| 0005 | Mobilization (0101-1) | LS | 1 | $500,000 | $1,250,000 | $492,562 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $500,000 | $400,000 | $607,500 |
| 0015 | Commercial material for temporary driveway maintenance (0102-3) | CY | 156 | $100.00 | $125.00 | $250.00 |
| 0020 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $100,000 | $25,000 | $56,790 |
| 0025 | Work zone sign (0102-60) | ED | 55,750 | $0.30 | $0.50 | $0.41 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 240 | $50.00 | $55.00 | $60.75 |
| 0035 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 1,680 | $25.00 | $30.00 | $33.75 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 242,178 | $0.15 | $0.25 | $0.14 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 131,124 | $0.10 | $0.50 | $0.14 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 446 | $7.50 | $25.00 | $6.75 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 1,840 | $15.00 | $20.00 | $20.25 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 892 | $15.00 | $12.00 | $15.00 |
| 0065 | Type III barricade (0102-115) | ED | 3,122 | $0.50 | $0.50 | $0.34 |
| 0070 | Sediment barrier (0104-10-3) | LF | 2,604 | $5.00 | $7.00 | $8.00 |
| 0075 | Inlet protection system (0104-18) | EACH | 18 | $200.00 | $275.00 | $500.00 |
| 0080 | Litter removal (0107-1) | ACRE | 73.35 | $50.00 | $150.00 | $200.00 |
| 0085 | Mowing (0107-2) | ACRE | 53.85 | $75.00 | $125.00 | $200.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $250,000 | $125,000 | $500,000 |
| 0095 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 0.16 | $50,000 | $250,000 | $50,000 |
| 0100 | Removal of existing concrete (0110-4-10) | SY | 783 | $50.00 | $100.00 | $50.00 |
| 0105 | Mailbox, F&I single (0110-7-1) | EACH | 7 | $400.00 | $250.00 | $950.00 |
| 0110 | Tree protection barrier (0110-21) | LF | 50 | $7.50 | $50.00 | $20.00 |
| 0115 | Tree root and branch pruning (0110-22) | EACH | 9 | $1,500.00 | $1,500.00 | $3,500.00 |
| 0120 | Regular excavation (0120-1) | CY | 1,753.40 | $20.00 | $50.00 | $40.00 |
| 0125 | Borrow excavation, truck measure (0120-2-2) | CY | 3,424.50 | $50.00 | $30.00 | $50.00 |
| 0130 | Subsoil excavation (0120-4) | CY | 727.60 | $30.00 | $50.00 | $80.00 |
| 0135 | Excavation for structures (0125-1) | CY | 395.80 | $250.00 | $60.00 | $80.00 |
| 0140 | Geosynthetic reinforced soil slope (0145-1) | SF | 2,678 | $30.00 | $25.00 | $5.00 |
| 0145 | Type B stabilization (0160-4) | SY | 1,967 | $20.00 | $40.00 | $25.74 |
| 0150 | Optional base, base group 09 (0285-709) | SY | 1,517 | $50.00 | $60.00 | $38.50 |
| 0155 | Turnout base- optional materials (0286-1) | SY | 1,533 | $75.00 | $25.00 | $60.00 |
| 0160 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 324.60 | $250.00 | $350.00 | $440.00 |
| 0165 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 125.20 | $300.00 | $500.00 | $400.00 |
| 0170 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 274.30 | $1,200.00 | $2,250.00 | $2,500.00 |
| 0175 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 1 | $12,500 | $18,000 | $16,240 |
| 0180 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 3 | $10,500 | $26,000 | $16,528 |
| 0185 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 6 | $10,000 | $16,000 | $14,649 |
| 0190 | Inlets, DT bot, type E, <10' (0425-1551) | EACH | 2 | $12,000 | $16,500 | $14,776 |
| 0195 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 1 | $10,000 | $16,000 | $14,259 |
| 0200 | Inlets, DT bot, type H, <10' (0425-1581) | EACH | 1 | $15,000 | $22,000 | $19,815 |
| 0205 | Inlets, closed flume (0425-1910) | EACH | 8 | $12,000 | $13,000 | $15,000 |
| 0210 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $12,000 | $15,250 | $13,599 |
| 0215 | Manholes, P-8, <10' (0425-2-61) | EACH | 1 | $12,000 | $16,000 | $14,474 |
| 0220 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 64 | $300.00 | $350.00 | $417.94 |
| 0225 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 20 | $250.00 | $500.00 | $405.54 |
| 0230 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 107 | $250.00 | $350.00 | $417.94 |
| 0235 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 7 | $275.00 | $1,100.00 | $445.23 |
| 0240 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 813 | $350.00 | $350.00 | $670.32 |
| 0245 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 8 | $500.00 | $1,100.00 | $713.73 |
| 0250 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 8 | $400.00 | $1,100.00 | $637.94 |
| 0255 | Straight concrete endwalls, single, 0 degrees, round (0430-515100) | EACH | 1 | $5,000.00 | $6,500.00 | $10,017 |
| 0260 | Straight concrete endwalls, single, 0 degrees, round (0430-536100) | EACH | 1 | $20,000 | $10,000 | $11,767 |
| 0265 | Straight concrete endwalls, single, 15 degrees, round (0430-536110) | EACH | 1 | $20,000 | $10,000 | $11,767 |
| 0270 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $3,000.00 | $5,000.00 | $6,424.15 |
| 0275 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 1 | $3,000.00 | $5,000.00 | $6,424.15 |
| 0280 | Mitered end section , optional round, 30" SD (0430-984133) | EACH | 1 | $5,000.00 | $8,000.00 | $10,467 |
| 0285 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 468 | $75.00 | $70.00 | $75.60 |
| 0290 | Pipe handrail - guiderail, relocate, aluminum (0515-1-42) | LF | 7 | $62.50 | $55.00 | $371.00 |
| 0295 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 549 | $156.25 | $142.00 | $129.20 |
| 0300 | Concrete curb & gutter, type E (0520-1-7) | LF | 34 | $55.00 | $75.00 | $50.00 |
| 0305 | Concrete curb & gutter, type F (0520-1-10) | LF | 4,091 | $75.00 | $75.00 | $50.00 |
| 0310 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 55 | $500.00 | $375.00 | $800.00 |
| 0315 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,341 | $75.00 | $125.00 | $130.00 |
| 0320 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,015 | $100.00 | $150.00 | $150.00 |
| 0325 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 147 | $150.00 | $150.00 | $200.00 |
| 0330 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 386 | $125.00 | $200.00 | $300.00 |
| 0335 | Detectable warnings (0527-2) | SF | 703 | $50.00 | $50.00 | $30.10 |
| 0340 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 2.80 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0345 | Guardrail removal (0536-73) | LF | 101 | $31.25 | $30.00 | $50.00 |
| 0350 | Performance turf, sod (0570-1-2) | SY | 3,532 | $5.00 | $10.00 | $8.00 |
| 0355 | Plastic erosion mat, turf reinforced mat, type 3 (0571-1-13) | SY | 311 | $50.00 | $50.00 | $50.00 |
| 0360 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 186 | $3.00 | $3.00 | $3.15 |
| 0365 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 25 | $5.00 | $6.00 | $5.60 |
| 0370 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 |
| 0375 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $14,415 | $14,415 | $14,415 |
| 0380 | Utility pipe, install, 5-7.9" (1050-13003) | LF | 322 | $500.00 | $250.00 | $300.00 |
| 0385 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31211) | LF | 40 | $200.00 | $375.00 | $300.00 |
| 0390 | Utility structure, below ground, F&I, water/sewer, 0 - 80 FT3, 0 - 6' (1060-11211) | EACH | 1 | $10,000 | $5,000.00 | $15,000 |
| 0395 | Utility structure, below ground, F&I, water / sewer > 80 FT3, 6.1 - 12' (1060-11222) | EACH | 1 | $20,000 | $25,000 | $25,000 |
| 0400 | Utility structure, below ground, adjust/modify (1060-15) | EACH | 3 | $2,500.00 | $4,000.00 | $5,000.00 |
| 0405 | Utility fixture, valve assembly, adjust/modify (1080-24500) | EACH | 3 | $1,500.00 | $2,000.00 | $5,000.00 |
| 0410 | Fire hydrant, adjust & modify (1644-700) | EACH | 1 | $2,500.00 | $10,000 | $5,000.00 |
| 0415 | Fire hydrant, relocate (1644-800) | EACH | 1 | $15,000 | $22,500 | $10,000 |
| 0420 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 10 | $750.00 | $450.00 | $1,230.00 |
| 0425 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $500.00 | $110.00 | $150.00 |
| 0430 | Single column ground sign assembly, remove (0700-1600) | EACH | 8 | $150.00 | $30.00 | $60.00 |
| 0435 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 2 | $10,000 | $6,875.00 | $3,750.00 |
| 0440 | Tubular marker, 36" white post (0704-1-3) | EACH | 4 | $250.00 | $165.00 | $180.00 |
| 0445 | Painted pavement markings, surface (0710-90) | LS | 1 | $100,000 | $3,500.00 | $6,462.93 |
| 0450 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 465 | $5.00 | $5.50 | $5.25 |
| 0455 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 30 | $10.00 | $11.00 | $7.00 |
| 0460 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 146 | $20.00 | $16.50 | $7.00 |
| 0465 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.81 | $7,500.00 | $13,200 | $7,000.00 |
| 0470 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.02 | $10,000 | $16,500 | $9,800.00 |
| 0475 | Conduit, furnish & install, open trench (0630-2-11) | LF | 163 | $20.00 | $16.50 | $22.50 |
| 0480 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 75 | $60.00 | $44.00 | $60.00 |
| 0485 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 237 | $30.00 | $22.00 | $30.00 |
| 0490 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 5 | $2,000.00 | $1,650.00 | $2,250.00 |
| 0495 | Aluminum signals pole, (0646-1-11) | EACH | 5 | $5,000.00 | $3,850.00 | $5,250.00 |
| 0500 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 3 | $2,400.00 | $1,650.00 | $2,250.00 |
| 0505 | Aluminum signals pole, (0646-1-40) | EACH | 3 | $1,000.00 | $440.00 | $600.00 |
| 0510 | Aluminum signals pole, remove (0646-1-60) | EACH | 4 | $500.00 | $220.00 | $300.00 |
| 0515 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 3 | $2,500.00 | $1,595.00 | $2,175.00 |
| 0520 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $4,000.00 | $2,750.00 | $3,750.00 |
| 0525 | Pedestrian signal, relocate (0653-1-40) | AS | 2 | $2,000.00 | $1,320.00 | $1,800.00 |
| 0530 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 3 | $500.00 | $220.00 | $300.00 |
| 0535 | Pedestrian detector, furnish & install, accessible (0665-1-12) | EACH | 11 | $3,000.00 | $2,200.00 | $3,000.00 |
| 0540 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 5 | $300.00 | $110.00 | $150.00 |
| 0545 | Traffic controller, modify (0671-2-40) | EACH | 4 | $4,000.00 | $2,750.00 | $3,750.00 |