FDOT contract T3950 bid tabulation
SR 85 (N FERDON BLVD) AT JONES RD. Let by Florida DOT on June 11, 2025, Okaloosa, District 3. 3 bids received; low bid $998,662 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 11 JUN 2025
- Pay items
- 24
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $998,662 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $1,221,464 | +22% |
| 3 | Collins Land Services, Inc | $1,384,159 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. C.W. Roberts Contracting, Inc. | 3. Collins Land Services, Inc |
|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $75,000 | $240,000 | $100,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $3,590.82 | $21,000 | $25,000 |
| 0015 | Work zone sign (0102-60) | ED | 720 | $0.63 | $1.35 | $0.50 |
| 0020 | Artificial coverings /rolled erosion control products (0104-1) | SY | 93 | $52.79 | $8.40 | $10.00 |
| 0025 | Sediment barrier (0104-10-3) | LF | 2,897 | $5.40 | $20.00 | $5.00 |
| 0030 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 119 | $26.93 | $70.00 | $10.00 |
| 0035 | Soil tracking prevention device (0104-15) | EACH | 1 | $8,977.04 | $9,200.00 | $10,000 |
| 0040 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $83,023 | $55,000 | $100,000 |
| 0045 | Removal of existing concrete (0110-4-10) | SY | 16 | $208.94 | $95.00 | $50.00 |
| 0050 | Regular excavation (0120-1) | CY | 1,171.10 | $16.50 | $23.00 | $20.00 |
| 0055 | Borrow excavation, truck measure (0120-2-2) | CY | 12,679.80 | $18.14 | $27.00 | $38.50 |
| 0060 | Inlets, ditch bottom, type D, J bot, >10' (0425-1544) | EACH | 1 | $28,451 | $28,000 | $20,000 |
| 0065 | Manholes, J-8, >10' (0425-2-92) | EACH | 1 | $22,341 | $25,000 | $20,000 |
| 0070 | Pipe culvert, optional material, round, 36"SD (0430-174136) | LF | 116 | $229.86 | $330.00 | $500.00 |
| 0075 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 8 | $870.80 | $650.00 | $400.00 |
| 0080 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 232 | $732.76 | $530.00 | $500.00 |
| 0085 | Straight concrete endwalls, single, 0 degrees, round (0430-536100) | EACH | 1 | $12,593 | $11,000 | $10,000 |
| 0090 | Mitered end section, optional round, 48" CD (0430-982141) | EACH | 1 | $15,172 | $8,400.00 | $15,000 |
| 0095 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 20 | $349.09 | $390.00 | $100.00 |
| 0100 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 434.80 | $169.28 | $130.00 | $250.00 |
| 0105 | Bedding stone (0530-74) | TN | 306.20 | $202.62 | $160.00 | $250.00 |
| 0110 | Performance turf, sod (0570-1-2) | SY | 9,260 | $5.84 | $4.35 | $10.00 |
| 0115 | Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11) | SY | 1,910 | $11.67 | $7.85 | $25.00 |
| 0120 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 11, 2025. Compiled by Mirage Metrics.