GLF Construction Corporation: FDOT bid record
GLF Construction Corporation submitted 13 bids on Florida DOT contracts in the data, from 23 MAY 2018 to 30 APR 2025, and was the low bidder on 2 of them (15%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $110,440,501
- Latest bid
- 30 APR 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 7 | 1 | 14% |
| 2019 | 3 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
| 2025 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 5 | 0 | 0% |
| District 3 | 3 | 0 | 0% |
| District 4 | 2 | 1 | 50% |
| District 6 | 1 | 1 | 100% |
| District 2 | 1 | 0 | 0% |
| District 1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 9 | 9 (100%) | $3,300.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 9 | 9 (100%) | $4,000.00 | $4,500.00 |
| Performance turf, sod | 0570-1-2 | SY | 14 | 7 (50%) | $2.50 | $5.00 |
| Type B stabilization | 0160-4 | SY | 14 | 7 (50%) | $4.62 | $15.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 11 | 7 (64%) | $5.20 | $5.90 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 22 | 6 (27%) | $8.90 | $16.54 |
| Litter removal | 0107-1 | ACRE | 12 | 6 (50%) | $15.50 | $52.98 |
| Mowing | 0107-2 | ACRE | 12 | 5 (42%) | $40.00 | $80.65 |
| Thermoplastic, standard, solid, 18" for diagonals and chevrons | 0711-11124 | LF | 12 | 5 (42%) | $4.79 | $4.58 |
| Signal cable- new or reconstructed intersection, furnish & install | 0632-7-1 | PI | 9 | 5 (56%) | $5,000.00 | $8,921.00 |
| Bridge deck expansion joint, construction, F&I poured joint with backer rod | 0458-1-11 | LF | 9 | 5 (56%) | $30.00 | $65.00 |
| Work zone sign | 0102-60 | ED | 13 | 4 (31%) | $0.25 | $0.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Superior Construction Company Southeast, LLC | 5 | 1 of 5 |
| Prince Contracting, LLC. | 4 | 3 of 4 |
| Cone & Graham, Inc. | 4 | 1 of 4 |
| Sema Construction, Inc. | 4 | 1 of 4 |
| Johnson Bros. Corporation, A Southland Company | 3 | 0 of 3 |
| D.A.B. Constructors, Inc. | 3 | 2 of 3 |
| Watson Civil Construction, Inc. | 3 | 2 of 3 |
| Vecellio & Grogan, Inc. | 3 | 1 of 3 |
| Hubbard Construction Company | 2 | 0 of 2 |
| Ajax Paving Industries of Florida LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 APR 2025 | T4711 | District 4 | SR 838 AND SR 836 (SUNRISE BLVD) OVER INTRACOASTAL WATER... | 1 of 4 | $43,210,000 | Low, 17% under the second |
| 25 SEP 2024 | T4714 | District 4 | SR 5 (US 1) OVER EARMAN RIVER (C-17) BRIDGE NO 930003 | 2 of 5 | $13,944,467 | +2.0% |
| 24 APR 2024 | T1850 | District 1 | CR 664 (COUNTYLINE RD) OVER PEACE RIVER, BRIDGE NO 160101 | 7 of 8 | $7,645,800 | +45% |
| 27 MAR 2019 | T7424 | District 7 | CR 578 (CO LINE RD) | 3 of 5 | $23,309,583 | +16% |
| 27 FEB 2019 | T2732 | District 2 | SR 20 | 6 of 11 | $25,245,145 | +7.0% |
| 27 FEB 2019 | T3604 | District 3 | SR 4 | 3 of 7 | $10,985,789 | +7.0% |
| 26 SEP 2018 | T3702 | District 3 | SR 388 | 4 of 5 | $60,497,492 | +21% |
| 13 JUN 2018 | T6433 | District 6 | SR 968 (SW 1ST ST) | 1 of 6 | $67,230,501 | Low, -2.0% under the second |
| 13 JUN 2018 | T7408 | District 7 | SR 93A (I-75) AND SR 60 (ADAMO DR) | 2 of 4 | $57,258,604 | +9.0% |
| 13 JUN 2018 | T7412 | District 7 | SR 56 (I-75) INTERCHANGE | 2 of 4 | $34,434,548 | +4.0% |
| 23 MAY 2018 | T3660 | District 3 | SR 397 (JOHN SIMS PKWY) | 2 of 3 | $9,973,804 | +18% |
| 23 MAY 2018 | T7403 | District 7 | SR 45 (US 41) (50TH ST) | 3 of 5 | $17,472,222 | +15% |
| 23 MAY 2018 | T7406 | District 7 | SR 93A (I-75) | 2 of 9 | $16,883,894 | +9.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.