FDOT contract T3A02 bid tabulation
SR 10 (US 90) AT DOVER RD. Let by Florida DOT on March 25, 2026, Gadsden, District 3. 7 bids received; low bid $4,581,846 by North Florida Asphalt, Inc..
- Owner
- Florida DOT
- Letting
- 25 MAR 2026
- Pay items
- 132
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | North Florida Asphalt, Inc. | $4,581,846 | Low |
| 2 | Anderson Columbia Co., Inc. | $4,646,842 | +1.0% |
| 3 | Hale Contracting, Inc. | $4,677,778 | +2.0% |
| 4 | Sandco LLC | $4,861,249 | +6.0% |
| 5 | C.W. Roberts Contracting, Inc. | $5,008,975 | +9.0% |
| 6 | Capital Asphalt Inc | $5,334,861 | +16% |
| 7 | M of Tallahassee, Inc. | $5,575,254 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. North Florida Asphalt, Inc. | 2. Anderson Columbia Co., Inc. | 3. Hale Contracting, Inc. | 4. Sandco LLC | 5. C.W. Roberts Contracting, Inc. | 6. Capital Asphalt Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $256,230 | $367,063 | $177,461 | $369,300 | $450,000 | $535,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $491,775 | $110,655 | $150,000 | $200,660 | $250,000 | $275,000 |
| 0015 | Work zone sign (0102-60) | ED | 16,513 | $0.36 | $0.36 | $0.33 | $0.38 | $0.35 | $0.50 |
| 0020 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,029 | $66.00 | $61.27 | $60.50 | $68.75 | $15.00 | $60.00 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 11,398 | $0.12 | $0.12 | $0.11 | $0.13 | $0.11 | $1.00 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 130 | $6.00 | $5.94 | $5.50 | $6.25 | $5.50 | $6.00 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 1,636 | $18.00 | $17.82 | $16.50 | $18.75 | $16.50 | $17.00 |
| 0040 | Type III barricade (0102-115) | ED | 4,720 | $0.42 | $0.42 | $1.20 | $6.50 | $0.40 | $6.00 |
| 0045 | Sediment barrier (0104-10-3) | LF | 5,232 | $3.18 | $3.56 | $3.50 | $6.00 | $6.35 | $4.25 |
| 0050 | Floating turbidity barrier (0104-11) | LF | 93 | $15.82 | $23.77 | $50.00 | $21.25 | $27.00 | $57.00 |
| 0055 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 988 | $9.12 | $23.77 | $12.00 | $8.25 | $13.00 | $34.00 |
| 0060 | Soil tracking prevention device (0104-15) | EACH | 1 | $4,500.00 | $594.18 | $5,000.00 | $3,500.00 | $7,500.00 | $11,500 |
| 0065 | Inlet protection system (0104-18) | EACH | 2 | $250.00 | $445.63 | $250.00 | $350.00 | $175.00 | $475.00 |
| 0070 | Litter removal (0107-1) | ACRE | 153.26 | $33.00 | $65.36 | $120.00 | $184.75 | $120.00 | $40.00 |
| 0075 | Mowing (0107-2) | ACRE | 153.10 | $42.00 | $65.36 | $120.00 | $245.00 | $120.00 | $50.00 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $115,000 | $214,107 | $150,000 | $409,740 | $425,000 | $100,000 |
| 0085 | Removal of existing concrete (0110-4-10) | SY | 791 | $10.00 | $66.59 | $50.00 | $15.00 | $30.00 | $31.00 |
| 0090 | Regular excavation (0120-1) | CY | 8,664.20 | $12.00 | $11.21 | $18.00 | $6.25 | $11.30 | $23.00 |
| 0095 | Subsoil excavation (0120-4) | CY | 1,267 | $24.00 | $14.96 | $20.00 | $21.50 | $16.00 | $38.00 |
| 0100 | Embankment (0120-6) | CY | 29,790.20 | $12.00 | $17.22 | $20.00 | $18.00 | $26.50 | $26.00 |
| 0105 | Natural clay borrow for clay core (0120-76-2) | CY | 665 | $24.00 | $21.76 | $25.00 | $20.00 | $33.00 | $40.00 |
| 0110 | Settlement plate assembly (0141-70) | AS | 9 | $1,200.00 | $1,725.40 | $1,750.00 | $2,770.00 | $1,900.00 | $2,600.00 |
| 0115 | Geosynthetic reinforced foundation over soft soil (0145-2) | SY | 5,119 | $12.00 | $8.60 | $10.00 | $6.75 | $4.75 | $13.50 |
| 0120 | Type B stabilization (0160-4) | SY | 10,069 | $6.00 | $8.94 | $20.00 | $5.00 | $5.85 | $12.50 |
| 0125 | Optional base, base group 01 (0285-701) | SY | 1,635 | $16.79 | $25.65 | $18.00 | $18.75 | $17.00 | $26.00 |
| 0130 | Optional base, base group 02 (0285-702) | SY | 249 | $42.64 | $37.52 | $45.00 | $25.00 | $22.00 | $40.00 |
| 0135 | Optional base, base group 06 (0285-706) | SY | 6,329 | $21.23 | $23.78 | $27.00 | $27.00 | $25.00 | $25.00 |
| 0140 | Optional base, base group 11 (0285-711) | SY | 350 | $28.51 | $54.29 | $100.00 | $34.25 | $63.00 | $43.00 |
| 0145 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 11,599 | $4.50 | $1.27 | $2.48 | $2.80 | $2.20 | $5.00 |
| 0150 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 3,347 | $4.50 | $2.20 | $3.85 | $5.00 | $3.35 | $7.00 |
| 0155 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 835.90 | $165.00 | $149.52 | $170.50 | $225.00 | $175.00 | $175.00 |
| 0160 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 635.40 | $175.00 | $207.00 | $236.50 | $300.00 | $230.00 | $275.00 |
| 0165 | Asphalt concrete friction course,traffic B, FC-9.5, PG 76-22 (0337-7-80) | TN | 739.80 | $165.00 | $155.44 | $176.00 | $231.25 | $180.00 | $175.00 |
| 0170 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 3 | $8,209.00 | $10,450 | $7,050.00 | $9,012.50 | $6,700.00 | $10,375 |
| 0175 | Inlets, curb, type 7, <10' (0425-1471) | EACH | 2 | $9,032.00 | $14,965 | $8,900.00 | $10,723 | $7,800.00 | $11,400 |
| 0180 | Inlets, curb, type 7, >10' (0425-1472) | EACH | 1 | $11,788 | $16,984 | $17,500 | $11,928 | $12,000 | $18,350 |
| 0185 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 1 | $11,774 | $17,894 | $19,926 | $11,670 | $11,000 | $12,400 |
| 0190 | Inlets, DT bot, type E, <10' (0425-1551) | EACH | 5 | $7,373.00 | $10,913 | $9,000.00 | $7,256.25 | $6,600.00 | $6,900.00 |
| 0195 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $6,545.00 | $8,321.16 | $8,500.00 | $7,070.00 | $7,000.00 | $8,750.00 |
| 0200 | Manholes, P-8, <10' (0425-2-61) | EACH | 2 | $8,200.00 | $9,523.27 | $7,000.00 | $8,240.00 | $8,600.00 | $10,300 |
| 0205 | Manholes, P-8, >10' (0425-2-62) | EACH | 1 | $14,000 | $15,619 | $12,500 | $10,600 | $9,800.00 | $14,400 |
| 0210 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $11,000 | $11,138 | $13,000 | $9,811.25 | $7,600.00 | $17,500 |
| 0215 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 64 | $199.00 | $206.53 | $250.00 | $147.60 | $140.00 | $225.00 |
| 0220 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 249 | $273.00 | $96.02 | $105.00 | $76.70 | $105.00 | $130.00 |
| 0225 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 510 | $131.00 | $72.72 | $135.00 | $86.23 | $115.00 | $130.00 |
| 0230 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 658 | $132.00 | $131.74 | $168.00 | $112.00 | $140.00 | $170.00 |
| 0235 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 175 | $241.00 | $135.58 | $295.00 | $203.50 | $235.00 | $260.00 |
| 0240 | Straight concrete endwalls, single, 0 degrees, round (0430-518100) | EACH | 2 | $4,043.00 | $5,129.50 | $15,000 | $3,133.75 | $3,700.00 | $4,940.00 |
| 0245 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 1 | $6,834.00 | $6,262.95 | $10,000 | $3,942.50 | $4,400.00 | $6,100.00 |
| 0250 | Straight concrete endwalls, single, 30 degrees, round (0430-536120) | EACH | 1 | $10,500 | $12,115 | $8,000.00 | $6,865.00 | $6,700.00 | $17,150 |
| 0255 | Straight concrete endwalls, single, 45 degrees, round (0430-536130) | EACH | 1 | $10,500 | $12,115 | $17,500 | $6,865.00 | $6,700.00 | $17,150 |
| 0260 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 3 | $3,375.00 | $3,235.56 | $5,000.00 | $2,651.25 | $2,000.00 | $3,900.00 |
| 0265 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 1 | $4,500.00 | $3,999.82 | $6,000.00 | $3,276.00 | $2,300.00 | $4,300.00 |
| 0270 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $4,214.00 | $3,464.24 | $5,000.00 | $2,990.00 | $2,100.00 | $4,300.00 |
| 0275 | Vertical drainage wicks (0442-70) | LF | 223,994 | $3.14 | $2.78 | $2.75 | $2.50 | $2.95 | $1.75 |
| 0280 | Concrete curb & gutter, type E (0520-1-7) | LF | 1,413 | $45.00 | $53.47 | $42.00 | $48.00 | $30.00 | $40.00 |
| 0285 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 130 | $106.00 | $136.67 | $120.00 | $108.00 | $77.00 | $170.00 |
| 0290 | Concrete traffic separator, special- variable width (0520-70) | SY | 163 | $164.00 | $188.95 | $170.00 | $150.00 | $160.00 | $165.00 |
| 0295 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 81 | $75.00 | $104.58 | $76.00 | $108.00 | $85.00 | $130.00 |
| 0300 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 18 | $350.00 | $213.91 | $150.00 | $180.00 | $135.00 | $670.00 |
| 0305 | Detectable warnings (0527-2) | SF | 79 | $42.00 | $41.59 | $50.00 | $38.00 | $35.00 | $40.00 |
| 0310 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 40.30 | $118.00 | $181.14 | $300.00 | $150.00 | $125.00 | $385.00 |
| 0315 | Bedding stone (0530-74) | TN | 29 | $131.00 | $220.57 | $300.00 | $130.00 | $110.00 | $390.00 |
| 0320 | Performance turf (0570-1-1) | SY | 25,834 | $2.20 | $1.47 | $3.00 | $1.56 | $1.50 | $3.75 |
| 0325 | Performance turf, sod (0570-1-2) | SY | 3,092 | $6.00 | $3.97 | $4.50 | $7.00 | $3.25 | $1.25 |
| 0330 | Raised pavement marker, type B (0706-1-3) | EACH | 1,627 | $6.00 | $5.94 | $5.50 | $6.25 | $5.50 | $5.50 |
| 0335 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.67 | $1,800.00 | $1,782.53 | $6.50 | $1,875.00 | $1,640.00 | $1,485.00 |
| 0340 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.75 | $1,020.00 | $1,010.10 | $935.00 | $1,062.50 | $935.00 | $770.00 |
| 0345 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.60 | $1,800.00 | $1,782.53 | $1,650.00 | $1,875.00 | $1,640.00 | $1,485.00 |
| 0350 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $54,103 | $54,103 | $54,103 | $54,103 | $54,103 | $54,103 |
| 0355 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 42 | $708.00 | $552.59 | $649.00 | $737.50 | $500.00 | $511.00 |
| 0360 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 5 | $2,310.00 | $2,257.86 | $2,117.50 | $2,406.25 | $2,000.00 | $2,090.00 |
| 0365 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $778.00 | $166.37 | $71.50 | $81.25 | $150.00 | $154.00 |
| 0370 | Single column ground sign assembly, remove (0700-1600) | EACH | 28 | $48.00 | $59.42 | $44.00 | $50.00 | $55.00 | $55.00 |
| 0375 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 1 | $4,200.00 | $2,198.45 | $38.50 | $4,375.00 | $2,000.00 | $2,035.00 |
| 0380 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 8 | $60.00 | $65.36 | $55.00 | $62.50 | $60.00 | $60.00 |
| 0385 | Enhanced highway sign solar powered, F&I ground mount, W/eds and beacon, UP to 12 SF of static sign panels (0700-142171) | EACH | 1 | $18,600 | $13,072 | $17,050 | $19,375 | $12,000 | $12,100 |
| 0390 | Tubular marker, 36" yellow (0704-1-4) | EACH | 7 | $240.00 | $178.26 | $1,540.00 | $250.00 | $165.00 | $165.00 |
| 0395 | Object marker, type 3 (0705-10-3) | EACH | 3 | $360.00 | $356.50 | $330.00 | $375.00 | $325.00 | $330.00 |
| 0400 | Raised pavement marker, type B (0706-1-3) | EACH | 555 | $6.00 | $5.94 | $5.50 | $6.25 | $5.50 | $5.50 |
| 0405 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 156 | $3.90 | $3.86 | $3.58 | $4.10 | $3.50 | $11.00 |
| 0410 | Painted pavement markings, surface (0710-90) | LS | 1 | $13,800 | $13,666 | $12,650 | $14,375 | $12,500 | $2,746.00 |
| 0415 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 419 | $5.58 | $5.52 | $5.12 | $5.82 | $5.00 | $5.50 |
| 0420 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 348 | $7.02 | $6.95 | $6.45 | $7.32 | $6.25 | $8.00 |
| 0425 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 157 | $7.62 | $7.54 | $7.00 | $7.94 | $7.00 | $10.00 |
| 0430 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.17 | $4,590.00 | $4,545.44 | $4,207.50 | $4,781.25 | $4,200.00 | $4,675.00 |
| 0435 | Thermoplastic, standard, arrow (0711-11170) | EACH | 21 | $98.40 | $97.45 | $90.20 | $102.50 | $90.00 | $100.00 |
| 0440 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 339 | $7.02 | $6.95 | $6.45 | $7.32 | $6.40 | $8.00 |
| 0445 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.08 | $4,350.08 | $4,307.77 | $3,987.50 | $4,531.25 | $4,000.00 | $2,750.00 |
| 0450 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 338 | $14.40 | $14.26 | $13.20 | $15.00 | $13.00 | $22.00 |
| 0455 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 4 | $180.00 | $178.26 | $165.00 | $187.50 | $165.00 | $165.00 |
| 0460 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 4 | $110.40 | $109.33 | $101.20 | $115.00 | $100.00 | $165.00 |
| 0465 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.94 | $8,039.23 | $7,961.95 | $7,370.00 | $8,375.00 | $7,300.00 | $6,875.00 |
| 0470 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 0.63 | $3,000.00 | $2,970.87 | $2,750.00 | $3,125.00 | $2,700.00 | $4,675.00 |
| 0475 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.55 | $7,980.00 | $7,902.52 | $7,315.00 | $8,312.50 | $7,300.00 | $6,875.00 |
| 0480 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.80 | $6,360.00 | $6,298.26 | $5,830.00 | $6,625.00 | $5,700.00 | $6,325.00 |
| 0485 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.71 | $6,255.63 | $6,238.83 | $5,775.00 | $6,562.50 | $5,700.00 | $6,325.00 |
| 0490 | Conduit, furnish & install, open trench (0630-2-11) | LF | 321 | $20.45 | $17.82 | $18.70 | $21.25 | $18.00 | $16.50 |
| 0495 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,440.00 | $1,544.85 | $1,320.00 | $1,500.00 | $1,300.00 | $1,430.00 |
| 0500 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $2,400.00 | $2,970.87 | $2,200.00 | $2,500.00 | $2,100.00 | $2,750.00 |
| 0505 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 1 | $2,400.00 | $2,376.71 | $2,420.00 | $2,750.00 | $2,400.00 | $2,200.00 |
| 0510 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,049 | $3.60 | $6.24 | $3.30 | $3.75 | $3.30 | $6.00 |
| 0515 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $20,400 | $26,144 | $18,700 | $21,250 | $18,500 | $24,200 |
| 0520 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 6 | $14,400 | $17,825 | $11,770 | $13,438 | $11,700 | $16,500 |
| 0525 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 6 | $900.00 | $1,042.18 | $825.00 | $937.50 | $820.00 | $965.00 |
| 0530 | Conduit, furnish & install, open trench (0630-2-11) | LF | 806 | $20.40 | $17.82 | $18.70 | $21.25 | $18.50 | $16.50 |
| 0535 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 518 | $49.78 | $59.42 | $45.65 | $51.80 | $45.00 | $55.00 |
| 0540 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $14,670 | $17,825 | $13,448 | $15,281 | $13,300 | $16,500 |
| 0545 | Span wire assembly, F&I, two point, box or drop box (0634-4153) | PI | 1 | $13,600 | $11,884 | $12,466 | $14,166 | $12,400 | $11,000 |
| 0550 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 29 | $1,440.00 | $1,847.89 | $1,320.00 | $1,500.00 | $1,300.00 | $1,710.00 |
| 0555 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 1 | $7,200.00 | $4,991.06 | $6,600.00 | $7,500.00 | $6,500.00 | $4,620.00 |
| 0560 | Electrical service wire, & install (0639-2-1) | LF | 5 | $12.00 | $59.42 | $11.00 | $12.50 | $11.00 | $55.00 |
| 0565 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $1,440.00 | $1,188.35 | $1,320.00 | $1,500.00 | $1,300.00 | $1,100.00 |
| 0570 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 1 | $2,640.00 | $4,159.22 | $2,420.00 | $2,750.00 | $2,400.00 | $3,850.00 |
| 0575 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $7,800.00 | $4,159.22 | $7,150.00 | $8,125.00 | $7,100.00 | $3,850.00 |
| 0580 | Prestressed concrete pole, type P-VII (0641-2-17) | EACH | 1 | $38,700 | $59,418 | $35,475 | $40,313 | $35,000 | $55,000 |
| 0585 | Prestressed concrete pole, type P-VIII (0641-2-18) | EACH | 3 | $42,000 | $65,359 | $38,500 | $43,750 | $38,000 | $60,500 |
| 0590 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $3,000.00 | $4,159.22 | $2,750.00 | $3,125.00 | $2,700.00 | $3,850.00 |
| 0595 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 8 | $2,640.00 | $2,970.87 | $2,420.00 | $2,750.00 | $2,400.00 | $2,750.00 |
| 0600 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 4 | $3,000.00 | $3,030.30 | $2,750.00 | $3,125.00 | $2,700.00 | $2,800.00 |
| 0605 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,560.00 | $1,663.69 | $1,430.00 | $1,625.00 | $1,400.00 | $1,540.00 |
| 0610 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 2 | $540.00 | $796.20 | $495.00 | $562.50 | $500.00 | $740.00 |
| 0615 | Loop detector inductive, F&I, type 11, 4 CH, SS, RM (0660-1111) | EACH | 4 | $600.00 | $891.25 | $550.00 | $625.00 | $550.00 | $825.00 |
| 0620 | Loop assembly, F&I, type B (0660-2102) | AS | 12 | $1,800.00 | $2,376.71 | $1,650.00 | $1,875.00 | $1,650.00 | $2,200.00 |
| 0625 | Loop assembly, F&I, type F (0660-2106) | AS | 6 | $2,040.00 | $3,565.05 | $1,870.00 | $2,125.00 | $1,800.00 | $3,300.00 |
| 0630 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 4 | $540.00 | $950.68 | $495.00 | $562.50 | $500.00 | $900.00 |
| 0635 | Traffic controller assembly, F&I, NEMA W/standard lock (0670-5160) | AS | 1 | $54,000 | $79,619 | $49,500 | $56,250 | $49,000 | $73,700 |
| 0640 | ITS CCTV camera, pressurized, high definition (0682-1163) | EACH | 1 | $10,200 | $10,101 | $9,350.00 | $10,625 | $9,300.00 | $9,350.00 |
| 0645 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $5,400.00 | $5,941.75 | $4,950.00 | $5,625.00 | $4,900.00 | $5,500.00 |
| 0650 | Wireless communication system device, furnish & install (0684-6-1) | EACH | 1 | $16,800 | $5,941.75 | $15,400 | $17,500 | $15,000 | $5,500.00 |
| 0655 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $13,800 | $21,390 | $12,650 | $14,375 | $12,500 | $20,000 |
| 0660 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 8 | $9,000.00 | $5,585.24 | $8,250.00 | $9,375.00 | $8,200.00 | $5,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.