FDOT contract T2A28 bid tabulation
SR 5A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO... Let by Florida DOT on April 30, 2025, St Johns, District 2. 8 bids received; low bid $13,385,441 by Coxwell, J.B. Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 30 APR 2025
- Pay items
- 157
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Coxwell, J.B. Contracting, Inc. | $13,385,441 | Low |
| 2 | Superior Construction Company Southeast, LLC | $13,776,274 | +3.0% |
| 3 | Archer Western Construction, LLC | $14,563,886 | +9.0% |
| 4 | Granite Construction Company of California | $14,656,404 | +9.0% |
| 5 | Vecellio & Grogan, Inc. | $15,137,321 | +13% |
| 6 | P & S Paving, Inc. | $15,860,889 | +18% |
| 7 | Kiewit Infrastructure South Co. | $16,903,663 | +26% |
| 8 | Boh Bros. Construction Co., L.L.C. | $18,974,115 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Coxwell, J.B. Contracting, Inc. | 2. Superior Construction Company Southeast, LLC | 3. Archer Western Construction, LLC | 4. Granite Construction Company of California | 5. Vecellio & Grogan, Inc. | 6. P & S Paving, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $536,600 | $1,941,970 | $2,000,000 | $800,000 | $850,000 | $1,200,000 |
| 0010 | Concrete class II, approach slabs (0400-2-10) | CY | 170.30 | $750.00 | $800.00 | $800.00 | $761.00 | $1,000.00 | $1,240.00 |
| 0015 | Concrete class IV, bridge substructure (0400-4-5) | CY | 172.40 | $1,950.00 | $2,500.00 | $2,051.00 | $2,200.00 | $2,500.00 | $1,800.00 |
| 0020 | Concrete class IV, cast in place topping with shrinkage admixture (0400-4-47) | CY | 586.70 | $1,325.00 | $1,115.00 | $1,200.00 | $1,700.00 | $1,300.00 | $1,400.00 |
| 0025 | Bridge deck grooving (0400-7-1) | SY | 999 | $6.74 | $4.00 | $12.00 | $15.50 | $9.00 | $16.00 |
| 0030 | Bridge deck planing (0400-9-1) | SY | 999 | $12.27 | $12.00 | $12.00 | $15.50 | $23.00 | $19.00 |
| 0035 | Plain neoprene bearing pads (0400-148) | CF | 19.60 | $1,290.00 | $1,000.00 | $2,000.00 | $1,400.00 | $2,200.00 | $1,860.00 |
| 0040 | Reinforcing steel- approach slabs (0415-1-9) | LB | 27,169 | $2.20 | $1.12 | $1.35 | $2.25 | $3.75 | $3.00 |
| 0045 | Fiber reinforced polymer bars, #4 bar (0415-10-4) | LF | 23,004 | $3.75 | $2.12 | $1.90 | $3.00 | $3.00 | $3.50 |
| 0050 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 98,807 | $4.10 | $2.12 | $2.25 | $3.00 | $3.50 | $5.00 |
| 0055 | Fiber reinforced polymer bars, #6 bar (0415-10-6) | LF | 12,343 | $2.60 | $2.12 | $4.25 | $5.00 | $4.75 | $5.00 |
| 0060 | Fiber reinforced polymer bars, #8 bar (0415-10-8) | LF | 5,107 | $5.50 | $2.12 | $4.75 | $6.00 | $6.25 | $6.70 |
| 0065 | Prestressed beam: florida slab beam, beam depth 18" carbon steel, width 58-60" (0450-8-34) | LF | 2,678 | $633.00 | $300.00 | $450.00 | $550.00 | $600.00 | $630.00 |
| 0070 | Preformed pile holes, 36" to 43" drill/punch size (0455-15-16) | LF | 1,489 | $292.00 | $66.00 | $0.01 | $40.00 | $70.00 | $290.00 |
| 0075 | Preformed pile holes casing, to 43" drill/punch size (0455-15-26) | LF | 1,489 | $329.00 | $73.89 | $0.01 | $82.00 | $185.00 | $125.00 |
| 0080 | Pile inspection, driven pile (0455-20-1) | EACH | 38 | $2,100.00 | $3,000.00 | $1,200.00 | $2,000.00 | $500.00 | $2,450.00 |
| 0085 | Prestressed concrete piling, SQ W/FRP or stainless steel strand and reinforcing (0455-34-25) | LF | 4,125 | $368.00 | $330.00 | $390.00 | $640.00 | $575.00 | $600.00 |
| 0090 | Pile redrive (0455-115) | EACH | 38 | $930.00 | $949.00 | $750.00 | $4,500.00 | $4,200.00 | $3,800.00 |
| 0095 | Sheet piling steel, F&I (0455-133-3) | SF | 3,403 | $52.60 | $52.00 | $75.00 | $75.00 | $75.00 | $160.00 |
| 0100 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 38 | $1,680.00 | $2,500.00 | $3,000.00 | $3,300.00 | $1,500.00 | $1,600.00 |
| 0105 | Load test (dynamic), test (0455-137-2) | EACH | 5 | $3,475.00 | $645.00 | $2,000.00 | $3,300.00 | $1,500.00 | $2,500.00 |
| 0110 | Test piles-prestressed concrete, 24" SQ W/ FRP or stainless steel strand and reinforcing (0455-143-25) | LF | 700 | $758.00 | $700.00 | $745.00 | $785.00 | $585.00 | $350.00 |
| 0115 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 108 | $53.00 | $135.00 | $160.00 | $91.00 | $100.00 | $135.00 |
| 0120 | Concrete traffic railing- 42" special design, project 437428-1-52-01 (0521-5-56) | LF | 616 | $478.00 | $530.00 | $360.00 | $650.00 | $785.00 | $1,000.00 |
| 0125 | Riprap, sand-cement bags (0530-1100) | CY | 28.40 | $1,178.00 | $850.00 | $2,500.00 | $2,500.00 | $1,950.00 | $1,900.00 |
| 0130 | Riprap- rubble, bank and shore (0530-3-3) | TN | 1,326.20 | $166.50 | $138.00 | $122.00 | $346.00 | $360.00 | $200.00 |
| 0135 | Bedding stone (0530-74) | TN | 388.20 | $195.00 | $221.00 | $366.00 | $330.00 | $475.00 | $250.00 |
| 0140 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 3,080 | $21.90 | $19.00 | $25.00 | $30.00 | $20.00 | $30.00 |
| 0145 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 14 | $875.00 | $925.00 | $1,000.00 | $1,500.00 | $2,300.00 | $2,000.00 |
| 0150 | Mobilization (0101-1) | LS | 1 | $1,575,350 | $1,300,000 | $1,450,000 | $1,450,000 | $1,490,000 | $1,570,000 |
| 0155 | Maintenance of traffic (0102-1) | DA | 1 | $715,000 | $158,000 | $997,500 | $150,000 | $275,000 | $456,000 |
| 0160 | Special detour- temporary pavement (0102-2200) | SY | 1 | $9,900.00 | $150,000 | $75,000 | $59,500 | $50,000 | $331,000 |
| 0165 | Work zone sign (0102-60) | ED | 34,840 | $0.22 | $0.22 | $0.50 | $0.50 | $0.50 | $0.30 |
| 0170 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 41,450 | $0.10 | $0.10 | $0.30 | $0.25 | $0.25 | $0.15 |
| 0175 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 17,494 | $0.06 | $0.06 | $0.25 | $0.07 | $0.20 | $0.10 |
| 0180 | Portable changeable message sign, temporary (0102-99) | ED | 1,908 | $9.93 | $10.00 | $25.00 | $17.00 | $18.00 | $13.00 |
| 0185 | Temporary signalization and maintenance, intersection (0102-104) | ED | 940 | $366.87 | $24.00 | $325.00 | $395.00 | $450.00 | $400.00 |
| 0190 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 940 | $15.75 | $9.50 | $50.00 | $4.75 | $450.00 | $2.00 |
| 0195 | Type III barricade (0102-115) | ED | 2,880 | $0.28 | $0.28 | $1.00 | $0.75 | $0.55 | $0.30 |
| 0200 | Sediment barrier (0104-10-3) | LF | 384 | $12.18 | $8.00 | $25.00 | $2.00 | $15.00 | $8.00 |
| 0205 | Floating turbidity barrier (0104-11) | LF | 409 | $37.50 | $46.00 | $50.00 | $50.00 | $60.00 | $55.00 |
| 0210 | Inlet protection system (0104-18) | EACH | 9 | $138.42 | $730.00 | $511.00 | $1,300.00 | $400.00 | $195.00 |
| 0215 | Litter removal (0107-1) | ACRE | 20.96 | $602.86 | $1,050.00 | $750.00 | $60.00 | $600.00 | $1,000.00 |
| 0220 | Mowing (0107-2) | ACRE | 9.37 | $357.39 | $1,700.00 | $750.00 | $110.00 | $300.00 | $1,000.00 |
| 0225 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $8,400.00 | $131,205 | $15,000 | $48,000 | $13,500 | $29,000 |
| 0230 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $89,250 | $136,600 | $40,000 | $45,000 | $50,000 | $29,000 |
| 0235 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $180,000 | $1,939,000 | $650,000 | $79,815 | $75,000 | $389,000 |
| 0240 | Removal of existing concrete (0110-4-10) | SY | 919 | $40.00 | $100.00 | $100.00 | $34.50 | $55.00 | $50.00 |
| 0245 | Regular excavation (0120-1) | CY | 1,210.10 | $23.00 | $75.00 | $15.00 | $34.00 | $65.00 | $30.00 |
| 0250 | Embankment (0120-6) | CY | 501.80 | $46.00 | $100.00 | $125.00 | $60.00 | $25.00 | $20.00 |
| 0255 | Surcharge embankment (0120-74) | CY | 232.70 | $83.00 | $65.00 | $300.00 | $145.00 | $140.00 | $128.00 |
| 0260 | Flowable fill (0121-70) | CY | 189.60 | $505.00 | $790.00 | $900.00 | $440.00 | $450.00 | $410.00 |
| 0265 | Settlement plate assembly (0141-70) | AS | 2 | $2,100.00 | $3,500.00 | $2,500.00 | $5,600.00 | $5,000.00 | $8,000.00 |
| 0270 | Geosynthetic reinforced foundation over soft soil (0145-2) | SY | 637 | $4.79 | $30.00 | $75.00 | $18.00 | $28.00 | $31.00 |
| 0275 | Type B stabilization (0160-4) | SY | 1,564 | $18.77 | $25.00 | $40.00 | $26.00 | $80.00 | $30.00 |
| 0280 | Optional base, base group 09 (0285-709) | SY | 1,392 | $33.65 | $45.00 | $50.00 | $46.50 | $120.00 | $38.00 |
| 0285 | Coarse aggregate base special design, 12" (0289-1103) | SY | 29 | $253.81 | $240.00 | $741.00 | $186.00 | $600.00 | $265.00 |
| 0290 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 1,592 | $13.13 | $9.35 | $11.00 | $28.00 | $16.00 | $7.00 |
| 0295 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 3,301 | $10.76 | $5.00 | $6.00 | $12.00 | $13.00 | $3.50 |
| 0300 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 309.90 | $283.50 | $210.00 | $265.00 | $550.00 | $335.00 | $174.00 |
| 0305 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 554.80 | $288.75 | $265.00 | $315.00 | $460.00 | $340.00 | $200.00 |
| 0307 | Plain cement concrete 9" (0350-3-7) | SY | 159 | $214.91 | $500.00 | $461.00 | $420.00 | $370.00 | $120.00 |
| 0310 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 1 | $9,745.00 | $12,000 | $25,000 | $17,090 | $13,500 | $16,000 |
| 0315 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 3 | $10,955 | $13,500 | $25,000 | $18,000 | $10,000 | $17,000 |
| 0320 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $6,325.00 | $11,000 | $15,000 | $16,969 | $10,000 | $12,000 |
| 0325 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 2 | $8,635.00 | $11,000 | $23,000 | $10,100 | $13,500 | $13,000 |
| 0330 | Manholes, J-7, <10' (0425-2-71) | EACH | 2 | $14,860 | $15,700 | $60,000 | $8,100.00 | $45,000 | $20,000 |
| 0335 | Manhole, adjust (0425-5) | EACH | 2 | $2,500.00 | $575.00 | $5,000.00 | $5,700.00 | $10,000 | $3,000.00 |
| 0340 | Manhole, adjust, utilities (0425-5-1) | EACH | 9 | $2,250.00 | $575.00 | $5,000.00 | $2,000.00 | $6,500.00 | $1,600.00 |
| 0345 | Valve boxes, adjust (0425-6) | EACH | 16 | $1,060.00 | $360.00 | $1,000.00 | $1,400.00 | $1,350.00 | $1,100.00 |
| 0350 | Meter boxes, adjust (0425-6-1) | EACH | 1 | $1,135.00 | $500.00 | $1,000.00 | $1,300.00 | $2,000.00 | $1,120.00 |
| 0355 | Pipe culvert,optional material,round, 12"S/CD (0430-175112) | LF | 12 | $628.00 | $395.00 | $75.00 | $302.00 | $560.00 | $510.00 |
| 0360 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 368 | $230.00 | $575.00 | $230.00 | $350.00 | $240.00 | $200.00 |
| 0365 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 79 | $425.00 | $620.00 | $775.00 | $500.00 | $570.00 | $526.00 |
| 0370 | U-endwall, with grate,index 260/430-010, 1:4 slope, 18" (0430-602125) | EACH | 1 | $4,460.00 | $6,500.00 | $20,000 | $8,500.00 | $8,000.00 | $5,115.00 |
| 0375 | Flap gates, 0-24" (0430-880-01) | EACH | 1 | $8,400.00 | $6,800.00 | $10,000 | $30,000 | $10,000 | $13,500 |
| 0380 | Flap gates, 37-48" (0430-880-03) | EACH | 1 | $93,100 | $72,000 | $70,000 | $105,000 | $10,000 | $20,800 |
| 0385 | Mitered end section, optional round, 12" CD (0430-982121) | EACH | 1 | $2,285.00 | $4,920.00 | $2,500.00 | $5,122.61 | $20,000 | $6,115.00 |
| 0390 | Underdrain outlet pipe, 4" (0440-73-1) | LF | 16 | $165.00 | $110.00 | $40.00 | $40.00 | $115.00 | $245.00 |
| 0395 | Concrete curb & gutter, type E (0520-1-7) | LF | 152 | $53.30 | $70.00 | $90.00 | $106.00 | $90.00 | $74.00 |
| 0400 | Concrete curb & gutter, type F (0520-1-10) | LF | 894 | $43.89 | $51.00 | $40.00 | $104.00 | $85.00 | $37.00 |
| 0405 | Concrete curb, type D (0520-2-4) | LF | 5 | $180.08 | $110.00 | $155.00 | $181.00 | $120.00 | $100.00 |
| 0410 | Valley gutter- concrete (0520-3) | LF | 131 | $96.93 | $50.00 | $60.00 | $180.00 | $100.00 | $52.00 |
| 0415 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 492 | $62.26 | $65.00 | $110.00 | $152.00 | $130.00 | $75.00 |
| 0420 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 220 | $118.21 | $90.00 | $160.00 | $200.00 | $160.00 | $153.00 |
| 0425 | Detectable warnings (0527-2) | SF | 54 | $64.30 | $105.00 | $75.00 | $60.00 | $100.00 | $32.00 |
| 0430 | Performance turf, sod (0570-1-2) | SY | 506 | $20.53 | $57.00 | $30.00 | $9.00 | $15.00 | $26.00 |
| 0435 | Raised pavement marker, type B (0706-1-3) | EACH | 242 | $6.30 | $6.00 | $10.00 | $6.00 | $7.50 | $7.00 |
| 0440 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.31 | $2,650.65 | $2,500.00 | $2,500.00 | $2,503.16 | $3,100.00 | $1,500.00 |
| 0445 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 183 | $3.15 | $3.00 | $3.00 | $3.00 | $3.75 | $3.00 |
| 0450 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 126 | $4.20 | $4.00 | $4.00 | $3.00 | $5.00 | $3.00 |
| 0455 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 100 | $5.25 | $5.00 | $5.00 | $5.00 | $6.00 | $5.00 |
| 0460 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.06 | $1,016.13 | $1,000.00 | $1,000.00 | $991.45 | $1,200.00 | $800.00 |
| 0465 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 8 | $78.75 | $75.00 | $75.00 | $65.00 | $90.00 | $52.00 |
| 0470 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.17 | $2,625.00 | $2,500.00 | $2,500.00 | $2,561.59 | $3,050.00 | $1,525.00 |
| 0475 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 144 | $4.20 | $4.00 | $4.00 | $4.50 | $5.00 | $3.00 |
| 0480 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.01 | $750.00 | $1,000.00 | $725.00 | $731.43 | $1,300.00 | $590.00 |
| 0485 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0490 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 6 | $606.90 | $578.00 | $750.00 | $600.00 | $1,000.00 | $600.00 |
| 0495 | Single column ground sign assembly, relocate (0700-1500) | EACH | 3 | $232.05 | $221.00 | $250.00 | $350.00 | $350.00 | $230.00 |
| 0500 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $42.00 | $40.00 | $125.00 | $102.46 | $160.00 | $42.00 |
| 0505 | Tubular marker, 36" yellow (0704-1-4) | EACH | 1 | $222.60 | $212.00 | $250.00 | $204.93 | $250.00 | $217.00 |
| 0510 | Raised pavement marker, type B (0706-1-3) | EACH | 279 | $6.30 | $6.00 | $10.00 | $8.50 | $7.50 | $5.75 |
| 0515 | Painted pavement markings, surface (0710-90) | LS | 1 | $10,500 | $10,000 | $11,000 | $10,246 | $12,000 | $4,300.00 |
| 0520 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 480 | $6.30 | $6.00 | $6.00 | $7.00 | $7.50 | $4.20 |
| 0525 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 427 | $8.40 | $8.00 | $8.00 | $10.50 | $10.00 | $5.25 |
| 0530 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 95 | $10.50 | $10.00 | $10.00 | $13.50 | $12.00 | $5.25 |
| 0535 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.02 | $4,295.45 | $4,500.00 | $4,100.00 | $4,191.82 | $5,500.00 | $2,350.00 |
| 0540 | Thermoplastic, standard, arrow (0711-11170) | EACH | 6 | $131.25 | $125.00 | $125.00 | $153.00 | $150.00 | $95.00 |
| 0545 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 109 | $8.40 | $8.00 | $8.00 | $10.00 | $10.00 | $5.25 |
| 0550 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.01 | $3,375.00 | $4,500.00 | $3,250.00 | $3,293.57 | $5,600.00 | $1,850.00 |
| 0555 | Thermoplastic, preformed, white, solid, 12" for crosswalk (0711-14123) | LF | 183 | $12.60 | $12.00 | $12.00 | $12.00 | $14.50 | $10.30 |
| 0560 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 226 | $23.10 | $22.00 | $22.00 | $20.00 | $27.00 | $14.50 |
| 0565 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 5 | $472.50 | $450.00 | $450.00 | $429.00 | $550.00 | $1,525.00 |
| 0570 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 22 | $36.75 | $35.00 | $35.00 | $39.00 | $42.00 | $26.00 |
| 0575 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 3 | $1,260.00 | $1,200.00 | $1,200.00 | $4,500.00 | $1,500.00 | $1,525.00 |
| 0580 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 4 | $840.00 | $800.00 | $800.00 | $1,500.00 | $975.00 | $1,000.00 |
| 0585 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.57 | $7,820.12 | $7,500.00 | $7,600.00 | $6,103.00 | $10,000 | $5,200.00 |
| 0590 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.01 | $3,937.50 | $4,500.00 | $3,800.00 | $3,842.50 | $5,500.00 | $1,525.00 |
| 0595 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.50 | $7,906.63 | $7,500.00 | $7,600.00 | $6,125.00 | $9,100.00 | $5,300.00 |
| 0600 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.10 | $41,176 | $40,000 | $40,000 | $40,182 | $50,000 | $51,000 |
| 0605 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 0.06 | $68,250 | $65,000 | $65,000 | $66,601 | $80,000 | $52,000 |
| 0610 | Permanent tape, white, 6-10 skip/dotted, 6" for concrete surfaces (0713-103141) | GM | 0.01 | $14,000 | $12,000 | $13,500 | $12,000 | $16,000 | $58,000 |
| 0615 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.09 | $12,462 | $12,000 | $12,000 | $10,809 | $15,000 | $51,000 |
| 0620 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.19 | $42,903 | $40,000 | $39,000 | $39,663 | $50,000 | $50,000 |
| 0625 | Permanent tape, yellow, 6-10 dotted extension, 6" wide, for concrete surfaces (0713-103241) | GM | 0.01 | $18,000 | $12,000 | $17,200 | $12,000 | $70,000 | $74,000 |
| 0630 | Permanent tape, black, 6-10 dotted extension, 6" for concrete surfaces (0713-103341) | GM | 0.01 | $12,600 | $12,000 | $12,000 | $12,296 | $15,000 | $52,000 |
| 0635 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.09 | $11,859 | $12,000 | $12,800 | $11,572 | $15,000 | $49,000 |
| 0640 | Conduit, furnish & install, open trench (0630-2-11) | LF | 408 | $25.07 | $17.00 | $30.00 | $29.50 | $20.00 | $27.00 |
| 0645 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 124 | $34.39 | $38.50 | $30.00 | $35.00 | $26.00 | $37.00 |
| 0650 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 12 | $2,671.20 | $1,572.00 | $1,500.00 | $2,800.00 | $1,300.00 | $2,850.00 |
| 0655 | Electrical power service, F&I, overhead, meter furnished by power company (0639-1111) | AS | 1 | $7,981.05 | $4,831.00 | $5,000.00 | $8,317.41 | $5,000.00 | $8,900.00 |
| 0660 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $3,029.25 | $2,600.00 | $3,000.00 | $3,156.92 | $3,200.00 | $3,250.00 |
| 0665 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 4,683 | $3.50 | $2.50 | $3.00 | $4.00 | $2.50 | $4.00 |
| 0670 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $17,449 | $21,000 | $15,000 | $18,184 | $16,000 | $19,000 |
| 0675 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 8' arm length (0715-61211) | EACH | 1 | $12,326 | $14,200 | $10,000 | $12,845 | $12,000 | $13,200 |
| 0680 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 7 | $1,010.10 | $758.00 | $1,000.00 | $1,400.00 | $1,950.00 | $1,100.00 |
| 0685 | Pole cable distribution system, wall mount (0715-500-3) | EACH | 10 | $1,009.05 | $898.00 | $1,000.00 | $1,200.00 | $1,900.00 | $1,100.00 |
| 0690 | Light pole complete- special design, F&I, double arm mount, aluminum, 15' (0715-512115) | EACH | 6 | $21,491 | $15,100 | $17,000 | $17,000 | $18,500 | $23,000 |
| 0695 | Light pole complete- special design, F&I, double arm bridge mount, aluminum, 15' (0715-517115) | EACH | 10 | $18,739 | $14,300 | $16,000 | $21,000 | $18,000 | $20,500 |
| 0700 | Conduit, furnish & install, open trench (0630-2-11) | LF | 703 | $54.29 | $17.00 | $30.00 | $35.00 | $20.00 | $59.00 |
| 0705 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 1 | $2,671.20 | $1,575.00 | $1,500.00 | $1,768.39 | $1,500.00 | $4,300.00 |
| 0710 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 2 | $3,906.00 | $2,950.00 | $2,500.00 | $4,000.00 | $2,500.00 | $4,300.00 |
| 0715 | Loop assembly, F&I, type F (0660-2106) | AS | 4 | $1,831.20 | $1,700.00 | $2,000.00 | $1,900.00 | $2,500.00 | $1,950.00 |
| 0720 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 4 | $12,685 | $10,100 | $10,000 | $18,000 | $12,000 | $14,000 |
| 0725 | Conduit, furnish & install, open trench (0630-2-11) | LF | 14 | $39.69 | $30.00 | $30.00 | $35.00 | $20.00 | $44.00 |
| 0730 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 937 | $32.66 | $39.00 | $30.00 | $35.00 | $25.00 | $36.00 |
| 0735 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 1,777 | $5.96 | $5.15 | $5.00 | $8.90 | $5.00 | $6.25 |
| 0740 | Fiber optic cable, remove, overhead (0633-1610) | LF | 2,013 | $5.05 | $2.15 | $1.50 | $3.00 | $1.50 | $5.50 |
| 0745 | Fiber optic cable, remove, underground (0633-1620) | LF | 1,034 | $2.70 | $1.50 | $1.10 | $2.50 | $1.00 | $3.00 |
| 0750 | Fiber optic connection, install, termination (0633-2-32) | EACH | 96 | $113.40 | $98.00 | $100.00 | $120.00 | $105.00 | $120.00 |
| 0755 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 8 | $95.55 | $131.00 | $100.00 | $110.00 | $115.00 | $105.00 |
| 0760 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 2 | $2,807.70 | $2,630.00 | $2,800.00 | $3,100.00 | $3,500.00 | $3,000.00 |
| 0765 | Fiber optic cable locator (0633-6) | DA | 570 | $316.94 | $180.00 | $375.00 | $354.00 | $450.00 | $340.00 |
| 0770 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $3,906.00 | $2,920.00 | $2,500.00 | $4,800.00 | $2,500.00 | $4,300.00 |
| 0775 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 2 | $2,355.15 | $3,450.00 | $800.00 | $2,600.00 | $3,500.00 | $2,600.00 |
| 0780 | Managed field ethernet switch, adjust / modify (0684-1-5) | EACH | 2 | $1,623.30 | $2,865.00 | $2,800.00 | $1,300.00 | $3,500.00 | $1,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 30, 2025. Compiled by Mirage Metrics.