Gibbs & Register, Inc.: FDOT bid record
Gibbs & Register, Inc. submitted 18 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 10 JUN 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $0
- Latest bid
- 10 JUN 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2019 | 4 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 4 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 7 | 0 | 0% |
| District 5 | 7 | 0 | 0% |
| District 7 | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Single post sign, remove | 0700-1-60 | AS | 12 | 6 (50%) | $32.50 | $31.94 |
| Portable changeable message sign, temporary | 0102-99 | ED | 17 | 5 (29%) | $14.00 | $12.00 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 11 | 5 (45%) | $0.05 | $0.07 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 10 | 5 (50%) | $6.00 | $5.90 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 21 | 4 (19%) | $25.00 | $16.54 |
| Regular excavation | 0120-1 | CY | 16 | 4 (25%) | $20.50 | $25.47 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 13 | 4 (31%) | $5.00 | $5.00 |
| Temporary signalization and maintenance, intersection | 0102-104 | ED | 11 | 4 (36%) | $26.50 | $15.00 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 22 | 3 (14%) | $1,800.00 | $1,150.00 |
| Work zone sign | 0102-60 | ED | 17 | 3 (18%) | $0.25 | $0.25 |
| Embankment | 0120-6 | CY | 16 | 3 (19%) | $30.00 | $30.04 |
| Sediment barrier | 0104-10-3 | LF | 15 | 3 (20%) | $2.00 | $2.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ajax Paving Industries of Florida LLC | 6 | 5 of 6 |
| C.W. Roberts Contracting, Inc. | 5 | 4 of 5 |
| Ranger Construction Industries, Inc. | 5 | 4 of 5 |
| Watson Civil Construction, Inc. | 5 | 5 of 5 |
| Gosalia Concrete Constructors, Inc. | 4 | 3 of 4 |
| Hubbard Construction Company | 4 | 2 of 4 |
| Russell Engineering, Inc. | 4 | 4 of 4 |
| Masci General Contractors, Inc | 4 | 3 of 4 |
| Sema Construction, Inc. | 3 | 1 of 3 |
| Cone & Graham, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 10 JUN 2026 | T5886 | District 5 | SR 50 (BROAD ST) FROM 2ND AVE TO SILVER EAGLE RD | 7 of 9 | $3,413,083 | +36% |
| 20 MAY 2026 | T1933 | District 1 | SR 25 (US 27) FROM MP 4.478 TO MP 4.856 | 5 of 6 | $7,122,839 | +32% |
| 25 MAR 2026 | T1928 | District 1 | SR 544 FROM LAKE BLUE DR TO 26TH ST NW | 9 of 10 | $1,633,324 | +36% |
| 11 JUN 2025 | T7542 | District 7 | SR 687 (4TH ST N) FROM SR 694 (GANDY BLVD) TO BIG ISLAND GAP | 6 of 9 | $5,179,170 | +15% |
| 25 OCT 2023 | T5814 | District 5 | SR 527 (ORANGE AVE) FROM CLAY AVE TO S ORLANDO AVE | 2 of 4 | $3,725,527 | 0.0% |
| 26 JUL 2023 | T5797 | District 5 | SR 520, FROM COX ROAD TO AURORA RD | 3 of 4 | $6,501,074 | +5.0% |
| 26 JUL 2023 | T5800 | District 5 | SR A1A, AT SR 518 | 2 of 2 | $4,539,036 | +23% |
| 24 MAY 2023 | T5789 | District 5 | SR 471 | 5 of 6 | $9,494,481 | +12% |
| 26 OCT 2022 | T5749 | District 5 | SR 436 | 2 of 2 | $14,390,569 | +3.0% |
| 31 MAR 2021 | T1770 | District 1 | SR 72 | 7 of 8 | $3,749,765 | +46% |
| 27 JAN 2021 | T1794 | District 1 | SR 37 | 5 of 5 | $3,318,000 | +13% |
| 18 NOV 2020 | T7449 | District 7 | MORRIS BRIDGE - BIKE PATH/TRAIL | 6 of 12 | $4,921,206 | +10% |
| 29 JUL 2020 | T1757 | District 1 | SR 37 | 5 of 5 | $3,285,000 | +52% |
| 12 JUN 2019 | T7434 | District 7 | WITHLACOOCHEE-DUNNELLON TRAIL CONNECTOR | 4 of 4 | $7,560,483 | +36% |
| 27 MAR 2019 | T1748 | District 1 | SR 600 (US 92) | 5 of 5 | $1,506,199 | +32% |
| 27 MAR 2019 | T5647 | District 5 | SR 482 (SAND LAKE RD) | 4 of 4 | $2,617,551 | +30% |
| 27 FEB 2019 | T7419 | District 7 | BIG BEND RD | 4 of 4 | $1,412,952 | +43% |
| 31 JAN 2018 | T1693 | District 1 | EWELL RD | 5 of 5 | $3,919,226 | +55% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.