Granite Construction Company of California: FDOT bid record
Granite Construction Company of California submitted 12 bids on Florida DOT contracts in the data, from 25 MAR 2020 to 30 APR 2025, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $0
- Latest bid
- 30 APR 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 4 | 0 | 0% |
| 2025 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 4 | 0 | 0% |
| District 1 | 3 | 0 | 0% |
| District 7 | 3 | 0 | 0% |
| District 2 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 21 | 5 (24%) | $15.00 | $16.54 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 11 | 5 (45%) | $0.10 | $0.13 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 5 | 5 (100%) | $3,900.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 5 | 5 (100%) | $4,500.00 | $4,500.00 |
| Work zone sign | 0102-60 | ED | 12 | 4 (33%) | $0.23 | $0.25 |
| Type III barricade | 0102-115 | ED | 9 | 4 (44%) | $0.25 | $0.34 |
| Traffic control officer | 0102-14 | HR | 8 | 4 (50%) | $75.00 | $80.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 7 | 4 (57%) | $5.00 | $5.90 |
| Painted pavement markings, standard, white, solid for diagonal or chevron, 18" | 0710-11124 | LF | 7 | 4 (57%) | $1.50 | $1.60 |
| Regular excavation | 0120-1 | CY | 12 | 3 (25%) | $13.38 | $25.47 |
| Removal of existing concrete | 0110-4-10 | SY | 10 | 3 (30%) | $54.38 | $33.96 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 10 | 3 (30%) | $1,638.50 | $1,350.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vecellio & Grogan, Inc. | 8 | 3 of 8 |
| Superior Construction Company Southeast, LLC | 7 | 4 of 7 |
| Sema Construction, Inc. | 6 | 1 of 6 |
| Prince Contracting, LLC. | 3 | 2 of 3 |
| JR. Davis Construction Co., Inc. | 3 | 3 of 3 |
| Cone & Graham, Inc. | 3 | 3 of 3 |
| Masci General Contractors, Inc | 3 | 1 of 3 |
| Leware Construction Company of Florida, Inc. | 3 | 3 of 3 |
| Zep Construction, Inc. | 3 | 3 of 3 |
| Southland Construction, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 APR 2025 | T2A28 | District 2 | SR 5A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO... | 4 of 8 | $14,656,404 | +9.0% |
| 30 APR 2025 | T5793 | District 5 | SR 9 (I-95) FROM MP 18.355 TO MP 19.552 | 4 of 7 | $74,999,961 | +24% |
| 28 AUG 2024 | T1874 | District 1 | CR 664, BRIDGE NO 060034 OVER LITTLE PAYNE CREEK | 6 of 8 | $4,204,402 | +51% |
| 28 AUG 2024 | T5830 | District 5 | SR 5 NB (US 1) OVER TURNBULL CREEK, BRIDGE NO 790255 | 4 of 8 | $7,366,663 | +32% |
| 12 JUN 2024 | T7532 | District 7 | SR 60 (CCAMPBELL) FROM CCAMPBELL TR TO BAYSHORE TR | 2 of 5 | $17,384,384 | +14% |
| 24 APR 2024 | T1850 | District 1 | CR 664 (COUNTYLINE RD) OVER PEACE RIVER, BRIDGE NO 160101 | 5 of 8 | $6,992,777 | +32% |
| 17 MAY 2023 | T7507 | District 7 | SR 93 (I-275) | 4 of 5 | $29,613,233 | +32% |
| 22 FEB 2023 | T2891 | District 2 | SR 9 (I-95) | 3 of 5 | $89,952,301 | +13% |
| 25 JAN 2023 | T5777 | District 5 | GALAXY WAY | 6 of 9 | $28,133,822 | +23% |
| 26 MAY 2021 | T7472 | District 7 | SR 93 (I-275) | 5 of 6 | $105,059,724 | +23% |
| 10 JUN 2020 | T1754 | District 1 | SR 25 (US 27) | 7 of 9 | $56,950,586 | +27% |
| 25 MAR 2020 | T5706 | District 5 | SR 44 | 4 of 6 | $51,928,643 | +16% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.