FDOT contract T5886 bid tabulation
SR 50 (BROAD ST) FROM 2ND AVE TO SILVER EAGLE RD. Let by Florida DOT on June 10, 2026, Lake, District 5. 9 bids received; low bid $2,517,370 by DB Civil Construction, LLC.
- Owner
- Florida DOT
- Letting
- 10 JUN 2026
- Pay items
- 72
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | DB Civil Construction, LLC | $2,517,370 | Low |
| 2 | Ranger Construction Industries, Inc. | $2,745,775 | +9.0% |
| 3 | Leon America Construction | $2,977,678 | +18% |
| 4 | C.W. Roberts Contracting, Inc. | $3,102,498 | +23% |
| 5 | Southern Development & Construction, Inc. | $3,244,777 | +29% |
| 6 | Cone & Graham, Inc. | $3,356,924 | +33% |
| 7 | Gibbs & Register, Inc. | $3,413,083 | +36% |
| 8 | Cathcart Construction Company - Florida, LLC | $3,765,430 | +50% |
| 9 | Atlantic Civil Constructors Corp | $3,993,880 | +59% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. DB Civil Construction, LLC | 2. Ranger Construction Industries, Inc. | 3. Leon America Construction | 4. C.W. Roberts Contracting, Inc. | 5. Southern Development & Construction, Inc. | 6. Cone & Graham, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $180,000 | $269,100 | $300,000 | $300,000 | $320,000 | $335,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $20,000 | $226,762 | $300,000 | $136,000 | $190,578 | $196,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $100,000 | $105,000 | $168,105 | $120,000 | $50,000 | $101,000 |
| 0020 | Pedestrian escort/flagger (0102-5) | HR | 60 | $90.00 | $33.40 | $35.00 | $90.00 | $200.00 | $40.00 |
| 0025 | Traffic control officer (0102-14) | HR | 80 | $100.00 | $95.50 | $85.00 | $90.00 | $150.00 | $85.00 |
| 0030 | Work zone sign (0102-60) | ED | 13,460 | $0.30 | $0.20 | $0.21 | $0.25 | $0.25 | $0.22 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 14,004 | $0.14 | $0.10 | $0.10 | $0.14 | $0.15 | $0.12 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 582,672 | $0.04 | $0.04 | $0.05 | $0.05 | $0.04 | $0.04 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 570 | $6.00 | $5.60 | $5.00 | $5.72 | $10.00 | $5.00 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 1,236 | $11.00 | $11.25 | $10.00 | $11.72 | $15.00 | $10.25 |
| 0055 | Type III barricade (0102-115) | ED | 380 | $0.50 | $0.25 | $0.30 | $0.34 | $1.00 | $0.30 |
| 0060 | Portable regulatory, sign (0102-150-1) | ED | 40 | $10.00 | $5.60 | $6.00 | $5.72 | $20.00 | $5.00 |
| 0065 | Radar speed display unit (0102-150-2) | ED | 40 | $10.00 | $5.60 | $6.00 | $5.72 | $20.00 | $5.00 |
| 0070 | Artificial coverings /rolled erosion control products (0104-1) | SY | 333 | $10.00 | $6.75 | $6.50 | $30.00 | $15.00 | $6.50 |
| 0075 | Sediment barrier (0104-10-3) | LF | 9,419 | $1.20 | $1.80 | $3.02 | $2.00 | $4.00 | $2.50 |
| 0080 | Soil tracking prevention device (0104-15) | EACH | 2 | $2,000.00 | $3,920.00 | $4,000.00 | $2,600.00 | $10,000 | $2,500.00 |
| 0085 | Inlet protection system (0104-18) | EACH | 12 | $200.00 | $168.55 | $160.00 | $238.00 | $350.00 | $150.00 |
| 0090 | Litter removal (0107-1) | ACRE | 172.97 | $10.00 | $33.45 | $10.00 | $23.00 | $10.00 | $90.00 |
| 0095 | Mowing (0107-2) | ACRE | 95.04 | $50.00 | $100.40 | $15.00 | $69.00 | $20.00 | $105.00 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $65,000 | $193,645 | $131,440 | $277,315 | $300,000 | $297,536 |
| 0105 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 5.12 | $12,000 | $12,800 | $14,800 | $25,000 | $25,000 | $10,410 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 2,262 | $22.00 | $12.55 | $20.00 | $40.00 | $35.00 | $28.00 |
| 0115 | Mailbox, F&I single (0110-7-1) | EACH | 3 | $150.00 | $561.80 | $450.00 | $536.00 | $800.00 | $350.00 |
| 0120 | Tree protection barrier (0110-21) | LF | 8,136 | $2.50 | $2.45 | $6.30 | $1.10 | $7.00 | $4.00 |
| 0125 | Tree root and branch pruning (0110-22) | EACH | 137 | $90.00 | $842.70 | $550.00 | $1,029.00 | $300.00 | $750.00 |
| 0130 | Regular excavation (0120-1) | CY | 7,122.40 | $22.00 | $7.35 | $14.50 | $11.20 | $15.00 | $19.00 |
| 0135 | Embankment (0120-6) | CY | 6,302.30 | $20.00 | $3.45 | $14.50 | $10.00 | $20.00 | $25.00 |
| 0140 | Type B stabilization (0160-4) | SY | 14,186 | $17.00 | $12.55 | $8.50 | $12.05 | $10.00 | $19.25 |
| 0145 | Optional base, base group 01 (0285-701) | SY | 11,301 | $18.00 | $13.80 | $17.00 | $11.60 | $20.00 | $24.00 |
| 0150 | Optional base, base group 09 (0285-709) | SY | 1,516 | $75.00 | $60.10 | $22.00 | $60.00 | $90.00 | $72.00 |
| 0155 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 1,495 | $12.00 | $17.70 | $12.00 | $14.35 | $23.00 | $19.05 |
| 0160 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 1,336.20 | $170.00 | $150.25 | $150.00 | $144.00 | $200.00 | $162.05 |
| 0165 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 63 | $340.00 | $510.85 | $200.00 | $582.00 | $280.00 | $593.00 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 125.60 | $430.00 | $356.70 | $200.00 | $374.00 | $360.00 | $404.00 |
| 0175 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $7,000.00 | $4,020.00 | $6,500.00 | $3,600.00 | $5,000.00 | $3,638.00 |
| 0180 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 1 | $9,000.00 | $9,220.00 | $10,000 | $13,500 | $10,000 | $6,705.00 |
| 0185 | Manholes, P-8, <10' (0425-2-61) | EACH | 5 | $7,500.00 | $8,260.00 | $7,000.00 | $7,699.00 | $6,000.00 | $5,316.00 |
| 0190 | Manhole, adjust (0425-5) | EACH | 2 | $900.00 | $1,680.00 | $600.00 | $1,155.00 | $1,500.00 | $1,500.00 |
| 0195 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 277 | $172.00 | $173.90 | $200.00 | $147.00 | $120.00 | $128.50 |
| 0200 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 874 | $142.00 | $139.90 | $200.00 | $104.50 | $80.00 | $106.00 |
| 0205 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 87 | $150.00 | $169.30 | $220.00 | $166.20 | $125.00 | $159.00 |
| 0210 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 38 | $170.00 | $164.15 | $200.00 | $324.30 | $1.00 | $131.00 |
| 0215 | U-endwall with baffles, index 261/430-011, 1:4 slope, 18"pipe (0430-611125) | EACH | 1 | $5,500.00 | $3,700.00 | $4,500.00 | $3,311.00 | $4,500.00 | $3,950.00 |
| 0220 | U-endwall with baffles, index 261/430-011, 1:2 slope, 24"pipe (0430-611329) | EACH | 1 | $5,600.00 | $3,590.00 | $4,800.00 | $3,847.00 | $5,500.00 | $4,950.00 |
| 0225 | U-endwall with grate, index 261/430-011, 1:6 slope, 30" (0430-612033) | EACH | 1 | $11,000 | $8,810.00 | $12,500 | $10,250 | $9,500.00 | $12,500 |
| 0230 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 2 | $2,600.00 | $3,830.00 | $3,500.00 | $3,340.00 | $3,000.00 | $3,900.00 |
| 0235 | Mitered end section, optional - elliptical / arch, 18" CD (0430-982625) | EACH | 2 | $2,800.00 | $3,910.00 | $3,500.00 | $3,525.00 | $1.00 | $4,000.00 |
| 0240 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 12 | $2,800.00 | $3,670.00 | $3,800.00 | $3,525.00 | $3,000.00 | $3,900.00 |
| 0245 | Concrete curb & gutter, type E (0520-1-7) | LF | 36 | $48.00 | $91.90 | $100.00 | $56.00 | $130.00 | $45.00 |
| 0250 | Concrete curb & gutter, type F (0520-1-10) | LF | 492 | $48.00 | $41.10 | $50.00 | $87.90 | $60.00 | $42.50 |
| 0255 | Concrete curb, type A (0520-2-1) | LF | 17 | $34.00 | $124.15 | $100.00 | $45.50 | $200.00 | $42.00 |
| 0260 | Concrete curb, type D (0520-2-4) | LF | 220 | $34.00 | $67.45 | $50.00 | $43.20 | $70.00 | $42.00 |
| 0265 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 23 | $90.00 | $185.40 | $70.00 | $200.00 | $200.00 | $107.50 |
| 0270 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 1,038 | $85.00 | $96.65 | $98.00 | $136.00 | $130.00 | $130.00 |
| 0275 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 643 | $94.00 | $72.50 | $180.00 | $162.00 | $90.00 | $101.00 |
| 0280 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 177 | $120.00 | $129.20 | $200.00 | $222.00 | $170.00 | $120.00 |
| 0285 | Detectable warnings (0527-2) | SF | 698 | $35.00 | $36.95 | $35.00 | $32.50 | $50.00 | $65.00 |
| 0290 | Performance turf, sod (0570-1-2) | SY | 33,266 | $3.50 | $4.60 | $3.80 | $6.35 | $5.50 | $3.50 |
| 0295 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,510 | $2.50 | $2.25 | $1.60 | $2.17 | $2.50 | $2.00 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0305 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 34 | $700.00 | $606.75 | $530.00 | $488.00 | $550.00 | $500.00 |
| 0310 | Single column ground sign assembly, relocate (0700-1500) | EACH | 17 | $350.00 | $196.65 | $380.00 | $108.00 | $500.00 | $425.00 |
| 0315 | Single column ground sign assembly, remove (0700-1600) | EACH | 3 | $60.00 | $56.20 | $100.00 | $54.00 | $100.00 | $75.00 |
| 0320 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $60.00 | $28.10 | $100.00 | $27.00 | $100.00 | $75.00 |
| 0325 | Raised pavement marker, type B (0706-1-3) | EACH | 24 | $8.00 | $5.60 | $6.00 | $6.50 | $15.00 | $10.00 |
| 0330 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 143 | $7.00 | $6.75 | $5.00 | $5.42 | $15.00 | $10.00 |
| 0335 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,000.00 | $13,500 | $10,000 | $5,416.00 | $10,000 | $7,500.00 |
| 0340 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 972 | $7.00 | $5.60 | $3.90 | $4.35 | $7.00 | $6.00 |
| 0345 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 137 | $12.00 | $10.10 | $7.00 | $9.00 | $15.00 | $12.00 |
| 0350 | Thermoplastic, standard, arrow (0711-11170) | EACH | 1 | $100.00 | $112.35 | $85.00 | $136.00 | $175.00 | $150.00 |
| 0355 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 21 | $10.00 | $6.75 | $5.00 | $5.40 | $12.00 | $10.00 |
| 0360 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.03 | $7,000.00 | $8,030.00 | $5,800.00 | $7,800.00 | $7,000.00 | $8,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 10, 2026. Compiled by Mirage Metrics.