GDB-US Constructors, Inc.: FDOT bid record

GDB-US Constructors, Inc. submitted 34 bids on Florida DOT contracts in the data, from 23 MAY 2018 to 26 APR 2023, and was the low bidder on 4 of them (12%). When it was not low, its total sat a median +37% above the low bid.

Owner
Florida DOT
Low bid volume
$9,673,678
Latest bid
26 APR 2023
Data through
28 OCT 2026
34Bids
4Low bids
12Win rate, percent
+37%Median gap to the low bid when not low, 30 bids

By year

YearBidsLow bidsWin rate
20188113%
20191119%
20201119%
20223133%
2023100%
GDB-US Constructors, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 320315%
District 21119%
District 7300%
GDB-US Constructors, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bedding stone0530-74TN339 (27%)$110.00$155.00
Concrete class IV, bridge substructure0400-4-5CY248 (33%)$1,165.00$1,700.00
Riprap, rubble, F&I, ditch lining0530-3-4TN208 (40%)$120.00$200.00
Reinforcing steel- approach slabs0415-1-9LB267 (27%)$1.10$1.30
Embankment0120-6CY177 (41%)$20.00$30.04
Inlets, gutter, type S, <10'0425-1701EACH107 (70%)$4,350.00$6,110.00
Reinforcing steel - bridge superstructure0415-1-4LB266 (23%)$1.10$1.30
Reinforcing steel- bridge substructure0415-1-5LB256 (24%)$1.10$1.38
Regular excavation0120-1CY335 (15%)$22.00$25.47
Channelizing device, type III, 6'0102-74-2ED234 (17%)$0.50$0.35
Concrete traffic railing- 36" single-slope0521-5-13LF214 (19%)$160.00$150.00
Artificial coverings /rolled erosion control products0104-1SY174 (24%)$10.00$6.00
GDB-US Constructors, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

GDB-US Constructors, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
26 APR 2023T3824District 3CR 4 W HWY 42 of 2$6,227,355+75%
26 OCT 2022T3774District 3TRAM RD4 of 5$3,276,987+39%
25 MAY 2022T3719District 3THOMAS DR2 of 2$3,364,687+56%
25 MAY 2022T3801District 3SR 41 of 3$351,984Low, 61% under the second
02 DEC 2020T3735District 3SR 30 (US 98)5 of 6$8,489,773+52%
18 NOV 2020T2792District 2CR 3613 of 4$4,589,871+67%
18 NOV 2020T3691District 3SR 289 (9TH AVE)1 of 4$4,269,226Low, 4.0% under the second
29 JUL 2020T3717District 3CR 278 (PIONEER RD)4 of 7$848,225+10%
29 JUL 2020T7457District 7SR 55/US 193 of 3$1,978,705+81%
10 JUN 2020T7448District 79TH ST S (MLK ST)2 of 4$6,952,455+14%
20 MAY 2020T2772District 2SR 105/SR A1A (HECKSCHER DR)2 of 5$10,878,3570.0%
20 MAY 2020T2774District 2CR 200A4 of 4$1,528,661+43%
25 MAR 2020T2764District 2SR 15 (US 17)3 of 4$1,428,503+50%
25 MAR 2020T2773District 2SR 200 (US 301)2 of 6$4,163,589+13%
25 MAR 2020T7437District 7BOOKER CREEK BR2 of 2$2,562,525+35%
04 DEC 2019T2752District 2CR 2314 of 5$8,945,785+39%
04 DEC 2019T3689District 3SR 654 of 5$5,447,804+38%
04 DEC 2019T3699District 3CR 389 (EAST AVE)3 of 5$3,315,843+23%
30 OCT 2019T2751District 2CR 3394 of 6$4,444,491+13%
30 OCT 2019T3632District 3SR 30 (US 98)6 of 6$7,245,512+46%
25 SEP 2019T3668District 3FOREST HIGHWAY (FH) 356 LAWHON MILL RD4 of 5$1,979,163+39%
28 AUG 2019T3648District 3CR 65A (JUNIPER CREEK RD)3 of 4$1,879,732+44%
31 JUL 2019T3666District 3CURTIS MILL RD5 of 5$958,321+74%
24 APR 2019T2708District 2HURRICANE IRMA (74) NASSAU DIS REC OFF STATE/ON FED SYS.4 of 5$453,910+23%
24 APR 2019T2739District 2C ST2 of 4$7,402,866+10%
GDB-US Constructors, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy