Scott Bridge Company, Inc.: FDOT bid record
Scott Bridge Company, Inc. submitted 12 bids on Florida DOT contracts in the data, from 23 MAY 2018 to 27 APR 2022, and was the low bidder on 2 of them (17%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $18,684,914
- Latest bid
- 27 APR 2022
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 1 | 33% |
| 2019 | 3 | 1 | 33% |
| 2020 | 1 | 0 | 0% |
| 2021 | 4 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 11 | 2 | 18% |
| District 2 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone sign | 0102-60 | ED | 10 | 8 (80%) | $0.24 | $0.25 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 9 | 7 (78%) | $0.10 | $0.13 |
| Performance turf, sod | 0570-1-2 | SY | 10 | 5 (50%) | $3.27 | $5.00 |
| Test piles-prestressed concrete,24" SQ | 0455-143-5 | LF | 6 | 5 (83%) | $226.59 | $325.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 9 | 4 (44%) | $11.00 | $12.00 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 9 | 4 (44%) | $1,006.48 | $1,350.00 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 9 | 4 (44%) | $1,006.48 | $1,350.00 |
| Guardrail removal | 0536-73 | LF | 9 | 4 (44%) | $2.50 | $3.00 |
| Soil tracking prevention device | 0104-15 | EACH | 9 | 4 (44%) | $2,516.20 | $3,400.00 |
| Single post sign, remove | 0700-1-60 | AS | 8 | 4 (50%) | $37.50 | $31.94 |
| Temporary crash cushion, redirective option | 0102-89-1 | LO | 8 | 4 (50%) | $923.68 | $1,104.80 |
| Channelizing device, type III, 6' | 0102-74-2 | ED | 6 | 4 (67%) | $0.36 | $0.35 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anderson Columbia Co., Inc. | 9 | 6 of 9 |
| Superior Construction Company Southeast, LLC | 9 | 3 of 9 |
| Vecellio & Grogan, Inc. | 4 | 3 of 4 |
| F & W Construction Company, Inc. | 3 | 2 of 3 |
| GDB-US Constructors, Inc. | 3 | 1 of 3 |
| Kiewit Infrastructure South Co. | 3 | 0 of 3 |
| Murphree Bridge Corporation | 2 | 2 of 2 |
| GLF Construction Corporation | 2 | 0 of 2 |
| M & J Construction Company of Pinellas County, Inc. | 2 | 1 of 2 |
| Southern Road & Bridge, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 APR 2022 | T3800 | District 3 | SR 292 (PERDIDO KEY DR) | 3 of 7 | $4,038,314 | +14% |
| 17 NOV 2021 | T3712 | District 3 | CR 67 | 4 of 4 | $4,996,138 | +19% |
| 29 SEP 2021 | T3799 | District 3 | SR 30 (US 98) | 4 of 4 | $894,414 | +70% |
| 09 JUN 2021 | T3705 | District 3 | SR 10 (US 90) | 2 of 5 | $22,237,152 | +2.0% |
| 09 JUN 2021 | T3711 | District 3 | SR 10 (US 90) | 2 of 5 | $8,990,226 | +10% |
| 02 DEC 2020 | T3735 | District 3 | SR 30 (US 98) | 3 of 6 | $6,519,285 | +17% |
| 04 DEC 2019 | T3699 | District 3 | CR 389 (EAST AVE) | 4 of 5 | $3,417,276 | +27% |
| 30 OCT 2019 | T3632 | District 3 | SR 30 (US 98) | 5 of 6 | $6,845,209 | +38% |
| 27 FEB 2019 | T3604 | District 3 | SR 4 | 1 of 7 | $10,228,411 | Low, 2.0% under the second |
| 13 JUN 2018 | T3586 | District 3 | CR 159 | 3 of 3 | $5,299,156 | +26% |
| 23 MAY 2018 | T2703 | District 2 | CR 250 | 2 of 3 | $14,316,392 | +22% |
| 23 MAY 2018 | T3660 | District 3 | SR 397 (JOHN SIMS PKWY) | 1 of 3 | $8,456,503 | Low, 18% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.