FDOT contract T4711 bid tabulation
SR 838 AND SR 836 (SUNRISE BLVD) OVER INTRACOASTAL WATER... Let by Florida DOT on April 30, 2025, Broward, District 4. 4 bids received; low bid $43,210,000 by GLF Construction Corporation.
- Owner
- Florida DOT
- Letting
- 30 APR 2025
- Pay items
- 251
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | GLF Construction Corporation | $43,210,000 | Low |
| 2 | Seacoast Incorporated | $50,371,437 | +17% |
| 3 | Southern Road & Bridge, LLC | $65,485,726 | +52% |
| 4 | Superior Construction Company Southeast, LLC | $74,809,160 | +73% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. GLF Construction Corporation | 2. Seacoast Incorporated | 3. Southern Road & Bridge, LLC | 4. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|---|
| 0005 | Floating turbidity barrier (0104-11) | LF | 1,180 | $90.00 | $12.00 | $10.00 | $100.00 |
| 0010 | Removal of existing structures/bridges 44145615201- 860467 (0110-3) | SF | 1 | $370,000 | $300,000 | $125,000 | $360,000 |
| 0015 | Removal of existing structures/bridges 44145615201- 860466 (0110-3) | SF | 1 | $350,000 | $300,000 | $125,000 | $542,000 |
| 0020 | Bridge fender system, removal disposal (0110-71-1) | LF | 520 | $1,100.00 | $2,100.00 | $1,250.00 | $800.00 |
| 0025 | Channel excavation (0120-5) | CY | 3,244.40 | $120.00 | $455.00 | $125.00 | $225.00 |
| 0030 | Concrete class II, approach slabs (0400-2-10) | CY | 73.20 | $1,500.00 | $3,000.00 | $2,850.00 | $1,150.00 |
| 0035 | Concrete class IV, superstructure (0400-4-4) | CY | 8.80 | $12,000 | $2,500.00 | $25,000 | $20,000 |
| 0040 | Cleaning & coating concrete surface, class 5 (0400-143) | SF | 29,430 | $3.40 | $5.00 | $6.50 | $7.00 |
| 0045 | Epoxy concrete overlay for concrete bridge decks (0403-1100) | SY | 264 | $460.00 | $85.00 | $205.00 | $950.00 |
| 0050 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 370 | $2.00 | $15.00 | $4.00 | $12.30 |
| 0055 | Reinforcing steel- miscellaneous (0415-1-6) | LB | 7,088 | $3.00 | $10.00 | $5.00 | $1.70 |
| 0060 | Reinforcing steel- approach slabs (0415-1-9) | LB | 6,552 | $3.00 | $10.00 | $5.00 | $2.20 |
| 0065 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 19,470 | $80.00 | $48.00 | $98.00 | $100.00 |
| 0070 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 1,412 | $75.00 | $65.00 | $88.00 | $150.00 |
| 0075 | Struct steel - rehabilitation, bascule leaves (0460-1-5) | LB | 114,018 | $13.50 | $14.00 | $58.00 | $20.00 |
| 0080 | Ladders & platforms, rehab (0460-6-2) | LB | 12,621 | $19.00 | $18.00 | $88.00 | $21.50 |
| 0085 | Movable bridge machinery & casting-rehabilitation, F&I reducer & gear train 860467 (0465-2101) | LS | 1 | $1,800,000 | $1,800,000 | $250,000 | $2,450,000 |
| 0090 | Movable bridge machinery & casting-rehabilitation, F&I reducer & gear train 860466 (0465-2101) | LS | 1 | $1,800,000 | $1,800,000 | $250,000 | $2,220,300 |
| 0095 | Movable bridge machinery & casting-rehabilitation, F&I span locks (0465-2105) | AS | 4 | $125,000 | $125,000 | $195,000 | $160,000 |
| 0100 | Movable bridge machinery & casting-rehabilitation, F&I live load shoes 44145615201- 860467 (0465-2108) | LS | 1 | $125,000 | $89,000 | $150,000 | $106,000 |
| 0105 | Movable bridge machinery & casting-rehabilitation, remove dispose, speed reducer & gear train 44145615201- 860467 (0465-2601) | LS | 1 | $60,000 | $250,000 | $350,000 | $300,000 |
| 0110 | Movable bridge machinery & casting-rehabilitation, remove dispose-contractor owns, span locks (0465-2605) | AS | 4 | $8,500.00 | $25,000 | $35,000 | $30,000 |
| 0115 | Movable bridge machinery & casting-rehabilitation, remove dispose-contractor owns, live load shoes 44145615201- 860467 (0465-2608) | LS | 1 | $17,600 | $45,000 | $35,000 | $30,000 |
| 0120 | Movable bridge counterweight, F&I, balance blocks (0465-3-17) | EACH | 600 | $250.00 | $180.00 | $250.00 | $250.00 |
| 0125 | Movable bridge counterweight, adjust (0465-3-50) | EACH | 4 | $32,000 | $11,000 | $22,500 | $15,500 |
| 0130 | Movable bridge- preventative maintenance & routine repair 44145615201- 860467 (0465-20) | DA | 1 | $150,000 | $136,000 | $45,000 | $440,000 |
| 0135 | Movable bridge operator (0465-21) | DA | 460 | $900.00 | $1,000.00 | $1,000.00 | $1,100.00 |
| 0140 | Movable bridge functional checkout, phase C 44145615201- 860467 (0465-71-3) | LS | 1 | $290,000 | $125,000 | $125,000 | $150,000 |
| 0145 | Polymeric fender system, kip-FT 44145615201- 860467 (0471-3-3) | LS | 1 | $2,700,000 | $4,800,000 | $3,850,000 | $5,000,000 |
| 0150 | Aluminum deck panels, furnish install (0505-2100) | SF | 10,222 | $300.00 | $280.00 | $323.00 | $350.00 |
| 0155 | Aluminum sidewalk floor (0507-70) | SF | 1,728 | $260.00 | $82.00 | $144.00 | $98.00 |
| 0160 | Movable bridge gate, F&I (0508-2-1) | AS | 6 | $70,000 | $97,083 | $135,000 | $106,000 |
| 0165 | Movable bridge gate, remove & dispose (0508-2-6) | AS | 4 | $850.00 | $3,250.00 | $7,500.00 | $4,025.00 |
| 0170 | Movable bridge - signal, adjust modify / rehab (0508-3-5) | AS | 1 | $15,000 | $20,000 | $29,500 | $23,000 |
| 0175 | Movable bridge electrical equipment, rehabilitation 44145615201- 860467 (0508-4) | LS | 1 | $2,192,450 | $4,601,300 | $5,000,000 | $5,100,000 |
| 0180 | Movable bridge emergency generator , furnish & install (0508-72-1) | AS | 1 | $200,000 | $353,750 | $450,000 | $413,000 |
| 0185 | Movable bridge emergency generator , remove (0508-72-4) | AS | 1 | $20,000 | $3,250.00 | $4,300.00 | $3,100.00 |
| 0190 | Submarine cable assembly, furnish & install 44145615201- 860467 (0508-73-1) | LF | 1 | $3,000,000 | $4,900,000 | $10,000,000 | $9,676,000 |
| 0195 | Submarine cable assembly, remove 44145615201- 860467 (0508-73-4) | LF | 1 | $72,000 | $100,000 | $65,000 | $60,000 |
| 0200 | Movable bridge - rehab, span motors & controllers , F&I 44145615201- 860467 (0508-76-1) | LS | 1 | $120,000 | $356,250 | $400,000 | $387,000 |
| 0205 | Movable bridge - rehab, span motors & controllers , F&I 44145615201-860466 (0508-76-1) | LS | 1 | $120,000 | $356,250 | $402,000 | $387,000 |
| 0210 | Movable bridge - rehab, span motors & controllers , 44145615201- 860467 (0508-76-4) | LS | 1 | $3,200.00 | $3,250.00 | $33,000 | $3,576.00 |
| 0215 | Movable bridge - rehab, span motors & controllers , 44145615201-860466 (0508-76-4) | LS | 1 | $3,200.00 | $3,250.00 | $33,000 | $3,100.00 |
| 0220 | Movable bridge- rehab,programmable logic controller F&I (0508-77-1) | EACH | 1 | $360,000 | $55,000 | $85,000 | $76,400 |
| 0225 | Movable bridge-rehab, limit switches & transducers F&I 44145615201- 860467 (0508-78-1) | LS | 1 | $70,600 | $61,250 | $85,000 | $74,000 |
| 0230 | Movable bridge-rehab, limit switches & transducers F&I 44145615201-860466 (0508-78-1) | LS | 1 | $70,600 | $61,250 | $85,000 | $75,000 |
| 0235 | Movable bridge-rehab, limit switches & transducers 44145615201- 860467 (0508-78-4) | LS | 1 | $7,500.00 | $16,250 | $20,500 | $18,600 |
| 0240 | Movable bridge-rehab, limit switches & transducers 44145615201-860466 (0508-78-4) | LS | 1 | $11,700 | $16,250 | $20,500 | $19,000 |
| 0245 | Movable bridge-rehab,control console, F&I (0508-79-1) | EACH | 1 | $875,000 | $313,750 | $330,000 | $330,000 |
| 0250 | Movable bridge-rehab,control console, remove (0508-79-4) | EACH | 1 | $2,800.00 | $5,000.00 | $4,500.00 | $4,800.00 |
| 0255 | Movable bridge-rehab, brake system, F&I (0508-80-1) | EACH | 16 | $38,000 | $27,688 | $45,000 | $43,000 |
| 0260 | Movable bridge-rehab, brake system, remove (0508-80-4) | EACH | 8 | $860.00 | $406.25 | $650.00 | $2,150.00 |
| 0265 | Movable bridge-rehab, control panel - motor controller, replace (0508-82-5) | EACH | 1 | $185,000 | $313,750 | $325,000 | $331,500 |
| 0270 | Movable bridge integrated system, replace, 26-40 KW (0508-83202) | EACH | 8 | $82,000 | $70,417 | $95,000 | $104,000 |
| 0275 | Movable bridge-control house, renovate 44145615201- 860467 (0512-1-1) | LS | 1 | $250,000 | $350,000 | $725,000 | $483,000 |
| 0280 | Pipe handrail - guiderail, relocate, aluminum (0515-1-42) | LF | 42 | $320.00 | $150.00 | $35.00 | $115.00 |
| 0285 | Pedestrian / bicycle railing, steel, custom infill panels (0515-2710) | LF | 2,131 | $326.00 | $167.00 | $685.00 | $85.00 |
| 0290 | Bullet rail, double rail (0515-4-2) | LF | 539 | $105.00 | $200.00 | $250.00 | $60.00 |
| 0295 | Concrete traffic railing- 32" vertical face (0521-5-4) | LF | 40 | $200.00 | $600.00 | $450.00 | $930.00 |
| 0300 | Concrete parapet, retaining wall system mounted W/sidewalk, 27" height (0521-6-31) | LF | 499 | $645.00 | $180.00 | $500.00 | $655.00 |
| 0305 | Riprap, sand-cement bags (0530-1100) | CY | 50.80 | $850.00 | $1,200.00 | $1,950.00 | $1,168.00 |
| 0310 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 1,419.60 | $140.00 | $550.00 | $395.00 | $385.00 |
| 0315 | Articulating concrete block revetment system, thickness 4" (0530-4-4) | SY | 4,638 | $220.00 | $325.00 | $195.00 | $222.00 |
| 0320 | Bedding stone (0530-74) | TN | 330.40 | $140.00 | $550.00 | $325.00 | $315.00 |
| 0325 | Retaining wall system, permanent, excluding barrier (0548-12) | SF | 9,629 | $118.00 | $150.00 | $115.00 | $75.00 |
| 0330 | Fencing, type B, 8.1-10.0', features (0550-10250) | LF | 250 | $62.00 | $100.00 | $150.00 | $35.00 |
| 0335 | Fence gate, type B, single, 0- 6.0' opening (0550-60211) | EACH | 2 | $2,100.00 | $2,500.00 | $3,000.00 | $2,300.00 |
| 0340 | Coating existing structural steel 44145615201- 860467 (0561-1) | TN | 1 | $1,100,000 | $1,100,000 | $1,750,000 | $1,430,000 |
| 0345 | Coating existing structural steel 44145615201-860466 (0561-1) | TN | 1 | $1,100,000 | $1,100,000 | $1,750,000 | $1,430,000 |
| 0350 | Mobilization (0101-1) | LS | 1 | $3,500,000 | $1,575,000 | $3,000,000 | $3,500,000 |
| 0355 | Mobilization (0101-1) | LS | 1 | $745,931 | $950,000 | $3,000,000 | $8,550,000 |
| 0360 | Maintenance of traffic (0102-1) | DA | 1 | $250,000 | $931,250 | $850,000 | $200,000 |
| 0365 | Maintenance of traffic (0102-1) | DA | 1 | $150,000 | $250,000 | $850,000 | $200,000 |
| 0370 | Special detour- temporary pavement (0102-2200) | SY | 1 | $50,000 | $118,649 | $135,000 | $105,000 |
| 0375 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $50,000 | $53,906 | $65,000 | $191,000 |
| 0380 | Traffic control officer (0102-14) | HR | 208 | $82.00 | $92.00 | $100.00 | $160.00 |
| 0385 | Work zone sign (0102-60) | ED | 44,160 | $0.24 | $0.28 | $0.30 | $0.25 |
| 0390 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 234 | $42.00 | $57.96 | $75.00 | $145.00 |
| 0395 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 135 | $25.00 | $34.50 | $54.00 | $55.00 |
| 0400 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 100,126 | $0.11 | $0.16 | $0.15 | $0.11 |
| 0405 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 4,248 | $0.08 | $0.11 | $0.15 | $1.00 |
| 0410 | Temporary separator, F&I remove (0102-75-1) | LF | 415 | $19.00 | $26.22 | $28.00 | $55.00 |
| 0415 | Arrow board / advance warning arrow panel (0102-76) | ED | 2,235 | $5.20 | $7.00 | $7.00 | $6.00 |
| 0420 | Temporary crash cushion, redirective option (0102-89-1) | LO | 3 | $915.00 | $1,262.70 | $1,250.00 | $7,000.00 |
| 0425 | Portable changeable message sign, temporary (0102-99) | ED | 2,613 | $9.15 | $12.62 | $11.50 | $25.00 |
| 0430 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,300 | $9.33 | $12.88 | $16.00 | $31.00 |
| 0435 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,300 | $9.33 | $12.88 | $16.00 | $31.00 |
| 0440 | Existing ITS maintenance (0102-112) | DA | 460 | $152.59 | $210.58 | $225.00 | $180.00 |
| 0445 | Type III barricade (0102-115) | ED | 1,990 | $0.32 | $0.46 | $0.40 | $1.00 |
| 0450 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.83 | $10,024 | $11,040 | $15,000 | $10,000 |
| 0455 | Removable tape, white, symbol or arrow (0102-913-29) | EACH | 12 | $350.00 | $503.13 | $500.00 | $350.00 |
| 0460 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.41 | $9,903.38 | $11,040 | $15,000 | $10,000 |
| 0465 | Sediment barrier (0104-10-3) | LF | 871 | $4.00 | $5.39 | $6.00 | $10.00 |
| 0470 | Inlet protection system (0104-18) | EACH | 21 | $150.00 | $237.19 | $225.00 | $550.00 |
| 0475 | Litter removal (0107-1) | ACRE | 64.75 | $80.00 | $1.44 | $650.00 | $350.00 |
| 0480 | Mowing (0107-2) | ACRE | 29.18 | $100.00 | $1.44 | $650.00 | $650.00 |
| 0485 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $18,500 | $15,000 | $20,000 | $22,000 |
| 0490 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $50,000 | $15,000 | $350,000 | $185,000 |
| 0495 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $450,000 | $6,871.25 | $9,500.00 | $330,000 |
| 0500 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $150,000 | $6,871.25 | $9,500.00 | $6,948,150 |
| 0505 | Removal of existing concrete (0110-4-10) | SY | 1,110 | $45.00 | $37.38 | $35.00 | $100.00 |
| 0510 | Regular excavation (0120-1) | CY | 11,158 | $40.00 | $64.00 | $35.00 | $14.50 |
| 0515 | Embankment (0120-6) | CY | 11,158 | $52.00 | $45.00 | $35.00 | $54.00 |
| 0520 | Type B stabilization (0160-4) | SY | 1,394 | $40.00 | $9.66 | $11.00 | $25.00 |
| 0525 | Optional base, base group 09 (0285-709) | SY | 1,394 | $60.00 | $95.81 | $87.00 | $40.00 |
| 0530 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 33,637 | $8.00 | $5.19 | $6.00 | $6.00 |
| 0535 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 2,031 | $7.00 | $5.34 | $6.00 | $5.00 |
| 0540 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 245 | $7.50 | $36.26 | $40.00 | $7.00 |
| 0545 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 2,508 | $185.00 | $248.00 | $245.00 | $240.00 |
| 0550 | Asphalt concrete friction course,traffic B, FC-9.5, PG 76-22 (0337-7-80) | TN | 2,577 | $250.00 | $56.66 | $300.00 | $300.00 |
| 0555 | Miscellaneous asphalt (0339-1) | TN | 7.80 | $350.00 | $1,178.41 | $1,250.00 | $530.00 |
| 0560 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $9,445.00 | $20,128 | $20,000 | $20,000 |
| 0565 | Manhole, adjust (0425-5) | EACH | 12 | $880.00 | $1,221.88 | $1,250.00 | $513.00 |
| 0570 | Grate for existing drainage structure, furnish and install (0425-14-1) | SF | 14 | $350.00 | $205.56 | $250.00 | $220.00 |
| 0575 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 5 | $992.00 | $1,045.31 | $1,500.00 | $5,900.00 |
| 0580 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,552 | $52.00 | $76.19 | $81.00 | $70.00 |
| 0585 | Concrete curb, type D (0520-2-4) | LF | 120 | $67.00 | $56.06 | $65.00 | $67.00 |
| 0590 | Concrete traffic railing barrier, with junction slab, 32" vertical face (0521-8-3) | LF | 248 | $700.00 | $682.81 | $750.00 | $950.00 |
| 0595 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 617 | $88.75 | $98.80 | $95.00 | $92.00 |
| 0600 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 371 | $126.00 | $172.50 | $165.00 | $135.00 |
| 0605 | Detectable warnings (0527-2) | SF | 379 | $55.00 | $48.88 | $50.00 | $62.00 |
| 0610 | Guardrail -roadway, general (0536-1-1) | LF | 269 | $28.50 | $40.98 | $48.00 | $35.00 |
| 0615 | Guardrail removal (0536-73) | LF | 262 | $2.00 | $276.00 | $15.00 | $12.00 |
| 0620 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $3,450.00 | $4,959.38 | $4,800.00 | $4,000.00 |
| 0625 | Performance turf, sod (0570-1-2) | SY | 845 | $8.00 | $21.56 | $25.00 | $30.00 |
| 0630 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 535 | $51.00 | $73.15 | $78.00 | $37.70 |
| 0635 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,722.00 | $2,475.00 | $2,500.00 | $1,263.50 |
| 0640 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $2,763.00 | $3,968.75 | $4,500.00 | $2,696.50 |
| 0645 | Traffic monitoring site inductive loop assembly, & install, 1 loop (0695-6-11) | EACH | 12 | $2,124.00 | $3,053.75 | $3,500.00 | $2,091.90 |
| 0650 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 1 | $8,158.00 | $11,258 | $12,500 | $7,028.40 |
| 0655 | Raised pavement marker, type B (0706-1-3) | EACH | 4,186 | $3.85 | $5.00 | $7.00 | $3.85 |
| 0660 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.88 | $1,848.00 | $2,156.25 | $2,000.00 | $1,850.00 |
| 0665 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 122 | $2.00 | $2.88 | $7.00 | $2.00 |
| 0670 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.95 | $698.00 | $1,150.00 | $1,250.00 | $700.00 |
| 0675 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 142 | $40.00 | $115.00 | $100.00 | $40.00 |
| 0680 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.06 | $35.00 | $2,156.25 | $2,000.00 | $35.00 |
| 0685 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.21 | $713.00 | $1,150.00 | $1,500.00 | $700.00 |
| 0690 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0695 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 16 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0700 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0705 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $139,095 | $139,095 | $139,095 | $139,095 |
| 0710 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $7,065.00 | $7,065.00 | $7,065.00 | $7,065.00 |
| 0715 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 19 | $650.00 | $57.50 | $850.00 | $650.00 |
| 0720 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $2,750.00 | $2,156.25 | $3,500.00 | $2,750.00 |
| 0725 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $3,475.00 | $3,593.75 | $4,500.00 | $3,475.00 |
| 0730 | Single column ground sign assembly, remove (0700-1600) | EACH | 16 | $65.00 | $57.50 | $85.00 | $65.00 |
| 0735 | Sign panel, install, UP to 12 SF (0700-3401) | EACH | 4 | $250.00 | $71.88 | $400.00 | $250.00 |
| 0740 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 4 | $75.00 | $71.88 | $95.00 | $75.00 |
| 0745 | Tubular marker, 36" yellow (0704-1-4) | EACH | 1 | $200.00 | $287.50 | $285.00 | $200.00 |
| 0750 | Raised pavement marker, type B (0706-1-3) | EACH | 763 | $3.85 | $7.19 | $8.00 | $3.85 |
| 0755 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 80 | $5.00 | $14.38 | $12.00 | $5.00 |
| 0760 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,085.00 | $14,375 | $12,000 | $7,085.00 |
| 0765 | Painted pavement markings, surface (0710-90) | LS | 1 | $16,533 | $21,563 | $26,000 | $16,533 |
| 0770 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 2,390 | $3.35 | $4.31 | $6.00 | $3.35 |
| 0775 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 287 | $5.03 | $50.25 | $8.00 | $5.03 |
| 0780 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 659 | $6.70 | $5.75 | $9.00 | $6.70 |
| 0785 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.58 | $3,367.00 | $3,593.75 | $6,500.00 | $3,391.00 |
| 0790 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 30 | $77.00 | $215.00 | $250.00 | $77.00 |
| 0795 | Thermoplastic, standard, arrow (0711-11170) | EACH | 40 | $55.00 | $115.00 | $95.00 | $55.00 |
| 0800 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 62 | $4.71 | $3,806.25 | $7.00 | $4.71 |
| 0805 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.11 | $3,453.80 | $3,593.75 | $6,500.00 | $3,391.00 |
| 0810 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,429 | $16.80 | $24.44 | $22.00 | $16.80 |
| 0815 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 26 | $212.00 | $431.25 | $350.00 | $212.00 |
| 0820 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 26 | $90.00 | $143.75 | $200.00 | $90.00 |
| 0825 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.38 | $4,900.00 | $7,187.50 | $6,850.00 | $4,889.00 |
| 0830 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.16 | $6,687.00 | $8,625.00 | $7,500.00 | $6,520.00 |
| 0835 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.96 | $1,222.00 | $3,593.75 | $4,800.00 | $1,223.00 |
| 0840 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.19 | $4,574.00 | $7,187.50 | $7,500.00 | $4,582.00 |
| 0845 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.30 | $43,150 | $2,156.25 | $50,000 | $43,894 |
| 0850 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.28 | $11,174 | $14,375 | $18,500 | $10,974 |
| 0855 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.14 | $43,583 | $21,563 | $48,500 | $43,894 |
| 0860 | Green-colored pavement markings, bike lane (0714-10) | SF | 1,784 | $9.00 | $12.94 | $14.00 | $9.00 |
| 0865 | Conduit, furnish & install, open trench (0630-2-11) | LF | 16 | $21.60 | $31.15 | $32.00 | $35.10 |
| 0870 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 320 | $46.00 | $65.95 | $68.00 | $35.10 |
| 0875 | Conduit, furnish & install, mount (0630-2-15) | LF | 305 | $54.00 | $77.90 | $80.00 | $42.90 |
| 0880 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $1,722.00 | $2,475.00 | $2,535.00 | $1,263.50 |
| 0885 | Pull & splice box, install (0635-2-30) | EACH | 6 | $1,236.50 | $1,777.50 | $1,820.00 | $655.50 |
| 0890 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,494.00 | $9,000.00 | $9,590.00 | $5,785.10 |
| 0895 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $4,066.00 | $5,640.00 | $5,987.00 | $2,721.40 |
| 0900 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,171 | $3.67 | $5.31 | $5.40 | $2.90 |
| 0905 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 41 | $7.00 | $10.00 | $11.00 | $4.20 |
| 0910 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 759 | $0.58 | $0.84 | $1.00 | $0.10 |
| 0915 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $16,349 | $22,560 | $24,064 | $12,960 |
| 0920 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $1,166.35 | $1,681.25 | $1,717.00 | $743.20 |
| 0925 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 5 | $2,101.40 | $3,018.75 | $3,093.00 | $1,352.50 |
| 0930 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pendant/teardrop (0715-11216) | EACH | 7 | $3,604.00 | $5,181.25 | $5,304.00 | $2,640.70 |
| 0935 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 8' arm length (0715-61411) | EACH | 3 | $14,619 | $21,000 | $21,518 | $9,014.10 |
| 0940 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 2 | $993.00 | $1,200.00 | $1,376.00 | $557.40 |
| 0945 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 3 | $1,175.00 | $1,687.50 | $1,730.00 | $681.50 |
| 0950 | Light pole complete- special design, relocate (0715-540000) | EACH | 3 | $5,902.00 | $1,687.50 | $8,689.00 | $2,084.10 |
| 0955 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.47 | $4,176.00 | $5,951.25 | $6,095.00 | $3,538.50 |
| 0960 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $3,254.40 | $4,678.13 | $4,791.00 | $2,805.20 |
| 0965 | Conduit, furnish & install, open trench (0630-2-11) | LF | 358 | $21.60 | $30.99 | $32.00 | $37.70 |
| 0970 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,498 | $48.00 | $68.83 | $71.00 | $40.30 |
| 0975 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $9,976.00 | $14,338 | $14,685 | $14,268 |
| 0980 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $1,866.00 | $2,623.00 | $2,745.00 | $743.20 |
| 0985 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 4 | $120.50 | $173.13 | $178.00 | $103.90 |
| 0990 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 1 | $2,801.00 | $4,025.00 | $4,122.00 | $2,414.00 |
| 0995 | Fiber optic cable locator (0633-6) | DA | 460 | $397.80 | $549.00 | $587.00 | $397.30 |
| 1000 | Multi-conductor cable, install (0633-8-3) | LF | 160 | $16.00 | $23.03 | $23.58 | $6.80 |
| 1005 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 64 | $1,722.00 | $23.76 | $2,534.87 | $1,263.50 |
| 1010 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $6,494.00 | $9,000.00 | $9,559.01 | $5,785.10 |
| 1015 | Electrical service wire, & install (0639-2-1) | LF | 746 | $11.00 | $15.19 | $16.20 | $10.70 |
| 1020 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $4,293.00 | $6,171.25 | $6,320.50 | $2,467.20 |
| 1025 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $4,066.00 | $5,610.00 | $5,985.47 | $2,721.40 |
| 1030 | Aluminum signals pole, (0646-1-11) | EACH | 20 | $2,600.00 | $3,750.00 | $3,827.19 | $2,081.90 |
| 1035 | Aluminum signals pole, remove (0646-1-60) | EACH | 9 | $699.80 | $966.00 | $1,030.11 | $557.40 |
| 1040 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 4 | $99,248 | $139,245 | $146,094 | $71,399 |
| 1045 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $5,978.00 | $8,280.00 | $8,799.23 | $3,344.20 |
| 1050 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 10 | $1,760.00 | $2,500.00 | $2,589.36 | $1,268.80 |
| 1055 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 1 | $2,086.00 | $2,928.00 | $3,069.54 | $1,663.50 |
| 1060 | Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19) | AS | 2 | $2,703.00 | $3,813.00 | $3,978.29 | $2,187.70 |
| 1065 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 20 | $1,051.00 | $1,500.00 | $1,546.61 | $682.60 |
| 1070 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 3 | $467.00 | $653.92 | $686.73 | $92.90 |
| 1075 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $5,488.00 | $2,698.20 | $8,077.54 | $3,221.10 |
| 1080 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $12,106 | $16,984 | $17,820 | $9,047.40 |
| 1085 | Vehicle detection system- relocate above ground equipment (0660-4-42) | EACH | 2 | $2,479.00 | $3,505.50 | $3,648.69 | $786.30 |
| 1090 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 20 | $2,172.00 | $3,075.00 | $3,196.90 | $1,627.30 |
| 1095 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 1 | $49,051 | $66,912 | $72,204 | $41,604 |
| 1100 | Traffic controller, modify (0671-2-40) | EACH | 1 | $3,179.00 | $4,459.10 | $4,678.80 | $10,281 |
| 1105 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 2 | $3,179.00 | $4,495.65 | $4,678.80 | $6,613.80 |
| 1110 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $9,622.00 | $13,610 | $14,163 | $8,293.20 |
| 1115 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 2 | $13,958 | $19,260 | $20,545 | $15,615 |
| 1120 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $1,072.00 | $1,478.40 | $1,577.89 | $994.10 |
| 1125 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 5 | $1,109.00 | $1,530.00 | $1,632.26 | $994.20 |
| 1130 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 2 | $4,257.00 | $5,978.00 | $6,266.39 | $2,793.70 |
| 1135 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 2 | $4,479.00 | $6,283.00 | $6,593.00 | $3,063.10 |
| 1140 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $3,840.00 | $3,840.00 | $3,840.00 | $3,840.00 |
| 1145 | Landscape- palms, cocos nucifera 'maypan' 13-16' grey wood (0580-4534) | EACH | 10 | $5,000.00 | $7,072.50 | $6,850.00 | $5,000.00 |
| 1150 | Landscape- small shrub/ornamental grass, buttonwood conocarpus erectus var. sericeus, 3 gallon (0580-7153) | EACH | 93 | $75.00 | $103.50 | $115.00 | $75.00 |
| 1155 | Relocate trees and <14' of clear trunk, sabal palm only (0581-1-7) | EACH | 1 | $1,000.00 | $1,380.00 | $1,650.00 | $1,000.00 |
| 1160 | Relocate trees and palms, palms, <10.0" DBH, <14.0' of clear trunk (0581-1271) | EACH | 6 | $4,000.00 | $5,520.00 | $7,850.00 | $4,000.00 |
| 1165 | Irrigation system (0590-70) | LS | 1 | $24,590 | $34,782 | $39,500 | $24,590 |
| 1170 | Irrigation sleeve, 2" diameter (0591-1200) | LF | 20 | $25.00 | $70.73 | $70.00 | $22.00 |
| 1175 | Irrigation sleeve, 4" diameter (0591-1400) | LF | 97 | $25.00 | $117.30 | $115.00 | $24.00 |
| 1180 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.33 | $5,727.00 | $8,149.98 | $8,614.40 | $3,538.50 |
| 1185 | Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124) | LF | 1,304 | $8.44 | $11.65 | $12.62 | $7.30 |
| 1190 | Fiber optic cable, remove, underground (0633-1620) | LF | 735 | $2.84 | $4.02 | $4.25 | $2.50 |
| 1195 | Fiber optic connection, install, splice (0633-2-31) | EACH | 288 | $63.80 | $90.41 | $95.39 | $55.10 |
| 1200 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 2 | $1,964.00 | $2,767.50 | $2,936.15 | $1,692.90 |
| 1205 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 24 | $70.90 | $100.25 | $106.00 | $61.20 |
| 1210 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 2 | $5,858.55 | $8,084.40 | $8,758.53 | $6,173.80 |
| 1215 | Electrical power service, adjust/modify (0639-1500) | AS | 1 | $1,004.00 | $1,380.00 | $1,499.88 | $2,140.30 |
| 1220 | Electrical service wire, (0639-2-6) | LF | 1,572 | $0.50 | $0.66 | $0.70 | $0.10 |
| 1225 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 2 | $699.80 | $486.00 | $1,046.20 | $557.40 |
| 1230 | Vehicle detection system- avi, adjust/modify, bluetooth, ground equipment (0660-6522) | EACH | 3 | $816.00 | $1,143.14 | $1,218.98 | $931.70 |
| 1235 | Traffic data detection system- microwave, adjust/modify, cabinet equipment (0660-8-51) | EACH | 1 | $2,160.00 | $3,050.00 | $3,226.59 | $348.00 |
| 1240 | ITS cabinet- adjust/modify (0676-2500) | EACH | 7 | $3,180.00 | $4,459.10 | $4,751.90 | $354.50 |
| 1245 | ITS CCTV camera, adjust/modify (0682-1500) | EACH | 6 | $1,772.55 | $2,415.60 | $2,575.21 | $1,854.90 |
| 1250 | Managed field ethernet switch, adjust / modify (0684-1-5) | EACH | 7 | $532.00 | $752.17 | $794.98 | $589.20 |
| 1255 | Wireless communication device, remove (0684-6-60) | EACH | 2 | $532.00 | $75,196 | $794.98 | $458.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.