FDOT contract T3970 bid tabulation
HANNA MILL POND RD OVER HANNA POND BRIDGE NO 504043. Let by Florida DOT on October 28, 2026, Gadsden, District 3. 5 bids received; low bid $5,235,655 by RBM Contracting Services, LLC.
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 77
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | RBM Contracting Services, LLC | $5,235,655 | Low |
| 2 | Superior Construction Company Southeast, LLC | $5,266,922 | +1.0% |
| 3 | F & W Construction Company, Inc. | $5,870,273 | +12% |
| 4 | Murphree Bridge Corporation | $5,907,877 | +13% |
| 5 | Anderson Columbia Co., Inc. | $6,040,768 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. RBM Contracting Services, LLC | 2. Superior Construction Company Southeast, LLC | 3. F & W Construction Company, Inc. | 4. Murphree Bridge Corporation | 5. Anderson Columbia Co., Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $200,000 | $300,000 | $660,000 | $255,000 | $201,500 |
| 0010 | Concrete, class I (seal) (0400-1-30) | CY | 65.40 | $350.00 | $710.00 | $1,500.00 | $1,550.00 | $650.00 |
| 0015 | Conc class II, bridge superstructure (0400-2-4) | CY | 92.80 | $1,500.00 | $2,370.00 | $1,800.00 | $2,540.00 | $1,900.00 |
| 0020 | Concrete class II, approach slabs (0400-2-10) | CY | 43.70 | $970.00 | $870.00 | $1,200.00 | $1,000.00 | $1,300.00 |
| 0025 | Concrete class IV, bridge substructure (0400-4-5) | CY | 72.80 | $3,650.00 | $4,305.00 | $1,500.00 | $4,640.00 | $4,500.00 |
| 0030 | Conc class IV, bulkhead (0400-4-8) | CY | 158.80 | $2,235.00 | $1,525.00 | $1,600.00 | $1,758.77 | $1,300.00 |
| 0035 | Bridge deck grooving (0400-7-1) | SY | 192 | $22.00 | $36.00 | $52.00 | $25.00 | $65.00 |
| 0040 | Plain neoprene bearing pads (0400-148) | CF | 2.60 | $3,000.00 | $3,670.00 | $3,000.00 | $1,600.00 | $4,500.00 |
| 0045 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 27,719 | $2.70 | $1.50 | $2.00 | $2.00 | $2.00 |
| 0050 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 23,906 | $2.70 | $1.50 | $2.00 | $2.00 | $4.50 |
| 0055 | Reinforcing steel- bulkhead (0415-1-8) | LB | 7,233 | $3.50 | $3.75 | $2.00 | $2.00 | $4.00 |
| 0060 | Reinforcing steel- approach slabs (0415-1-9) | LB | 8,580 | $3.50 | $1.50 | $2.00 | $2.00 | $3.00 |
| 0065 | Pile inspection, driven pile (0455-20-1) | EACH | 16 | $910.00 | $525.00 | $5,000.00 | $750.00 | $1,250.00 |
| 0070 | Prestressed concrete piling, SQ (0455-34-3) | LF | 684 | $155.00 | $220.00 | $85.00 | $220.00 | $235.00 |
| 0075 | Pile redrive (0455-115) | EACH | 16 | $2,100.00 | $860.00 | $2,000.00 | $250.00 | $1,200.00 |
| 0080 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 14,937 | $42.38 | $22.00 | $60.00 | $65.00 | $77.00 |
| 0082 | Steel sheetpiling, temporary, non-critical cantilever (0455-133326) | SF | 1 | $35,000 | $505,000 | $600,000 | $723,000 | $199,500 |
| 0085 | Sheet piling steel, F&I (0455-133-3) | SF | 9,642 | $99.85 | $60.00 | $75.00 | $70.00 | $89.00 |
| 0090 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 12 | $730.00 | $1,150.00 | $5,000.00 | $4,500.00 | $2,500.00 |
| 0095 | Test piles-prestressed concrete,18" SQ (0455-143-3) | LF | 217 | $180.00 | $575.00 | $200.00 | $270.00 | $335.00 |
| 0100 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 56 | $80.00 | $45.00 | $60.00 | $85.00 | $100.00 |
| 0105 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 246 | $315.00 | $150.00 | $250.00 | $275.00 | $175.00 |
| 0110 | Riprap- rubble, bank and shore (0530-3-3) | TN | 427.30 | $98.00 | $125.80 | $135.00 | $130.00 | $170.00 |
| 0115 | Bedding stone (0530-74) | TN | 159.10 | $101.00 | $151.99 | $125.00 | $140.00 | $190.00 |
| 0120 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 738 | $26.00 | $15.00 | $5.00 | $18.00 | $30.00 |
| 0125 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 4 | $1,550.00 | $1,800.00 | $125.00 | $315.00 | $1,000.00 |
| 0130 | Mobilization (0101-1) | LS | 1 | $500,000 | $542,553 | $500,000 | $544,843 | $589,000 |
| 0135 | Maintenance of traffic (0102-1) | DA | 1 | $100,000 | $42,000 | $25,000 | $104,000 | $30,000 |
| 0140 | Work zone sign (0102-60) | ED | 10,368 | $0.30 | $0.30 | $0.35 | $0.30 | $0.35 |
| 0145 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 6,480 | $0.15 | $0.12 | $0.15 | $0.12 | $0.20 |
| 0150 | Portable changeable message sign, temporary (0102-99) | ED | 1,620 | $20.00 | $15.50 | $18.00 | $15.50 | $18.00 |
| 0155 | Type III barricade (0102-115) | ED | 1,240 | $0.61 | $0.35 | $0.40 | $0.35 | $0.45 |
| 0160 | Sediment barrier (0104-10-3) | LF | 1,019 | $4.80 | $10.00 | $5.50 | $4.00 | $7.00 |
| 0165 | Floating turbidity barrier (0104-11) | LF | 634 | $38.00 | $30.00 | $19.00 | $17.86 | $30.00 |
| 0170 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 295 | $78.00 | $20.00 | $25.00 | $8.77 | $25.00 |
| 0175 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $50,000 | $535,225 | $60,000 | $22,000 | $85,000 |
| 0180 | Regular excavation (0120-1) | CY | 1,124.80 | $18.00 | $5.75 | $20.00 | $17.22 | $42.00 |
| 0185 | Subsoil excavation (0120-4) | CY | 1,489.60 | $75.00 | $11.75 | $20.00 | $22.22 | $38.00 |
| 0190 | Embankment (0120-6) | CY | 1,707.70 | $39.00 | $19.50 | $42.00 | $34.15 | $60.00 |
| 0195 | Type B stabilization (0160-4) | SY | 1,541 | $12.00 | $10.50 | $23.00 | $12.00 | $33.00 |
| 0200 | Optional base, base group 01 (0285-701) | SY | 133 | $47.00 | $12.50 | $27.00 | $30.00 | $38.00 |
| 0205 | Optional base, base group 06 (0285-706) | SY | 1,203 | $33.00 | $25.00 | $31.00 | $25.00 | $41.00 |
| 0210 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 89.50 | $192.00 | $230.00 | $245.00 | $290.00 | $285.00 |
| 0215 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 108.20 | $215.00 | $260.00 | $245.00 | $290.00 | $300.00 |
| 0220 | Miscellaneous asphalt (0339-1) | TN | 34.60 | $384.00 | $255.00 | $410.00 | $420.00 | $325.00 |
| 0225 | Concrete, class I (seal) (0400-1-30) | CY | 25.20 | $305.00 | $810.00 | $2,500.00 | $1,550.00 | $650.00 |
| 0230 | Concrete class IV, culverts (0400-4-1) | CY | 119 | $2,150.00 | $2,800.00 | $2,400.00 | $2,286.64 | $3,085.00 |
| 0235 | Reinforcing steel- roadway (0415-1-1) | LB | 19,200 | $3.70 | $1.50 | $3.25 | $1.20 | $2.45 |
| 0240 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 4 | $6,500.00 | $6,305.00 | $4,700.00 | $8,221.88 | $7,250.00 |
| 0245 | Inlets, barrier wall, rigid, curb & gutter, <=10' (0425-1881) | EACH | 4 | $8,122.00 | $7,140.00 | $6,300.00 | $7,236.88 | $9,400.00 |
| 0250 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 145 | $150.00 | $158.00 | $130.00 | $167.40 | $240.00 |
| 0255 | U-endwall with baffles, index 261/430-011, 1:3 slope, 18"pipe (0430-611225) | EACH | 2 | $6,500.00 | $6,065.00 | $5,700.00 | $7,373.88 | $7,500.00 |
| 0260 | U-endwall with baffles, index 261/430-011, 1:2 slope, 18"pipe (0430-611325) | EACH | 2 | $6,500.00 | $6,170.00 | $6,300.00 | $7,009.50 | $7,500.00 |
| 0265 | Shoulder gutter- concrete (0520-6) | LF | 381 | $610.00 | $49.00 | $58.00 | $45.00 | $92.00 |
| 0270 | Concrete barrier, with slab, 36" single slope (0521-8-7) | LF | 46 | $385.00 | $365.00 | $600.00 | $566.80 | $1,025.00 |
| 0275 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 269 | $385.00 | $475.00 | $600.00 | $548.80 | $600.00 |
| 0280 | Shoulder concrete barrier, 38" trench footing section (0521-72-42) | LF | 20 | $385.00 | $660.00 | $1,800.00 | $685.80 | $1,100.00 |
| 0285 | Riprap- rubble, bank and shore (0530-3-3) | TN | 80.50 | $315.00 | $255.00 | $140.00 | $160.00 | $160.00 |
| 0290 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 6.40 | $150.00 | $230.00 | $315.00 | $160.00 | $500.00 |
| 0295 | Bedding stone (0530-74) | TN | 34.60 | $101.00 | $100.00 | $175.00 | $160.00 | $300.00 |
| 0300 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 696 | $38.50 | $22.00 | $24.00 | $22.00 | $25.00 |
| 0305 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 10 | $715.00 | $200.00 | $220.00 | $200.00 | $225.00 |
| 0310 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 2 | $4,565.00 | $3,000.00 | $3,100.00 | $3,000.00 | $3,350.00 |
| 0315 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 2 | $4,565.00 | $2,500.00 | $2,600.00 | $2,500.00 | $2,800.00 |
| 0320 | Guardrail removal (0536-73) | LF | 1,104 | $6.00 | $2.00 | $2.25 | $2.00 | $6.00 |
| 0325 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $3,200.00 | $2,000.00 | $2,100.00 | $2,000.00 | $2,250.00 |
| 0330 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $5,300.00 | $3,000.00 | $3,200.00 | $3,000.00 | $3,400.00 |
| 0335 | Performance turf, sod (0570-1-2) | SY | 1,267 | $4.80 | $15.00 | $8.00 | $5.00 | $7.00 |
| 0340 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 1,004 | $26.00 | $15.00 | $5.00 | $18.00 | $25.65 |
| 0345 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 3 | $770.00 | $500.00 | $515.00 | $500.00 | $600.00 |
| 0350 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $110.00 | $120.00 | $125.00 | $120.00 | $150.00 |
| 0355 | Single column ground sign assembly, remove (0700-1600) | EACH | 4 | $66.00 | $50.00 | $52.00 | $50.00 | $100.00 |
| 0360 | Raised pavement marker, type B (0706-1-3) | EACH | 28 | $15.00 | $6.00 | $6.50 | $6.00 | $7.00 |
| 0365 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.16 | $8,250.00 | $7,000.00 | $7,100.00 | $7,000.00 | $7,850.00 |
| 0370 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.16 | $8,250.00 | $7,000.00 | $7,100.00 | $7,000.00 | $7,850.00 |
| 0375 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.04 | $50,000 | $35,000 | $35,500 | $35,000 | $40,000 |
| 0380 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.04 | $50,000 | $35,000 | $35,500 | $35,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.