GDB-US Constructors, Inc.: FDOT bid record
GDB-US Constructors, Inc. submitted 34 bids on Florida DOT contracts in the data, from 23 MAY 2018 to 26 APR 2023, and was the low bidder on 4 of them (12%). When it was not low, its total sat a median +37% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $9,673,678
- Latest bid
- 26 APR 2023
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 8 | 1 | 13% |
| 2019 | 11 | 1 | 9% |
| 2020 | 11 | 1 | 9% |
| 2022 | 3 | 1 | 33% |
| 2023 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 20 | 3 | 15% |
| District 2 | 11 | 1 | 9% |
| District 7 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bedding stone | 0530-74 | TN | 33 | 9 (27%) | $110.00 | $155.00 |
| Concrete class IV, bridge substructure | 0400-4-5 | CY | 24 | 8 (33%) | $1,165.00 | $1,700.00 |
| Riprap, rubble, F&I, ditch lining | 0530-3-4 | TN | 20 | 8 (40%) | $120.00 | $200.00 |
| Reinforcing steel- approach slabs | 0415-1-9 | LB | 26 | 7 (27%) | $1.10 | $1.30 |
| Embankment | 0120-6 | CY | 17 | 7 (41%) | $20.00 | $30.04 |
| Inlets, gutter, type S, <10' | 0425-1701 | EACH | 10 | 7 (70%) | $4,350.00 | $6,110.00 |
| Reinforcing steel - bridge superstructure | 0415-1-4 | LB | 26 | 6 (23%) | $1.10 | $1.30 |
| Reinforcing steel- bridge substructure | 0415-1-5 | LB | 25 | 6 (24%) | $1.10 | $1.38 |
| Regular excavation | 0120-1 | CY | 33 | 5 (15%) | $22.00 | $25.47 |
| Channelizing device, type III, 6' | 0102-74-2 | ED | 23 | 4 (17%) | $0.50 | $0.35 |
| Concrete traffic railing- 36" single-slope | 0521-5-13 | LF | 21 | 4 (19%) | $160.00 | $150.00 |
| Artificial coverings /rolled erosion control products | 0104-1 | SY | 17 | 4 (24%) | $10.00 | $6.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anderson Columbia Co., Inc. | 22 | 17 of 22 |
| Superior Construction Company Southeast, LLC | 17 | 6 of 17 |
| Murphree Bridge Corporation | 12 | 11 of 12 |
| Vecellio & Grogan, Inc. | 11 | 5 of 11 |
| Roads, Inc. of NWF | 5 | 3 of 5 |
| Commercial Industrial Corp. | 5 | 4 of 5 |
| F & W Construction Company, Inc. | 4 | 4 of 4 |
| Gosalia Concrete Constructors, Inc. | 4 | 3 of 4 |
| Leware Construction Company of Florida, Inc. | 3 | 1 of 3 |
| Sema Construction, Inc. | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 APR 2023 | T3824 | District 3 | CR 4 W HWY 4 | 2 of 2 | $6,227,355 | +75% |
| 26 OCT 2022 | T3774 | District 3 | TRAM RD | 4 of 5 | $3,276,987 | +39% |
| 25 MAY 2022 | T3719 | District 3 | THOMAS DR | 2 of 2 | $3,364,687 | +56% |
| 25 MAY 2022 | T3801 | District 3 | SR 4 | 1 of 3 | $351,984 | Low, 61% under the second |
| 02 DEC 2020 | T3735 | District 3 | SR 30 (US 98) | 5 of 6 | $8,489,773 | +52% |
| 18 NOV 2020 | T2792 | District 2 | CR 361 | 3 of 4 | $4,589,871 | +67% |
| 18 NOV 2020 | T3691 | District 3 | SR 289 (9TH AVE) | 1 of 4 | $4,269,226 | Low, 4.0% under the second |
| 29 JUL 2020 | T3717 | District 3 | CR 278 (PIONEER RD) | 4 of 7 | $848,225 | +10% |
| 29 JUL 2020 | T7457 | District 7 | SR 55/US 19 | 3 of 3 | $1,978,705 | +81% |
| 10 JUN 2020 | T7448 | District 7 | 9TH ST S (MLK ST) | 2 of 4 | $6,952,455 | +14% |
| 20 MAY 2020 | T2772 | District 2 | SR 105/SR A1A (HECKSCHER DR) | 2 of 5 | $10,878,357 | 0.0% |
| 20 MAY 2020 | T2774 | District 2 | CR 200A | 4 of 4 | $1,528,661 | +43% |
| 25 MAR 2020 | T2764 | District 2 | SR 15 (US 17) | 3 of 4 | $1,428,503 | +50% |
| 25 MAR 2020 | T2773 | District 2 | SR 200 (US 301) | 2 of 6 | $4,163,589 | +13% |
| 25 MAR 2020 | T7437 | District 7 | BOOKER CREEK BR | 2 of 2 | $2,562,525 | +35% |
| 04 DEC 2019 | T2752 | District 2 | CR 231 | 4 of 5 | $8,945,785 | +39% |
| 04 DEC 2019 | T3689 | District 3 | SR 65 | 4 of 5 | $5,447,804 | +38% |
| 04 DEC 2019 | T3699 | District 3 | CR 389 (EAST AVE) | 3 of 5 | $3,315,843 | +23% |
| 30 OCT 2019 | T2751 | District 2 | CR 339 | 4 of 6 | $4,444,491 | +13% |
| 30 OCT 2019 | T3632 | District 3 | SR 30 (US 98) | 6 of 6 | $7,245,512 | +46% |
| 25 SEP 2019 | T3668 | District 3 | FOREST HIGHWAY (FH) 356 LAWHON MILL RD | 4 of 5 | $1,979,163 | +39% |
| 28 AUG 2019 | T3648 | District 3 | CR 65A (JUNIPER CREEK RD) | 3 of 4 | $1,879,732 | +44% |
| 31 JUL 2019 | T3666 | District 3 | CURTIS MILL RD | 5 of 5 | $958,321 | +74% |
| 24 APR 2019 | T2708 | District 2 | HURRICANE IRMA (74) NASSAU DIS REC OFF STATE/ON FED SYS. | 4 of 5 | $453,910 | +23% |
| 24 APR 2019 | T2739 | District 2 | C ST | 2 of 4 | $7,402,866 | +10% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.