Leware Construction Company of Florida, Inc.: FDOT bid record

Leware Construction Company of Florida, Inc. submitted 11 bids on Florida DOT contracts in the data, from 25 APR 2018 to 28 AUG 2024, and was the low bidder on 2 of them (18%). When it was not low, its total sat a median +24% above the low bid.

Owner
Florida DOT
Low bid volume
$6,765,000
Latest bid
28 AUG 2024
Data through
28 OCT 2026
11Bids
2Low bids
18Win rate, percent
+24%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
20183133%
2019200%
2020100%
2021100%
202311100%
2024300%
Leware Construction Company of Florida, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 25120%
District 1300%
District 52150%
District 3100%
Leware Construction Company of Florida, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Floating turbidity barrier0104-11LF106 (60%)$11.50$15.92
Work zone sign0102-60ED105 (50%)$0.25$0.25
Painted pavement markings, standard, white, solid, 6"0710-11101GM65 (83%)$1,525.00$1,350.00
Sediment barrier0104-10-3LF104 (40%)$3.50$2.60
Guardrail removal0536-73LF74 (57%)$3.00$3.00
Painted pavement markings, standard, yellow, solid, 6"0710-11201GM54 (80%)$1,700.00$1,350.00
Temporary retroreflective pavement marker0102-78EACH54 (80%)$6.00$3.50
Junction box, furnish & install, embedded0635-3-13EACH54 (80%)$350.00$822.50
Plain neoprene bearing pads0400-148CF54 (80%)$900.00$1,400.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED93 (33%)$0.15$0.13
Portable changeable message sign, temporary0102-99ED93 (33%)$13.00$12.00
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM93 (33%)$6,250.00$5,220.00
Leware Construction Company of Florida, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Leware Construction Company of Florida, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 AUG 2024T1874District 1CR 664, BRIDGE NO 060034 OVER LITTLE PAYNE CREEK2 of 8$3,098,000+12%
28 AUG 2024T5830District 5SR 5 NB (US 1) OVER TURNBULL CREEK, BRIDGE NO 7902552 of 8$6,927,000+24%
24 APR 2024T1850District 1CR 664 (COUNTYLINE RD) OVER PEACE RIVER, BRIDGE NO 1601012 of 8$5,393,000+2.0%
06 DEC 2023T2961District 2CLET HARVEY RD, OVER MUD LAKE SWAMP, BRIDGE NO 2740911 of 2$3,521,000Low, 19% under the second
28 APR 2021T2805District 2DRAYTON ISLAND RD4 of 4$6,309,000+56%
25 MAR 2020T2773District 2SR 200 (US 301)5 of 6$4,987,000+35%
28 AUG 2019T1750District 1SR 60 (HURRICANE IRMA)5 of 5$3,688,000+38%
24 APR 2019T2739District 2C ST4 of 4$10,797,000+60%
31 OCT 2018T5637District 5SR 331 of 5$3,244,000Low, 6.0% under the second
25 JUL 2018T3622District 3CR 3753 of 5$2,827,000+21%
25 APR 2018T2700District 2HOWELL DR2 of 2$14,777,000+24%
Leware Construction Company of Florida, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way