Scott Bridge Company, Inc.: FDOT bid record

Scott Bridge Company, Inc. submitted 12 bids on Florida DOT contracts in the data, from 23 MAY 2018 to 27 APR 2022, and was the low bidder on 2 of them (17%). When it was not low, its total sat a median +21% above the low bid.

Owner
Florida DOT
Low bid volume
$18,684,914
Latest bid
27 APR 2022
Data through
28 OCT 2026
12Bids
2Low bids
17Win rate, percent
+21%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20183133%
20193133%
2020100%
2021400%
2022100%
Scott Bridge Company, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 311218%
District 2100%
Scott Bridge Company, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Work zone sign0102-60ED108 (80%)$0.24$0.25
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED97 (78%)$0.10$0.13
Performance turf, sod0570-1-2SY105 (50%)$3.27$5.00
Test piles-prestressed concrete,24" SQ0455-143-5LF65 (83%)$226.59$325.00
Portable changeable message sign, temporary0102-99ED94 (44%)$11.00$12.00
Painted pavement markings, standard, white, solid, 6"0710-11101GM94 (44%)$1,006.48$1,350.00
Painted pavement markings, standard, yellow, solid, 6"0710-11201GM94 (44%)$1,006.48$1,350.00
Guardrail removal0536-73LF94 (44%)$2.50$3.00
Soil tracking prevention device0104-15EACH94 (44%)$2,516.20$3,400.00
Single post sign, remove0700-1-60AS84 (50%)$37.50$31.94
Temporary crash cushion, redirective option0102-89-1LO84 (50%)$923.68$1,104.80
Channelizing device, type III, 6'0102-74-2ED64 (67%)$0.36$0.35
Scott Bridge Company, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Scott Bridge Company, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
27 APR 2022T3800District 3SR 292 (PERDIDO KEY DR)3 of 7$4,038,314+14%
17 NOV 2021T3712District 3CR 674 of 4$4,996,138+19%
29 SEP 2021T3799District 3SR 30 (US 98)4 of 4$894,414+70%
09 JUN 2021T3705District 3SR 10 (US 90)2 of 5$22,237,152+2.0%
09 JUN 2021T3711District 3SR 10 (US 90)2 of 5$8,990,226+10%
02 DEC 2020T3735District 3SR 30 (US 98)3 of 6$6,519,285+17%
04 DEC 2019T3699District 3CR 389 (EAST AVE)4 of 5$3,417,276+27%
30 OCT 2019T3632District 3SR 30 (US 98)5 of 6$6,845,209+38%
27 FEB 2019T3604District 3SR 41 of 7$10,228,411Low, 2.0% under the second
13 JUN 2018T3586District 3CR 1593 of 3$5,299,156+26%
23 MAY 2018T2703District 2CR 2502 of 3$14,316,392+22%
23 MAY 2018T3660District 3SR 397 (JOHN SIMS PKWY)1 of 3$8,456,503Low, 18% under the second
Scott Bridge Company, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy