CDM Contracting, Inc.: FDOT bid record
CDM Contracting, Inc. submitted 16 bids on Florida DOT contracts in the data, from 24 APR 2019 to 28 OCT 2026, and was the low bidder on 7 of them (44%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $4,431,373
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 4 | 1 | 25% |
| 2020 | 2 | 1 | 50% |
| 2021 | 4 | 2 | 50% |
| 2022 | 1 | 1 | 100% |
| 2023 | 3 | 2 | 67% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 10 | 4 | 40% |
| District 3 | 6 | 3 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 16 | 11 (69%) | $0.15 | $0.13 |
| Sediment barrier | 0104-10-3 | LF | 16 | 9 (56%) | $2.02 | $2.60 |
| Work zone sign | 0102-60 | ED | 16 | 8 (50%) | $0.34 | $0.25 |
| Performance turf, sod | 0570-1-2 | SY | 16 | 4 (25%) | $5.25 | $5.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 12 | 4 (33%) | $18.05 | $12.00 |
| Single post sign, F&I ground mount, UP to 12 SF | 0700-1-11 | AS | 9 | 4 (44%) | $530.00 | $406.23 |
| Thermoplastic, standard-other surfaces, yellow, solid, 6" | 0711-16201 | GM | 7 | 4 (57%) | $25,000 | $5,200.00 |
| Borrow excavation, truck measure | 0120-2-2 | CY | 7 | 4 (57%) | $21.00 | $38.80 |
| Removal of existing concrete | 0110-4-10 | SY | 10 | 3 (30%) | $37.40 | $33.96 |
| Thermoplastic, standard, solid, 12" for crosswalk and roundabout | 0711-11123 | LF | 10 | 3 (30%) | $9.50 | $3.25 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 8 | 3 (38%) | $62.00 | $65.00 |
| Single post sign, remove | 0700-1-60 | AS | 7 | 3 (43%) | $85.00 | $31.94 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wrangler Construction Inc. | 5 | 0 of 5 |
| Anderson Columbia Co., Inc. | 5 | 1 of 5 |
| Rogar Management & Consulting of Florida LLC | 5 | 0 of 5 |
| Maer Homes, LLC | 4 | 0 of 4 |
| Burnett Civil Contracting of FL | 4 | 3 of 4 |
| DB Civil Construction, LLC | 3 | 1 of 3 |
| Aj General Construction Services, Inc. | 3 | 0 of 3 |
| GDB-US Constructors, Inc. | 2 | 0 of 2 |
| Superior Construction Company Southeast, LLC | 2 | 0 of 2 |
| West To West Construction, LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A88 | District 2 | SW 4TH AVE, SW 11TH ST AND S LAKE AVE FROM SR 121 TO SR 121 | 3 of 6 | $662,418 | +5.0% |
| 29 JUL 2026 | T2A72 | District 2 | SR 200 (US 441 / N MLK MEMORIAL HWY) FROM NW 125TH STREET TO W OF | 4 of 9 | $176,956 | +19% |
| 26 JUL 2023 | T2935 | District 2 | SR45 (US 41) AND SR 20, FROM END OF SIDEWALK TO NW 9TH RD... | 1 of 5 | $688,840 | Low, 3.0% under the second |
| 22 FEB 2023 | T3687 | District 3 | CR 274 (BARACK OBAMA BLVD) | 5 of 8 | $1,262,855 | +42% |
| 22 FEB 2023 | T3784 | District 3 | HORSE BARN RD | 1 of 2 | $830,333 | Low, 39% under the second |
| 08 JUN 2022 | T2869 | District 2 | SR 10 (US 90) | 1 of 2 | $1,298,306 | Low, 21% under the second |
| 27 OCT 2021 | T3707 | District 3 | JOE WHITE RD | 1 of 4 | $698,965 | Low, 30% under the second |
| 27 OCT 2021 | T3795 | District 3 | SIDEWALK | 2 of 3 | $658,612 | +4.0% |
| 25 AUG 2021 | T2851 | District 2 | SR 25 (US 41) | 2 of 7 | $289,646 | +24% |
| 31 MAR 2021 | T3682 | District 3 | SR 81 | 1 of 4 | $346,966 | Low, 9.0% under the second |
| 29 JUL 2020 | T2776 | District 2 | SR 20 | 1 of 4 | $198,978 | Low, 24% under the second |
| 29 JUL 2020 | T2780 | District 2 | SR 121 | 3 of 9 | $268,889 | +13% |
| 28 AUG 2019 | T2745 | District 2 | SR 26 | 2 of 6 | $184,597 | +23% |
| 31 JUL 2019 | T3666 | District 3 | CURTIS MILL RD | 2 of 5 | $578,085 | +5.0% |
| 12 JUN 2019 | T2742 | District 2 | CR 122 AND CR 23A EMERGENCY OPERATIONS - PERMANENT REPAIRS - | 2 of 3 | $104,378 | +5.0% |
| 24 APR 2019 | T2708 | District 2 | HURRICANE IRMA (74) NASSAU DIS REC OFF STATE/ON FED SYS. | 1 of 5 | $368,985 | Low, 6.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.