Leware Construction Company of Florida, Inc.: FDOT bid record
Leware Construction Company of Florida, Inc. submitted 11 bids on Florida DOT contracts in the data, from 25 APR 2018 to 28 AUG 2024, and was the low bidder on 2 of them (18%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $6,765,000
- Latest bid
- 28 AUG 2024
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 1 | 33% |
| 2019 | 2 | 0 | 0% |
| 2020 | 1 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2024 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 5 | 1 | 20% |
| District 1 | 3 | 0 | 0% |
| District 5 | 2 | 1 | 50% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Floating turbidity barrier | 0104-11 | LF | 10 | 6 (60%) | $11.50 | $15.92 |
| Work zone sign | 0102-60 | ED | 10 | 5 (50%) | $0.25 | $0.25 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 6 | 5 (83%) | $1,525.00 | $1,350.00 |
| Sediment barrier | 0104-10-3 | LF | 10 | 4 (40%) | $3.50 | $2.60 |
| Guardrail removal | 0536-73 | LF | 7 | 4 (57%) | $3.00 | $3.00 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 5 | 4 (80%) | $1,700.00 | $1,350.00 |
| Temporary retroreflective pavement marker | 0102-78 | EACH | 5 | 4 (80%) | $6.00 | $3.50 |
| Junction box, furnish & install, embedded | 0635-3-13 | EACH | 5 | 4 (80%) | $350.00 | $822.50 |
| Plain neoprene bearing pads | 0400-148 | CF | 5 | 4 (80%) | $900.00 | $1,400.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 9 | 3 (33%) | $0.15 | $0.13 |
| Portable changeable message sign, temporary | 0102-99 | ED | 9 | 3 (33%) | $13.00 | $12.00 |
| Thermoplastic, standard-other surfaces, white, solid, 6" | 0711-16101 | GM | 9 | 3 (33%) | $6,250.00 | $5,220.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Superior Construction Company Southeast, LLC | 5 | 3 of 5 |
| Vecellio & Grogan, Inc. | 5 | 1 of 5 |
| Sema Construction, Inc. | 4 | 0 of 4 |
| Anderson Columbia Co., Inc. | 3 | 3 of 3 |
| GDB-US Constructors, Inc. | 3 | 2 of 3 |
| Southland Construction, Inc. | 3 | 0 of 3 |
| Commercial Industrial Corp. | 3 | 3 of 3 |
| Granite Construction Company of California | 3 | 0 of 3 |
| Gosalia Concrete Constructors, Inc. | 2 | 1 of 2 |
| Cone & Graham, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2024 | T1874 | District 1 | CR 664, BRIDGE NO 060034 OVER LITTLE PAYNE CREEK | 2 of 8 | $3,098,000 | +12% |
| 28 AUG 2024 | T5830 | District 5 | SR 5 NB (US 1) OVER TURNBULL CREEK, BRIDGE NO 790255 | 2 of 8 | $6,927,000 | +24% |
| 24 APR 2024 | T1850 | District 1 | CR 664 (COUNTYLINE RD) OVER PEACE RIVER, BRIDGE NO 160101 | 2 of 8 | $5,393,000 | +2.0% |
| 06 DEC 2023 | T2961 | District 2 | CLET HARVEY RD, OVER MUD LAKE SWAMP, BRIDGE NO 274091 | 1 of 2 | $3,521,000 | Low, 19% under the second |
| 28 APR 2021 | T2805 | District 2 | DRAYTON ISLAND RD | 4 of 4 | $6,309,000 | +56% |
| 25 MAR 2020 | T2773 | District 2 | SR 200 (US 301) | 5 of 6 | $4,987,000 | +35% |
| 28 AUG 2019 | T1750 | District 1 | SR 60 (HURRICANE IRMA) | 5 of 5 | $3,688,000 | +38% |
| 24 APR 2019 | T2739 | District 2 | C ST | 4 of 4 | $10,797,000 | +60% |
| 31 OCT 2018 | T5637 | District 5 | SR 33 | 1 of 5 | $3,244,000 | Low, 6.0% under the second |
| 25 JUL 2018 | T3622 | District 3 | CR 375 | 3 of 5 | $2,827,000 | +21% |
| 25 APR 2018 | T2700 | District 2 | HOWELL DR | 2 of 2 | $14,777,000 | +24% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.