060.35 | $5,155.83 | $6,580.00 | $6,440.00 |
| 0975 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 5.41 | $1,710.00 | $1,838.62 | $1,832.06 | $2,000.00 | $1,955.00 |
| 0980 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 4.82 | $4,810.00 | $5,736.04 | $5,156.14 | $6,230.00 | $6,095.00 |
| 0985 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 11.62 | $4,170.00 | $5,414.26 | $4,471.05 | $5,880.00 | $5,750.00 |
| 0990 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 5.26 | $1,500.00 | $1,623.80 | $1,604.52 | $1,760.00 | $1,725.00 |
| 0995 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.93 | $4,170.00 | $5,407.42 | $4,465.40 | $5,870.00 | $5,750.00 |
| 1000 | Permanent tape, white, solid, 18" (0713-100-6) | LF | 170 | $27.80 | $19.49 | $29.81 | $21.20 | $20.70 |
| 1005 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.26 | $43,000 | $43,903 | $46,481 | $47,700 | $48,300 |
| 1010 | Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102) | GM | 0.07 | $51,000 | $44,984 | $55,033 | $48,900 | $51,750 |
| 1015 | Permanent tape, white, 3-9 dotted, 12" wide, for concrete surfaces (0713-103173) | GM | 0.04 | $31,000 | $1,999.23 | $32,632 | $29,000 | $27,600 |
| 1020 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.21 | $26,000 | $12,617 | $27,828 | $13,700 | $13,800 |
| 1025 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.31 | $45,000 | $45,337 | $47,999 | $49,300 | $48,300 |
| 1030 | Preformed/permanent tape, remove (0713-107) | SF | 1,630 | $4.50 | $5.41 | $4.00 | $5.90 | $5.75 |
| 1035 | Conduit, furnish & install, open trench (0630-2-11) | LF | 851 | $16.00 | $13.00 | $13.60 | $17.30 | $20.74 |
| 1040 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,685 | $27.00 | $23.82 | $24.95 | $28.80 | $28.71 |
| 1045 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 39 | $1,350.00 | $2,268.77 | $2,375.00 | $1,470.00 | $1,534.19 |
| 1050 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,514 | $2.00 | $2.98 | $3.12 | $2.20 | $2.31 |
| 1055 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 6,323 | $3.00 | $3.25 | $3.41 | $3.70 | $3.86 |
| 1060 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 5,973 | $1.00 | $1.08 | $1.14 | $0.65 | $0.68 |
| 1065 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 10' arm length (0715-61221) | EACH | 4 | $9,800.00 | $9,524.50 | $9,982.00 | $10,800 | $11,595 |
| 1070 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442) | EACH | 6 | $11,500 | $11,100 | $11,630 | $12,300 | $13,180 |
| 1075 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 8 | $1,250.00 | $1,954.72 | $2,049.00 | $1,290.00 | $1,350.00 |
| 1080 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 10 | $860.00 | $860.94 | $902.30 | $907.50 | $946.68 |
| 1085 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 10.09 | $3,000.00 | $1,754.77 | $1,839.00 | $3,230.00 | $3,375.00 |
| 1090 | Itsfm location documentation- intersection (0611-2-1) | EACH | 12 | $2,400.00 | $1,754.37 | $1,839.00 | $2,580.00 | $2,693.25 |
| 1095 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,010 | $16.00 | $22.20 | $23.20 | $17.30 | $22.09 |
| 1100 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 5,204 | $25.00 | $36.28 | $38.00 | $25.60 | $28.06 |
| 1105 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 505 | $40.00 | $48.19 | $50.50 | $42.30 | $44.13 |
| 1110 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 13 | $10,200 | $13,104 | $13,730 | $10,900 | $11,326 |
| 1115 | Signal cable, adjust (0632-7-4) | PI | 2 | $750.00 | $1,791.19 | $1,875.00 | $776.50 | $810.00 |
| 1120 | Signal cable, remove- intersection (0632-7-6) | PI | 10 | $3,500.00 | $1,602.76 | $1,680.00 | $3,620.00 | $3,780.00 |
| 1125 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 307 | $3.50 | $3.79 | $3.95 | $3.60 | $5.00 |
| 1130 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 1,665 | $1.20 | $2.98 | $3.10 | $1.20 | $5.54 |
| 1135 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 205 | $4.00 | $4.87 | $5.10 | $4.00 | $5.81 |
| 1140 | Fiber optic cable, relocate, underground (0633-1420) | LF | 230 | $2.50 | $4.06 | $4.25 | $2.40 | $4.05 |
| 1145 | Fiber optic connection, install, splice (0633-2-31) | EACH | 136 | $55.00 | $75.81 | $79.40 | $55.30 | $60.75 |
| 1150 | Fiber optic connection, install, termination (0633-2-32) | EACH | 72 | $57.00 | $98.55 | $103.20 | $57.10 | $108.00 |
| 1155 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 3 | $1,700.00 | $1,559.44 | $1,634.00 | $1,750.00 | $1,599.75 |
| 1160 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 12 | $92.00 | $70.93 | $75.00 | $93.60 | $67.50 |
| 1165 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 8 | $61.00 | $62.81 | $66.00 | $61.20 | $48.60 |
| 1170 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 7 | $105.00 | $105.05 | $110.00 | $106.80 | $114.75 |
| 1175 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 12 | $2,000.00 | $1,884.32 | $1,975.00 | $2,140.00 | $2,463.75 |
| 1180 | Fiber optic cable locator (0633-6) | DA | 1,040 | $215.00 | $214.42 | $224.70 | $232.90 | $391.50 |
| 1185 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 285 | $7.00 | $3.52 | $3.69 | $7.10 | $7.43 |
| 1190 | Span wire assembly, F&I, two point, perpendicular (0634-4151) | PI | 1 | $6,400.00 | $4,006.89 | $4,200.00 | $6,410.00 | $6,684.91 |
| 1195 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 4 | $9,400.00 | $9,529.92 | $9,980.00 | $9,480.00 | $9,888.69 |
| 1200 | Span wire assembly, F&I, two point, other type (0634-4154) | PI | 1 | $6,300.00 | $9,529.92 | $9,980.00 | $6,410.00 | $6,684.91 |
| 1205 | Span wire assembly, remove- poles remain (0634-4600) | PI | 5 | $1,900.00 | $2,566.58 | $2,690.00 | $1,940.00 | $2,025.00 |
| 1210 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 190 | $1,400.00 | $1,256.22 | $1,316.00 | $1,470.00 | $1,939.19 |
| 1215 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 10 | $3,000.00 | $3,474.09 | $3,640.00 | $3,040.00 | $3,173.10 |
| 1220 | Pull & splice box, install (0635-2-30) | EACH | 5 | $1,100.00 | $909.67 | $950.00 | $1,160.00 | $1,215.00 |
| 1225 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 5 | $4,800.00 | $7,326.12 | $7,670.00 | $4,940.00 | $5,155.65 |
| 1230 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 4 | $4,200.00 | $6,643.87 | $6,960.00 | $4,290.00 | $4,471.20 |
| 1235 | Electrical power service, remove overhead (0639-1610) | AS | 5 | $1,000.00 | $1,380.75 | $1,445.00 | $1,040.00 | $1,080.00 |
| 1240 | Electrical service wire, & install (0639-2-1) | LF | 734 | $6.75 | $8.39 | $8.80 | $6.95 | $7.27 |
| 1245 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,700.00 | $2,777.75 | $2,900.00 | $2,750.00 | $2,866.73 |
| 1250 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 4 | $2,400.00 | $2,328.33 | $2,440.00 | $2,440.00 | $2,547.49 |
| 1255 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,200.00 | $2,328.33 | $2,440.00 | $2,290.00 | $2,388.59 |
| 1260 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $515.00 | $433.18 | $450.00 | $517.50 | $540.00 |
| 1265 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 8 | $13,000 | $12,670 | $13,280 | $14,000 | $14,648 |
| 1270 | Aluminum signals pole, (0646-1-11) | EACH | 82 | $2,600.00 | $2,734.44 | $2,866.00 | $2,670.00 | $4,117.06 |
| 1275 | Aluminum signals pole, (0646-1-40) | EACH | 1 | $1,200.00 | $2,230.87 | $2,335.00 | $1,290.00 | $2,160.00 |
| 1280 | Aluminum signals pole, remove (0646-1-60) | EACH | 19 | $510.00 | $319.47 | $334.00 | $517.50 | $540.00 |
| 1285 | Steel mast arm assembly, and install, single arm 30' (0649-21-1) | EACH | 1 | $54,000 | $59,562 | $62,000 | $57,800 | $64,612 |
| 1290 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 3 | $57,500 | $60,645 | $63,500 | $61,300 | $68,286 |
| 1295 | Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5) | EACH | 1 | $79,000 | $82,304 | $86,200 | $84,700 | $92,679 |
| 1300 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 5 | $62,000 | $71,041 | $74,400 | $67,100 | $74,323 |
| 1305 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 78 | $2,900.00 | $2,111.74 | $2,210.00 | $3,020.00 | $3,146.69 |
| 1310 | Vehicular traffic signal, furnish & install aluminum, 3 section, 2-4 ways (0650-1-15) | AS | 2 | $6,000.00 | $2,664.05 | $2,790.00 | $6,160.00 | $6,428.38 |
| 1315 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 4 | $3,000.00 | $2,339.16 | $2,450.00 | $3,050.00 | $3,179.66 |
| 1320 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 5 | $4,200.00 | $3,292.15 | $3,450.00 | $4,260.00 | $4,443.99 |
| 1325 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 3 | $2,300.00 | $1,819.35 | $1,909.00 | $2,300.00 | $2,400.14 |
| 1330 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 15 | $300.00 | $211.17 | $221.00 | $323.50 | $337.50 |
| 1335 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 46 | $1,300.00 | $952.99 | $999.00 | $1,360.00 | $1,423.92 |
| 1340 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 4 | $2,200.00 | $1,981.79 | $2,077.00 | $2,280.00 | $2,377.17 |
| 1345 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 8 | $250.00 | $108.29 | $113.50 | $258.80 | $270.00 |
| 1350 | Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10) | AS | 6 | $2,400.00 | $2,073.84 | $2,174.00 | $2,520.00 | $2,633.89 |
| 1355 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 8 | $310.00 | $351.96 | $369.00 | $319.50 | $333.29 |
| 1360 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 3 | $380.00 | $400.69 | $420.00 | $386.00 | $402.62 |
| 1365 | Loop assembly, F&I, type B (0660-2102) | AS | 10 | $1,600.00 | $1,380.76 | $1,445.00 | $1,630.00 | $1,701.68 |
| 1370 | Loop assembly, F&I, type F (0660-2106) | AS | 10 | $2,500.00 | $1,288.70 | $1,350.00 | $2,580.00 | $2,690.67 |
| 1375 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 4 | $18,500 | $19,699 | $20,640 | $19,400 | $20,219 |
| 1380 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 16 | $12,000 | $23,191 | $24,300 | $12,900 | $13,427 |
| 1385 | Vehicle detection system - microwave, remove, complete system (0660-3-60) | EACH | 1 | $2,300.00 | $2,144.23 | $2,240.00 | $2,590.00 | $2,700.00 |
| 1390 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 4 | $19,500 | $22,060 | $23,100 | $21,600 | $22,543 |
| 1395 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 13 | $9,200.00 | $6,015.76 | $6,300.00 | $10,200 | $10,627 |
| 1400 | Vehicle detection system- remove (0660-4-60) | EACH | 4 | $2,400.00 | $3,216.35 | $3,370.00 | $2,590.00 | $2,700.00 |
| 1405 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 4 | $9,800.00 | $9,551.57 | $10,000 | $10,800 | $11,255 |
| 1410 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 6 | $3,000.00 | $3,438.35 | $3,600.00 | $3,250.00 | $3,394.12 |
| 1415 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 5 | $9,400.00 | $9,459.52 | $9,915.00 | $9,920.00 | $10,343 |
| 1420 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 5 | $8,500.00 | $5,685.46 | $5,960.00 | $8,850.00 | $9,229.63 |
| 1425 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 59 | $600.00 | $281.57 | $295.00 | $623.50 | $650.57 |
| 1430 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 6 | $63.50 | $162.44 | $170.00 | $64.70 | $67.50 |
| 1435 | Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111) | AS | 7 | $47,000 | $46,626 | $48,900 | $50,600 | $52,740 |
| 1440 | Traffic controller assembly, F&I, NEMA, 2 preemption (0670-5112) | AS | 3 | $47,500 | $49,929 | $52,300 | $50,600 | $52,740 |
| 1445 | Traffic controller assembly, remove controller with (0670-5600) | AS | 9 | $1,650.00 | $1,110.02 | $1,160.00 | $1,810.00 | $1,890.00 |
| 1450 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 2 | $2,900.00 | $1,559.44 | $1,360.00 | $3,110.00 | $3,240.00 |
| 1455 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 2 | $8,000.00 | $8,663.56 | $9,080.00 | $8,440.00 | $9,078.75 |
| 1460 | ITS CCTV camera, F&I, external positioner PTZ- IP, high definition (0682-1143) | EACH | 2 | $18,000 | $10,071 | $10,500 | $19,200 | $20,041 |
| 1465 | ITS CCTV camera, relocate (0682-1400) | EACH | 2 | $1,800.00 | $3,032.25 | $3,180.00 | $1,940.00 | $2,025.00 |
| 1470 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 11 | $6,300.00 | $5,577.17 | $5,840.00 | $6,790.00 | $4,718.25 |
| 1475 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 4 | $11,100 | $13,537 | $14,000 | $12,000 | $12,542 |
| 1480 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 9 | $1,350.00 | $2,382.48 | $2,490.00 | $1,500.00 | $1,568.60 |
| 1485 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 7 | $400.00 | $146.20 | $153.00 | $448.50 | $467.90 |
| 1490 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 9 | $800.00 | $833.87 | $873.00 | $898.00 | $936.72 |
| 1495 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 2 | $1,000.00 | $1,082.95 | $1,135.00 | $1,140.00 | $1,185.17 |
| 1500 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 7 | $150.00 | $59.56 | $60.00 | $129.40 | $135.00 |
| 1505 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 19 | $8,100.00 | $8,122.09 | $8,500.00 | $8,610.00 | $9,319.73 |
| 1510 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 9 | $8,000.00 | $4,548.37 | $4,760.00 | $8,890.00 | $9,608.63 |
| 1515 | Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360) | EACH | 3 | $7,000.00 | $7,039.14 | $7,370.00 | $7,120.00 | $7,768.85 |
| 1520 | Landscape complete- small plants (0580-1-1) | LS | 1 | $3,500.00 | $3,401.38 | $3,500.00 | $3,680.00 | $3,750.00 |
| 1525 | Landscape complete- large plants (0580-1-2) | LS | 1 | $225,000 | $242,940 | $250,000 | $263,000 | $245,520 |
| 1530 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 1535 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $118,847 | $118,847 | $118,847 | $118,847 | $118,847 |
| 1540 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 2,478 | $40.00 | $55.03 | $28.20 | $22.00 | $31.50 |
| 1545 | Utility pipe,plug & place out of service, 8-19.9" (1050-18004) | LF | 158 | $55.00 | $55.62 | $20.00 | $19.00 | $115.00 |
| 1550 | Utility pipe, temporary, PVC, casing/conduit, 20-49.9" (1050-19215) | LF | 145 | $325.00 | $342.20 | $310.00 | $440.00 | $595.00 |
| 1555 | Utility pipe- polyethylene, furnish & install, water/sewer, (1050-41201) | LF | 15 | $38.00 | $64.45 | $168.00 | $172.50 | $85.00 |
| 1560 | Utility pipe- polyethylene, furnish & install, water/sewer, (1050-41202) | LF | 90 | $48.00 | $57.28 | $103.00 | $72.50 | $105.25 |
| 1565 | Utility pipe- high density polyethylene, furnish & install, water/sewer, 20" (1050-42220) | LF | 537 | $415.00 | $713.77 | $290.00 | $451.50 | $285.79 |
| 1570 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 8" (1050-51208) | LF | 45 | $315.00 | $151.32 | $260.00 | $394.50 | $129.38 |
| 1575 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 12" (1050-51212) | LF | 76 | $275.00 | $236.78 | $350.00 | $629.50 | $151.32 |
| 1580 | Utility pipe- ductile iron/cast iron, furnish & install, water/sewer, 16" (1050-51216) | LF | 1,144 | $330.00 | $286.76 | $241.00 | $295.00 | $196.86 |
| 1585 | Utility fittings, ductile iron, furnish & install elbow, 8" (1055-51108) | EACH | 4 | $1,030.00 | $2,209.07 | $1,300.00 | $813.50 | $1,220.00 |
| 1590 | Utility fittings, ductile iron, furnish & install elbow, (1055-51112) | EACH | 5 | $1,600.00 | $3,323.23 | $1,970.00 | $1,570.00 | $1,812.00 |
| 1595 | Utility fittings, ductile iron, furnish & install elbow, (1055-51116) | EACH | 20 | $2,900.00 | $2,811.90 | $2,980.00 | $2,980.00 | $2,473.00 |
| 1600 | Utility fittings, ductile iron, furnish & install tee, 16" (1055-51216) | EACH | 1 | $5,025.00 | $3,866.92 | $3,800.00 | $3,720.00 | $3,368.00 |
| 1605 | Utility fittings, ductile iron, furnish & install reducer, 16" (1055-51316) | EACH | 1 | $3,230.00 | $3,009.56 | $2,415.00 | $2,390.00 | $2,442.00 |
| 1610 | Utility fittings, ductile iron, furnish & install reducer, 20" (1055-51320) | EACH | 2 | $3,750.00 | $4,302.08 | $3,020.00 | $3,090.00 | $3,906.00 |
| 1615 | Utility fittings, ductile iron, furnish & install union, 8" (1055-51408) | EACH | 1 | $3,150.00 | $1,878.98 | $3,500.00 | $808.00 | $1,220.00 |
| 1620 | Utility fittings, ductile iron, furnish & install, 10" (1055-51510) | EACH | 7 | $2,500.00 | $1,275.45 | $1,175.00 | $761.00 | $1,100.00 |
| 1625 | Utility fittings, ductile iron, furnish & install, 12" (1055-51512) | EACH | 1 | $1,100.00 | $1,412.37 | $7,060.00 | $845.00 | $1,200.00 |
| 1630 | Utility fittings, ductile iron, furnish & install, 16" (1055-51516) | EACH | 7 | $2,500.00 | $2,574.85 | $10,530 | $2,160.00 | $2,280.00 |
| 1635 | Utility fixture, valve/meter box, furnish & install, 6" (1080-21106) | EACH | 2 | $580.00 | $1,966.19 | $1,330.00 | $863.00 | $1,290.00 |
| 1640 | Utility fixture, valve/meter box, furnish & install, 8" (1080-21108) | EACH | 6 | $1,100.00 | $1,983.50 | $1,330.00 | $863.00 | $1,290.00 |
| 1645 | Utility fixture, valve/meter box, furnish & install, 16" (1080-21116) | EACH | 12 | $1,100.00 | $1,169.57 | $1,330.00 | $1,080.00 | $1,690.00 |
| 1650 | Utility fixture, valve/meter box, furnish & install, 20" (1080-21120) | EACH | 14 | $1,100.00 | $1,286.85 | $1,330.00 | $1,270.00 | $1,837.00 |
| 1655 | Utility fixture, valve/meter box, furnish & install, 30" (1080-21130) | EACH | 1 | $1,100.00 | $1,332.51 | $1,330.00 | $1,370.00 | $1,937.00 |
| 1660 | Utility fixture, valve/meter box, adjust (1080-21500) | EACH | 8 | $425.00 | $1,160.21 | $650.00 | $766.50 | $1,500.00 |
| 1665 | Utility fixture, valve/meter box, remove (1080-21600) | EACH | 44 | $580.00 | $466.59 | $250.00 | $492.50 | $450.00 |
| 1670 | Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112) | EACH | 1 | $22,500 | $14,181 | $12,400 | $22,000 | $18,490 |
| 1675 | Utility fixture- tapping saddle/sleeve, furnish & 16" (1080-23116) | EACH | 7 | $29,800 | $34,887 | $21,800 | $28,300 | $21,574 |
| 1680 | Utility fixture, valve assembly, furnish and install, 8" (1080-24108) | EACH | 1 | $3,300.00 | $5,153.21 | $4,425.00 | $29,800 | $5,327.00 |
| 1685 | Utility fixture, valve assembly, furnish and install, 12" (1080-24112) | EACH | 1 | $5,600.00 | $12,383 | $10,000 | $60,400 | $7,765.00 |
| 1690 | Utility fixture, valve assembly, furnish and install, 16" (1080-24116) | EACH | 7 | $8,400.00 | $14,046 | $12,220 | $14,500 | $14,900 |
| 1695 | Utility fixture, vac/air furnish and install, 16" (1080-26116) | EACH | 1 | $17,800 | $18,107 | $10,000 | $16,000 | $19,100 |
| 1700 | Utility fixture- line stop assembly, furnish and install, (1080-27112) | EACH | 1 | $30,900 | $44,069 | $19,500 | $22,400 | $39,675 |
| 1705 | Utility fixture- line stop assembly, furnish and install, (1080-27116) | EACH | 6 | $38,500 | $47,163 | $25,940 | $30,000 | $47,598 |
| 1710 | Utility fixture, plug valve, furnish and install 16" (1080-33116) | EACH | 4 | $8,500.00 | $29,547 | $18,790 | $21,900 | $23,499 |
| 1715 | Fire hydrant, F&I, standard, 2 hose, 1PUMPER, 6" (1644-113-08) | EACH | 8 | $11,600 | $12,362 | $11,950 | $14,700 | $7,259.00 |
| 1720 | Fire hydrant, salvage & store (1644-400) | EACH | 10 | $3,100.00 | $5,514.78 | $1,160.00 | $1,430.00 | $800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 11, 2025. Compiled by Mirage Metrics.