FDOT contract T3879 bid tabulation
HOWELL WILLIAMS RD OVER TEN MILE CREEK, BRIDGE NO 524150. Let by Florida DOT on April 30, 2025, Holmes, District 3. 3 bids received; low bid $2,250,788 by Murphree Bridge Corporation.
- Owner
- Florida DOT
- Letting
- 30 APR 2025
- Pay items
- 59
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Murphree Bridge Corporation | $2,250,788 | Low |
| 2 | F & W Construction Company, Inc. | $2,415,840 | +7.0% |
| 3 | RJ Gorman Contracting LLC | $2,650,523 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Murphree Bridge Corporation | 2. F & W Construction Company, Inc. | 3. RJ Gorman Contracting LLC |
|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $35,000 | $325,000 | $40,000 |
| 0010 | Conc class II, bridge superstructure (0400-2-4) | CY | 133.50 | $2,860.00 | $1,500.00 | $1,950.00 |
| 0015 | Concrete class II, bridge substructure (0400-2-5) | CY | 46.40 | $3,950.00 | $1,200.00 | $3,242.73 |
| 0020 | Concrete class II, approach slabs (0400-2-10) | CY | 41.80 | $1,535.00 | $1,000.00 | $1,200.00 |
| 0025 | Bridge deck grooving (0400-7-1) | SY | 251 | $10.00 | $35.00 | $209.33 |
| 0030 | Plain neoprene bearing pads (0400-148) | CF | 2.30 | $2,325.00 | $5,000.00 | $6,574.95 |
| 0035 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 44,738 | $1.95 | $2.50 | $2.50 |
| 0040 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 6,351 | $1.95 | $2.50 | $2.50 |
| 0045 | Reinforcing steel- approach slabs (0415-1-9) | LB | 7,983 | $1.95 | $2.50 | $2.50 |
| 0050 | Pile inspection, driven pile (0455-20-1) | EACH | 16 | $1,250.00 | $6,000.00 | $2,650.00 |
| 0055 | Steel piling, 24" dia. pipe (0455-35-22) | LF | 999 | $395.00 | $225.00 | $560.00 |
| 0060 | Pile redrive (0455-115) | EACH | 8 | $4,430.00 | $15,000 | $4,200.00 |
| 0065 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 16 | $4,000.00 | $10,000 | $3,950.00 |
| 0070 | Load test (dynamic), test (0455-137-2) | EACH | 1 | $4,000.00 | $15,000 | $5,800.00 |
| 0075 | Test piles - steel, 24" dia pipe (0455-144-22) | LF | 393 | $465.00 | $350.00 | $600.00 |
| 0080 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 51 | $106.00 | $125.00 | $180.00 |
| 0085 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 261 | $230.00 | $300.00 | $400.00 |
| 0090 | Riprap, sand-cement bags (0530-1100) | CY | 18 | $1,350.00 | $750.00 | $755.34 |
| 0095 | Riprap- rubble, bank and shore (0530-3-3) | TN | 509.50 | $120.00 | $90.00 | $190.00 |
| 0100 | Bedding stone (0530-74) | TN | 181.50 | $125.00 | $85.00 | $155.00 |
| 0105 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 782 | $18.00 | $25.00 | $30.00 |
| 0110 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 4 | $2,900.00 | $350.00 | $3,000.00 |
| 0115 | Mobilization (0101-1) | LS | 1 | $232,363 | $300,000 | $268,000 |
| 0120 | Maintenance of traffic (0102-1) | DA | 1 | $30,000 | $56,779 | $45,000 |
| 0125 | Work zone sign (0102-60) | ED | 6,510 | $0.33 | $0.33 | $0.55 |
| 0130 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 2,688 | $0.10 | $0.10 | $0.17 |
| 0135 | Portable changeable message sign, temporary (0102-99) | ED | 672 | $17.00 | $17.00 | $28.27 |
| 0140 | Type III barricade (0102-115) | ED | 840 | $0.33 | $0.33 | $0.55 |
| 0145 | Temporary slope drain / runoff control structure (0104-6) | LF | 70 | $167.00 | $143.27 | $84.49 |
| 0150 | Sediment barrier (0104-10-3) | LF | 719 | $5.00 | $5.25 | $16.25 |
| 0155 | Floating turbidity barrier (0104-11) | LF | 356 | $25.00 | $33.75 | $62.68 |
| 0160 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 184 | $14.62 | $18.89 | $76.24 |
| 0165 | Soil tracking prevention device (0104-15) | EACH | 1 | $2,570.00 | $4,485.00 | $6,000.00 |
| 0170 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $68,363 | $22,075 | $41,470 |
| 0175 | Regular excavation (0120-1) | CY | 1,919.10 | $8.00 | $15.97 | $17.02 |
| 0180 | Embankment (0120-6) | CY | 737.10 | $32.00 | $22.35 | $11.78 |
| 0185 | Type B stabilization (0160-4) | SY | 1,379 | $7.00 | $14.13 | $13.08 |
| 0190 | Optional base, base group 06 (0285-706) | SY | 901 | $22.00 | $27.84 | $31.12 |
| 0195 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 99.10 | $241.00 | $428.14 | $382.39 |
| 0200 | Miscellaneous asphalt (0339-1) | TN | 8.60 | $419.00 | $532.10 | $588.82 |
| 0205 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 32 | $202.00 | $254.00 | $493.31 |
| 0210 | Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224) | LF | 58 | $207.00 | $312.27 | $491.28 |
| 0215 | Shoulder gutter- concrete (0520-6) | LF | 249 | $60.00 | $68.54 | $77.65 |
| 0220 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 44 | $301.00 | $208.09 | $232.94 |
| 0225 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 235 | $22.00 | $20.00 | $25.88 |
| 0230 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 2 | $2,550.00 | $2,700.00 | $3,494.12 |
| 0235 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $3,250.00 | $5,400.00 | $3,494.12 |
| 0240 | Fence gate, type A, double, 6.1- 12.0' opening (0550-60122) | EACH | 1 | $6,500.00 | $8,238.35 | $5,500.00 |
| 0245 | Performance turf, sod (0570-1-2) | SY | 2,693 | $5.00 | $11.89 | $6.04 |
| 0250 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $500.00 | $500.00 | $647.06 |
| 0255 | Single column ground sign assembly, remove (0700-1600) | EACH | 1 | $50.00 | $50.00 | $275.00 |
| 0260 | Object marker, type 1 (0705-10-1) | EACH | 3 | $275.00 | $275.00 | $355.88 |
| 0265 | Raised pavement marker, type B (0706-1-3) | EACH | 20 | $15.00 | $5.00 | $8.41 |
| 0270 | Painted pavement markings, surface (0710-90) | LS | 1 | $1,500.00 | $2,500.00 | $6,875.00 |
| 0275 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 12 | $20.00 | $10.00 | $17.13 |
| 0280 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.12 | $10,500 | $15,000 | $25,948 |
| 0285 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.12 | $10,500 | $15,000 | $26,373 |
| 0290 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.03 | $35,000 | $45,000 | $70,974 |
| 0295 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.03 | $35,000 | $45,000 | $70,974 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.