FDOT contract T2A75 bid tabulation
SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN. Let by Florida DOT on August 26, 2026, Duval, District 2. 5 bids received; low bid $2,092,518 by Preferred Materials Inc..
- Owner
- Florida DOT
- Letting
- 26 AUG 2026
- Pay items
- 95
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Preferred Materials Inc. | $2,092,518 | Low |
| 2 | Pigott Asphalt and Sitework LLC | $2,164,000 | +3.0% |
| 3 | C.W. Matthews Contracting Co., Inc. | $2,267,290 | +8.0% |
| 4 | Hubbard Construction Company | $2,278,270 | +9.0% |
| 5 | Duval Asphalt Products, Inc. | $2,299,835 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Preferred Materials Inc. | 2. Pigott Asphalt and Sitework LLC | 3. C.W. Matthews Contracting Co., Inc. | 4. Hubbard Construction Company | 5. Duval Asphalt Products, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 64 | $86.00 | $150.00 | $130.20 | $108.49 | $105.00 |
| 0010 | Polymer nosing for bridge expansion joint (0458-2) | CF | 7.60 | $1,150.00 | $1,000.00 | $1,095.89 | $1,450.78 | $1,500.00 |
| 0015 | Mobilization (0101-1) | LS | 1 | $249,931 | $284,000 | $206,225 | $221,816 | $280,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $201,911 | $199,499 | $195,369 | $343,734 | $225,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $5,825.32 | $25,000 | $10,334 | $26,314 | $5,500.00 |
| 0030 | Pedestrian escort/flagger (0102-5) | HR | 1,600 | $30.00 | $25.00 | $42.82 | $36.94 | $35.00 |
| 0035 | Traffic control officer (0102-14) | HR | 104 | $100.00 | $100.00 | $73.35 | $78.16 | $95.00 |
| 0040 | Work zone sign (0102-60) | ED | 16,440 | $0.24 | $0.16 | $0.27 | $0.20 | $0.25 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 168 | $37.00 | $40.00 | $44.63 | $51.07 | $40.00 |
| 0050 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 108 | $18.00 | $20.00 | $24.78 | $25.54 | $22.00 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 52,988 | $0.11 | $0.01 | $0.12 | $0.10 | $0.25 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 5,385 | $0.06 | $0.20 | $0.07 | $0.05 | $1.00 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 300 | $4.75 | $7.00 | $5.36 | $7.66 | $7.00 |
| 0070 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 506 | $5.25 | $5.00 | $5.64 | $5.47 | $6.00 |
| 0075 | Portable changeable message sign, temporary (0102-99) | ED | 672 | $10.00 | $12.00 | $11.28 | $15.32 | $17.00 |
| 0080 | Temporary signalization and maintenance, intersection (0102-104) | ED | 210 | $22.00 | $1.00 | $24.83 | $23.39 | $30.00 |
| 0085 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 210 | $11.00 | $1.00 | $12.41 | $11.70 | $50.00 |
| 0090 | Type III barricade (0102-115) | ED | 4,900 | $0.25 | $0.01 | $0.28 | $0.33 | $0.35 |
| 0095 | Inlet protection system (0104-18) | EACH | 29 | $104.10 | $150.00 | $346.46 | $122.50 | $70.00 |
| 0100 | Litter removal (0107-1) | ACRE | 38.25 | $300.00 | $10.00 | $168.24 | $398.72 | $400.00 |
| 0105 | Mowing (0107-2) | ACRE | 26.86 | $300.00 | $10.00 | $115.99 | $569.61 | $600.00 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $34,500 | $56,000 | $25,559 | $39,130 | $37,500 |
| 0115 | Removal of existing concrete (0110-4-10) | SY | 357 | $35.50 | $45.00 | $28.90 | $40.89 | $47.00 |
| 0120 | Tree removal (0110-23) | EACH | 1 | $3,750.00 | $7,500.00 | $3,611.03 | $4,689.31 | $8,000.00 |
| 0125 | Regular excavation (0120-1) | CY | 66 | $102.05 | $75.00 | $156.74 | $40.89 | $65.00 |
| 0130 | Borrow excavation, truck measure (0120-2-2) | CY | 105 | $75.96 | $20.00 | $70.19 | $52.52 | $60.00 |
| 0135 | Geosynthetic reinforced foundation over soft soil (0145-2) | SY | 224 | $5.39 | $16.00 | $8.77 | $19.00 | $22.50 |
| 0140 | Type B stabilization (0160-4) | SY | 211 | $77.78 | $35.00 | $64.44 | $20.16 | $30.00 |
| 0145 | Optional base, base group 01 (0285-701) | SY | 32 | $165.21 | $150.00 | $206.59 | $115.42 | $95.00 |
| 0150 | Optional base, base group 09 (0285-709) | SY | 211 | $79.70 | $75.00 | $190.49 | $100.14 | $36.00 |
| 0155 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 21,472 | $3.05 | $3.00 | $5.08 | $4.06 | $3.00 |
| 0160 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 5,780 | $6.58 | $3.00 | $11.85 | $9.42 | $5.50 |
| 0165 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 1,807 | $206.13 | $190.00 | $220.05 | $176.98 | $191.50 |
| 0170 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 2,265.70 | $210.71 | $195.00 | $248.26 | $199.39 | $201.50 |
| 0175 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 1 | $15,750 | $12,000 | $12,744 | $17,276 | $14,000 |
| 0180 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $17,325 | $12,000 | $14,268 | $19,004 | $14,000 |
| 0185 | Manhole, adjust (0425-5) | EACH | 19 | $1,260.00 | $2,000.00 | $1,232.79 | $1,492.09 | $2,000.00 |
| 0190 | Manhole, adjust, utilities (0425-5-1) | EACH | 15 | $1,260.00 | $2,000.00 | $1,006.40 | $1,492.09 | $750.00 |
| 0195 | Valve boxes, adjust (0425-6) | EACH | 16 | $1,260.00 | $1,000.00 | $497.12 | $1,382.11 | $1,800.00 |
| 0200 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 123 | $285.00 | $400.00 | $162.07 | $356.68 | $900.00 |
| 0205 | Concrete curb & gutter, type F (0520-1-10) | LF | 375 | $38.50 | $105.00 | $55.03 | $46.64 | $85.00 |
| 0210 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 107 | $47.50 | $125.00 | $77.40 | $57.54 | $70.00 |
| 0215 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 161 | $72.50 | $150.00 | $98.43 | $87.83 | $70.00 |
| 0220 | Detectable warnings (0527-2) | SF | 120 | $35.50 | $40.00 | $43.45 | $43.00 | $45.00 |
| 0225 | Performance turf, sod (0570-1-2) | SY | 244 | $45.73 | $5.00 | $13.94 | $47.03 | $8.00 |
| 0230 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.61 | $2,000.00 | $1,800.00 | $2,083.74 | $2,080.26 | $1,900.00 |
| 0235 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 2,188 | $2.00 | $1.00 | $2.93 | $2.08 | $2.70 |
| 0240 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,255 | $2.75 | $2.50 | $3.27 | $2.87 | $3.00 |
| 0245 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.02 | $430.00 | $1,200.00 | $1,222.22 | $248.89 | $1,000.00 |
| 0250 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 2 | $85.00 | $150.00 | $107.20 | $88.58 | $100.00 |
| 0255 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.52 | $2,000.00 | $1,800.00 | $2,079.64 | $2,076.15 | $1,900.00 |
| 0260 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.03 | $1,000.00 | $1,500.00 | $1,222.59 | $771.85 | $1,000.00 |
| 0265 | Two component polyurethane injection (0906-173200) | LB | 4,450 | $6.50 | $8.75 | $7.33 | $7.99 | $10.00 |
| 0270 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0275 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 12 | $475.00 | $500.00 | $536.01 | $1,162.48 | $500.00 |
| 0280 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $200.00 | $250.00 | $338.54 | $467.87 | $350.00 |
| 0285 | Single column ground sign assembly, remove (0700-1600) | EACH | 10 | $50.00 | $100.00 | $141.06 | $233.93 | $150.00 |
| 0290 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 1 | $50.00 | $10.00 | $84.63 | $89.77 | $85.00 |
| 0295 | Raised pavement marker, type B (0706-1-3) | EACH | 506 | $5.25 | $5.00 | $5.64 | $5.47 | $6.00 |
| 0300 | Painted pavement markings, surface (0710-90) | LS | 1 | $17,000 | $25,000 | $28,836 | $28,344 | $32,550 |
| 0305 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 2,171 | $3.50 | $5.50 | $4.23 | $3.65 | $4.00 |
| 0310 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 598 | $6.50 | $7.50 | $4.80 | $6.77 | $5.00 |
| 0315 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 645 | $7.00 | $10.00 | $6.21 | $7.29 | $6.00 |
| 0320 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.32 | $2,500.00 | $5,000.00 | $2,075.23 | $2,580.99 | $2,200.00 |
| 0325 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 7 | $140.00 | $250.00 | $169.27 | $145.89 | $175.00 |
| 0330 | Thermoplastic, standard, arrow (0711-11170) | EACH | 62 | $65.00 | $100.00 | $73.35 | $67.73 | $75.00 |
| 0335 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 524 | $6.50 | $7.50 | $4.80 | $6.77 | $5.00 |
| 0340 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 632 | $12.75 | $22.00 | $16.93 | $13.29 | $18.50 |
| 0345 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 2 | $630.00 | $1,200.00 | $507.80 | $656.51 | $500.00 |
| 0350 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 2 | $740.00 | $900.00 | $225.69 | $771.13 | $250.00 |
| 0355 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.56 | $4,600.00 | $6,500.00 | $5,247.28 | $4,793.52 | $5,000.00 |
| 0360 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.12 | $14,000 | $6,500.00 | $5,132.58 | $14,118 | $5,000.00 |
| 0365 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.07 | $2,200.00 | $5,000.00 | $1,886.42 | $2,052.99 | $2,000.00 |
| 0370 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.98 | $4,600.00 | $6,500.00 | $4,692.62 | $4,781.38 | $5,000.00 |
| 0375 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 1.23 | $2,200.00 | $5,000.00 | $1,885.04 | $2,281.33 | $2,000.00 |
| 0380 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 4,337 | $1.50 | $2.50 | $2.26 | $1.56 | $2.50 |
| 0385 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.21 | $44,000 | $35,000 | $37,650 | $44,994 | $40,000 |
| 0390 | Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171) | GM | 0.06 | $20,000 | $15,000 | $16,381 | $20,169 | $17,500 |
| 0395 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.15 | $14,000 | $12,500 | $16,815 | $14,492 | $17,500 |
| 0400 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.21 | $44,000 | $33,000 | $37,650 | $44,994 | $40,000 |
| 0405 | Permanent tape, black, 6-10 dotted extension, 6" for concrete surfaces (0713-103341) | GM | 0.06 | $19,000 | $12,500 | $17,473 | $19,161 | $18,500 |
| 0410 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.15 | $13,000 | $12,500 | $17,155 | $12,815 | $18,000 |
| 0415 | Conduit, furnish & install, open trench (0630-2-11) | LF | 85 | $21.49 | $30.00 | $24.25 | $22.85 | $42.00 |
| 0420 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 310 | $31.86 | $60.00 | $35.95 | $33.88 | $42.00 |
| 0425 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 235 | $5.24 | $15.00 | $5.91 | $5.57 | $32.00 |
| 0430 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,629.20 | $1,400.00 | $1,838.46 | $1,732.40 | $800.00 |
| 0435 | Aluminum signals pole, (0646-1-11) | EACH | 3 | $3,146.61 | $3,250.00 | $3,550.78 | $3,345.90 | $5,000.00 |
| 0440 | Aluminum signals pole, remove (0646-1-60) | EACH | 1 | $880.00 | $1,250.00 | $993.03 | $935.74 | $1,200.00 |
| 0445 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 3 | $860.83 | $1,250.00 | $971.40 | $915.35 | $1,400.00 |
| 0450 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 1 | $110.00 | $500.00 | $124.13 | $116.96 | $275.00 |
| 0455 | Loop assembly, F&I, type F (0660-2106) | AS | 11 | $1,594.34 | $1,700.00 | $1,799.13 | $1,695.32 | $2,800.00 |
| 0460 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 3 | $361.24 | $500.00 | $407.75 | $384.12 | $700.00 |
| 0465 | Pedestrian detector, adjust/modify on existing pole (0665-1-50) | EACH | 7 | $165.00 | $300.00 | $186.19 | $175.45 | $575.00 |
| 0470 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 1 | $110.00 | $500.00 | $124.13 | $116.96 | $300.00 |
| 0475 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 1 | $880.00 | $8,400.00 | $993.03 | $935.74 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way