FDOT contract T3919 bid tabulation
HUB PRESLEY RD OVER POND CREEK, BRIDGE NO 604152. Let by Florida DOT on April 29, 2026, Walton, District 3. 4 bids received; low bid $1,664,580 by F & W Construction Company, Inc..
- Owner
- Florida DOT
- Letting
- 29 APR 2026
- Pay items
- 52
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | F & W Construction Company, Inc. | $1,664,580 | Low |
| 2 | Anderson Columbia Co., Inc. | $1,811,532 | +9.0% |
| 3 | Murphree Bridge Corporation | $1,878,085 | +13% |
| 4 | H. G. Harders & Son, Inc. | $2,960,925 | +78% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. F & W Construction Company, Inc. | 2. Anderson Columbia Co., Inc. | 3. Murphree Bridge Corporation | 4. H. G. Harders & Son, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $183,500 | $186,600 | $90,000 | $91,611 |
| 0010 | Conc class II, bridge superstructure (0400-2-4) | CY | 129.90 | $750.00 | $1,250.00 | $1,900.00 | $3,730.00 |
| 0015 | Concrete class II, approach slabs (0400-2-10) | CY | 40.40 | $650.00 | $800.00 | $990.00 | $2,293.00 |
| 0020 | Concrete class IV, bridge substructure (0400-4-5) | CY | 34.50 | $800.00 | $2,650.00 | $3,400.00 | $2,677.00 |
| 0025 | Conc class IV, bulkhead (0400-4-8) | CY | 32.60 | $1,000.00 | $2,200.00 | $4,450.00 | $2,205.50 |
| 0030 | Bridge deck grooving (0400-7-1) | SY | 240 | $35.00 | $26.00 | $20.00 | $34.00 |
| 0035 | Plain neoprene bearing pads (0400-148) | CF | 3.30 | $5,000.00 | $1,950.00 | $1,850.00 | $3,650.00 |
| 0040 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 38,205 | $2.50 | $1.50 | $1.85 | $2.58 |
| 0045 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 4,754 | $2.50 | $2.50 | $1.85 | $2.58 |
| 0050 | Reinforcing steel- bulkhead (0415-1-8) | LB | 2,960 | $2.50 | $2.50 | $1.85 | $2.58 |
| 0055 | Reinforcing steel- approach slabs (0415-1-9) | LB | 8,088 | $2.50 | $1.50 | $1.85 | $2.58 |
| 0065 | Pile inspection, driven pile (0455-20-1) | EACH | 14 | $2,500.00 | $600.00 | $1,500.00 | $1,000.00 |
| 0070 | Prestressed concrete piling, SQ (0455-34-5) | LF | 589 | $85.00 | $210.00 | $335.00 | $850.00 |
| 0075 | Pile redrive (0455-115) | EACH | 4 | $2,500.00 | $1,725.00 | $1,200.00 | $5,000.00 |
| 0080 | Sheet piling steel, F&I (0455-133-3) | SF | 6,102 | $90.00 | $72.00 | $62.50 | $85.00 |
| 0085 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 14 | $1,500.00 | $1,950.00 | $1,800.00 | $1,500.00 |
| 0090 | Load test (dynamic), test (0455-137-2) | EACH | 14 | $1,000.00 | $2,350.00 | $1,800.00 | $1,500.00 |
| 0095 | Test piles-prestressed concrete,24" SQ (0455-143-5) | LF | 135 | $300.00 | $450.00 | $250.00 | $1,500.00 |
| 0100 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 54 | $60.00 | $85.00 | $80.00 | $75.00 |
| 0105 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 260 | $250.00 | $175.00 | $150.00 | $170.00 |
| 0110 | Riprap- rubble, bank and shore (0530-3-3) | TN | 305 | $90.00 | $115.00 | $100.00 | $304.75 |
| 0115 | Bedding stone (0530-74) | TN | 113.50 | $85.00 | $185.00 | $116.00 | $270.00 |
| 0120 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 260 | $10.00 | $22.00 | $13.00 | $46.00 |
| 0125 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 4 | $500.00 | $800.00 | $800.00 | $450.00 |
| 0130 | Mobilization (0101-1) | LS | 1 | $100,000 | $180,000 | $98,242 | $194,050 |
| 0135 | Maintenance of traffic (0102-1) | DA | 1 | $7,500.00 | $4,000.00 | $25,000 | $14,000 |
| 0140 | Work zone sign (0102-60) | ED | 17,976 | $0.35 | $0.16 | $0.35 | $0.28 |
| 0145 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 3,648 | $0.12 | $0.16 | $0.12 | $0.17 |
| 0150 | Portable changeable message sign, temporary (0102-99) | ED | 912 | $18.00 | $17.00 | $18.00 | $35.00 |
| 0155 | Type III barricade (0102-115) | ED | 1,712 | $0.35 | $0.55 | $0.35 | $0.58 |
| 0160 | Sediment barrier (0104-10-3) | LF | 869 | $4.50 | $6.50 | $5.00 | $9.80 |
| 0165 | Floating turbidity barrier (0104-11) | LF | 40 | $24.25 | $60.00 | $25.00 | $43.10 |
| 0170 | Soil tracking prevention device (0104-15) | EACH | 2 | $7,200.00 | $350.00 | $6,900.00 | $7,187.50 |
| 0175 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $15,500 | $17,000 | $11,686 | $26,910 |
| 0180 | Regular excavation (0120-1) | CY | 1,418 | $12.35 | $7.75 | $32.00 | $24.15 |
| 0185 | Embankment (0120-6) | CY | 659.40 | $15.62 | $11.00 | $19.00 | $26.50 |
| 0190 | Type B stabilization (0160-4) | SY | 918 | $16.85 | $20.00 | $14.50 | $12.65 |
| 0195 | Optional base, base group 06 (0285-706) | SY | 718 | $20.15 | $30.00 | $39.00 | $51.90 |
| 0200 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 49.40 | $485.00 | $310.00 | $327.00 | $408.60 |
| 0205 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 60.90 | $485.00 | $285.00 | $362.00 | $404.50 |
| 0210 | Shoulder gutter- concrete (0520-6) | LF | 94 | $74.85 | $120.00 | $99.00 | $74.75 |
| 0215 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 12 | $205.00 | $185.00 | $277.00 | $328.00 |
| 0220 | Bedding stone (0530-74) | TN | 8.60 | $195.00 | $185.00 | $271.00 | $305.00 |
| 0225 | Guardrail removal (0536-73) | LF | 307 | $10.00 | $13.00 | $10.00 | $29.00 |
| 0230 | Performance turf, sod (0570-1-2) | SY | 819 | $9.15 | $3.85 | $4.92 | $9.80 |
| 0235 | Object marker, type 3 (0705-10-3) | EACH | 4 | $400.00 | $200.00 | $400.00 | $632.50 |
| 0240 | Raised pavement marker, type B (0706-1-3) | EACH | 18 | $10.00 | $10.75 | $10.00 | $11.50 |
| 0245 | Painted pavement markings, surface (0710-90) | LS | 1 | $1,100.00 | $1,250.00 | $1,100.00 | $1,725.00 |
| 0250 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.10 | $17,500 | $20,000 | $17,500 | $14,375 |
| 0255 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.10 | $17,500 | $20,000 | $17,500 | $14,375 |
| 0260 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.03 | $32,500 | $35,000 | $32,500 | $51,750 |
| 0265 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.03 | $32,500 | $35,000 | $32,500 | $51,750 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.