F & W Construction Company, Inc.: FDOT bid record
F & W Construction Company, Inc. submitted 18 bids on Florida DOT contracts in the data, from 14 NOV 2018 to 28 OCT 2026, and was the low bidder on 8 of them (44%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $20,438,137
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 1 | 50% |
| 2019 | 2 | 2 | 100% |
| 2021 | 3 | 2 | 67% |
| 2022 | 1 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 1 | 1 | 100% |
| 2025 | 1 | 0 | 0% |
| 2026 | 6 | 1 | 17% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bedding stone | 0530-74 | TN | 26 | 19 (73%) | $90.00 | $155.00 |
| Concrete class IV, bridge substructure | 0400-4-5 | CY | 16 | 15 (94%) | $850.00 | $1,700.00 |
| Riprap- rubble, bank and shore | 0530-3-3 | TN | 19 | 14 (74%) | $90.00 | $127.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 17 | 13 (76%) | $0.12 | $0.13 |
| Portable changeable message sign, temporary | 0102-99 | ED | 17 | 13 (76%) | $17.00 | $12.00 |
| Type III barricade | 0102-115 | ED | 14 | 12 (86%) | $0.35 | $0.34 |
| Optional base, base group 06 | 0285-706 | SY | 18 | 11 (61%) | $21.20 | $31.00 |
| Conduit, furnish & install, embedded concrete barriers and traffic railings | 0630-2-16 | LF | 15 | 11 (73%) | $10.00 | $15.70 |
| Work zone sign | 0102-60 | ED | 18 | 10 (56%) | $0.32 | $0.25 |
| Concrete traffic railing- 36" single-slope | 0521-5-13 | LF | 17 | 10 (59%) | $130.00 | $150.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 18 | 9 (50%) | $5.96 | $5.00 |
| Regular excavation | 0120-1 | CY | 18 | 9 (50%) | $15.03 | $25.47 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Murphree Bridge Corporation | 12 | 6 of 12 |
| Anderson Columbia Co., Inc. | 11 | 2 of 11 |
| Superior Construction Company Southeast, LLC | 11 | 2 of 11 |
| RJ Gorman Contracting LLC | 7 | 1 of 7 |
| GDB-US Constructors, Inc. | 4 | 0 of 4 |
| Scott Bridge Company, Inc. | 3 | 1 of 3 |
| RBM Contracting Services, LLC | 2 | 1 of 2 |
| Southern Road & Bridge, LLC | 2 | 0 of 2 |
| Vecellio & Grogan, Inc. | 1 | 0 of 1 |
| Kiewit Infrastructure South Co. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T3970 | District 3 | HANNA MILL POND RD OVER HANNA POND BRIDGE NO 504043 | 3 of 5 | $5,870,273 | +12% |
| 29 APR 2026 | T3919 | District 3 | HUB PRESLEY RD OVER POND CREEK, BRIDGE NO 604152 | 1 of 4 | $1,664,580 | Low, 9.0% under the second |
| 25 MAR 2026 | T3939 | District 3 | CR 173 (BETHEL RD) OVER GUM CREEK NO 2, BRIDGE NO 610026 | 2 of 3 | $1,637,391 | +33% |
| 25 FEB 2026 | T3928 | District 3 | SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 464419 | 2 of 6 | $5,769,179 | +3.0% |
| 28 JAN 2026 | T3929 | District 3 | CR 274 OVER TENMILE CREEK BRIDGE NO. 470035 | 3 of 7 | $6,596,309 | +14% |
| 28 JAN 2026 | T3954 | District 3 | KLONDIKE RD OVER UNNAMED BRANCH BRIDGE NO 484060 | 2 of 3 | $2,706,899 | +2.0% |
| 30 APR 2025 | T3879 | District 3 | HOWELL WILLIAMS RD OVER TEN MILE CREEK, BRIDGE NO 524150 | 2 of 3 | $2,415,840 | +7.0% |
| 31 JAN 2024 | T3790 | District 3 | WOODHAM RD OVER HOLMES CREEK AND RELIEF BRIDGE ... | 1 of 3 | $3,547,402 | Low, 4.0% under the second |
| 13 SEP 2023 | T3788 | District 3 | CR 30A OVER WESTERN LAKE, BRIDGE NO. 60089 | 2 of 3 | $11,994,830 | +1.0% |
| 26 APR 2023 | T3792 | District 3 | BUDDY RD | 1 of 3 | $1,248,264 | Low, 28% under the second |
| 26 OCT 2022 | T3774 | District 3 | TRAM RD | 2 of 5 | $2,616,355 | +11% |
| 08 DEC 2021 | T3704 | District 3 | PLEASANT RIDGE RD | 1 of 4 | $1,462,111 | Low, 5.0% under the second |
| 28 JUL 2021 | T3742 | District 3 | CR 273 | 1 of 3 | $3,745,152 | Low, 16% under the second |
| 09 JUN 2021 | T3711 | District 3 | SR 10 (US 90) | 4 of 5 | $11,728,648 | +43% |
| 04 DEC 2019 | T3699 | District 3 | CR 389 (EAST AVE) | 1 of 5 | $2,694,142 | Low, 14% under the second |
| 30 OCT 2019 | T3632 | District 3 | SR 30 (US 98) | 1 of 6 | $4,962,076 | Low, 10% under the second |
| 05 DEC 2018 | T3679 | District 3 | HICKS RD | 2 of 3 | $1,793,531 | +10% |
| 14 NOV 2018 | T3619 | District 3 | VALEE RD | 1 of 4 | $1,114,410 | Low, 10% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.