Hale Contracting, Inc.: FDOT bid record
Hale Contracting, Inc. submitted 11 bids on Florida DOT contracts in the data, from 27 FEB 2019 to 25 MAR 2026, and was the low bidder on 3 of them (27%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $2,574,896
- Latest bid
- 25 MAR 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 2 | 1 | 50% |
| 2020 | 1 | 0 | 0% |
| 2021 | 1 | 1 | 100% |
| 2022 | 1 | 0 | 0% |
| 2023 | 5 | 1 | 20% |
| 2026 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Raised pavement marker, type B | 0706-1-3 | EACH | 11 | 6 (55%) | $4.60 | $5.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 10 | 6 (60%) | $15.00 | $12.00 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 10 | 6 (60%) | $7.38 | $6.09 |
| Valve boxes, adjust | 0425-6 | EACH | 8 | 6 (75%) | $850.00 | $780.00 |
| Work zone sign | 0102-60 | ED | 11 | 5 (45%) | $0.37 | $0.25 |
| Detectable warnings | 0527-2 | SF | 11 | 5 (45%) | $30.00 | $35.00 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 11 | 5 (45%) | $75.00 | $65.00 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 10 | 5 (50%) | $84.50 | $86.00 |
| Pipe handrail - guiderail, aluminum | 0515-1-2 | LF | 8 | 5 (63%) | $88.50 | $75.00 |
| Mailbox, F&I single | 0110-7-1 | EACH | 7 | 5 (71%) | $150.00 | $250.00 |
| Removal of existing concrete | 0110-4-10 | SY | 11 | 4 (36%) | $30.00 | $33.96 |
| Thermoplastic, standard, solid, 12" for crosswalk and roundabout | 0711-11123 | LF | 11 | 4 (36%) | $5.25 | $3.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| C.W. Roberts Contracting, Inc. | 6 | 1 of 6 |
| Capital Asphalt Inc | 6 | 0 of 6 |
| Peavy & Son Construction Co., Inc. | 4 | 3 of 4 |
| M of Tallahassee, Inc. | 3 | 2 of 3 |
| Pyramid Excavation, Inc | 2 | 1 of 2 |
| CDM Contracting, Inc. | 2 | 0 of 2 |
| Anderson Columbia Co., Inc. | 2 | 1 of 2 |
| Collins Land Services, Inc | 2 | 0 of 2 |
| North Florida Construction, Inc. | 1 | 0 of 1 |
| Pigott Asphalt and Sitework LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 MAR 2026 | T3A02 | District 3 | SR 10 (US 90) AT DOVER RD | 3 of 7 | $4,677,778 | +2.0% |
| 06 DEC 2023 | T3866 | District 3 | SR 261 (US 319/CAPITAL CIRCLE), FROM SR 363 (WOODVILLE HWY) | 2 of 5 | $7,744,865 | +10% |
| 06 DEC 2023 | T3897 | District 3 | SR 10/SR 12 (US 90) (JEFFERSON ST) FROM CHALK ST TO RALPH... | 3 of 6 | $1,624,778 | +20% |
| 15 NOV 2023 | T3872 | District 3 | SR 30 (US 98) FROM W OF WAKULLA RIVER BRIDGE TO SR 267 ... | 2 of 4 | $8,593,736 | +8.0% |
| 27 SEP 2023 | T3873 | District 3 | SR 261 (US 319) (CAPITAL CIRCLE) FROM SR 20 (US 27) (APAL.. | 3 of 4 | $5,172,211 | +20% |
| 22 FEB 2023 | T3687 | District 3 | CR 274 (BARACK OBAMA BLVD) | 1 of 8 | $889,778 | Low, 10% under the second |
| 23 FEB 2022 | T3789 | District 3 | SR 77 | 3 of 3 | $608,502 | +59% |
| 27 OCT 2021 | T3795 | District 3 | SIDEWALK | 1 of 3 | $631,777 | Low, 4.0% under the second |
| 10 JUN 2020 | T3763 | District 3 | CR 268 (HIGH BRIDGE RD) | 3 of 5 | $5,392,778 | +10% |
| 27 MAR 2019 | T3713 | District 3 | CR 12 AND CHESTER ST | 1 of 3 | $1,053,341 | Low, 24% under the second |
| 27 FEB 2019 | T3688 | District 3 | SR 63 (US 27) | 2 of 4 | $367,777 | +4.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.