Collins Land Services, Inc: FDOT bid record
Collins Land Services, Inc submitted 11 bids on Florida DOT contracts in the data, from 27 JUL 2022 to 11 JUN 2025, and was the low bidder on 5 of them (45%). When it was not low, its total sat a median +32% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $8,882,487
- Latest bid
- 11 JUN 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 1 | 100% |
| 2023 | 5 | 2 | 40% |
| 2024 | 1 | 0 | 0% |
| 2025 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 8 | 5 | 63% |
| District 2 | 1 | 0 | 0% |
| District 1 | 1 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sediment barrier | 0104-10-3 | LF | 9 | 7 (78%) | $2.43 | $2.60 |
| Performance turf, sod | 0570-1-2 | SY | 10 | 5 (50%) | $5.00 | $5.00 |
| Work zone sign | 0102-60 | ED | 9 | 5 (56%) | $0.50 | $0.25 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 5 | 3 (60%) | $100.00 | $86.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 8 | 2 (25%) | $0.25 | $0.13 |
| Removal of existing concrete | 0110-4-10 | SY | 6 | 2 (33%) | $50.00 | $33.96 |
| Portable changeable message sign, temporary | 0102-99 | ED | 5 | 2 (40%) | $15.00 | $12.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 5 | 1 (20%) | $30.00 | $5.90 |
| Regular excavation | 0120-1 | CY | 5 | 1 (20%) | $30.00 | $25.47 |
| Borrow excavation, truck measure | 0120-2-2 | CY | 5 | 1 (20%) | $30.00 | $38.80 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H.G. Construction, Development & Investment, Inc. | 3 | 0 of 3 |
| Rogar Management & Consulting of Florida LLC | 3 | 1 of 3 |
| Hale Contracting, Inc. | 2 | 2 of 2 |
| CDM Contracting, Inc. | 2 | 1 of 2 |
| Capital Asphalt Inc | 2 | 0 of 2 |
| Maer Homes, LLC | 2 | 1 of 2 |
| Midwestern Construction, Inc | 1 | 0 of 1 |
| Graybelle Construction | 1 | 1 of 1 |
| David Taylor Construction, Inc. | 1 | 1 of 1 |
| Blacktip Services Incorporated | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 JUN 2025 | T3950 | District 3 | SR 85 (N FERDON BLVD) AT JONES RD | 3 of 3 | $1,384,159 | +39% |
| 30 APR 2025 | T3976 | District 3 | SR 8 (I-10) IN LEON COUNTY AND GADSDEN COUNTY | 1 of 4 | $138,618 | Low, 1.0% under the second |
| 26 MAR 2025 | T5858 | District 5 | SR 528, SR 404, SR 520 AND US 192 AT VARIOUS BRIDGES... | 2 of 5 | $1,711,328 | +80% |
| 26 FEB 2025 | T3853 | District 3 | SR 63 (US 27/MONROE ST) FROM LAKESHORE DR TO JOHN KNOX RD | 1 of 3 | $4,750,238 | Low, 21% under the second |
| 28 FEB 2024 | T1868 | District 1 | SR 64 FROM E OF MANATEE RIVER TO BILL PARRISH RD | 2 of 5 | $1,243,709 | +20% |
| 06 DEC 2023 | T3897 | District 3 | SR 10/SR 12 (US 90) (JEFFERSON ST) FROM CHALK ST TO RALPH... | 5 of 6 | $2,470,378 | +83% |
| 26 JUL 2023 | T2935 | District 2 | SR45 (US 41) AND SR 20, FROM END OF SIDEWALK TO NW 9TH RD... | 5 of 5 | $758,733 | +10% |
| 29 MAR 2023 | T3825 | District 3 | SR 8 (I-10) | 1 of 2 | $1,398,733 | Low, 1.0% under the second |
| 22 FEB 2023 | T3687 | District 3 | CR 274 (BARACK OBAMA BLVD) | 4 of 8 | $1,118,733 | +26% |
| 25 JAN 2023 | T3823 | District 3 | SR 8 (I-10) | 1 of 3 | $2,199,429 | Low, 3.0% under the second |
| 27 JUL 2022 | T3768 | District 3 | SR 8 (I-10) | 1 of 3 | $395,469 | Low, 15% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.