FDOT contract T2A75 bid tabulation

SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN. Let by Florida DOT on August 26, 2026, Duval, District 2. 5 bids received; low bid $2,092,518 by Preferred Materials Inc..

Owner
Florida DOT
Letting
26 AUG 2026
Pay items
95
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$2,092,518Low
2Pigott Asphalt and Sitework LLC$2,164,000+3.0%
3C.W. Matthews Contracting Co., Inc.$2,267,290+8.0%
4Hubbard Construction Company$2,278,270+9.0%
5Duval Asphalt Products, Inc.$2,299,835+10%
FDOT contract T2A75: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Pigott Asphalt and Sitework LLC3. C.W. Matthews Contracting Co., Inc.4. Hubbard Construction Company5. Duval Asphalt Products, Inc.
0005Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF64$86.00$150.00$130.20$108.49$105.00
0010Polymer nosing for bridge expansion joint (0458-2)CF7.60$1,150.00$1,000.00$1,095.89$1,450.78$1,500.00
0015Mobilization (0101-1)LS1$249,931$284,000$206,225$221,816$280,000
0020Maintenance of traffic (0102-1)DA1$201,911$199,499$195,369$343,734$225,000
0025Pedestrian or bicycle special detour (0102-4-1)SY1$5,825.32$25,000$10,334$26,314$5,500.00
0030Pedestrian escort/flagger (0102-5)HR1,600$30.00$25.00$42.82$36.94$35.00
0035Traffic control officer (0102-14)HR104$100.00$100.00$73.35$78.16$95.00
0040Work zone sign (0102-60)ED16,440$0.24$0.16$0.27$0.20$0.25
0045Temporary barrier, F&I, low profile, concrete (0102-71-13)LF168$37.00$40.00$44.63$51.07$40.00
0050Temporary barrier, relocate, low profile concrete (0102-71-23)LF108$18.00$20.00$24.78$25.54$22.00
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED52,988$0.11$0.01$0.12$0.10$0.25
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD5,385$0.06$0.20$0.07$0.05$1.00
0065Arrow board / advance warning arrow panel (0102-76)ED300$4.75$7.00$5.36$7.66$7.00
0070Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH506$5.25$5.00$5.64$5.47$6.00
0075Portable changeable message sign, temporary (0102-99)ED672$10.00$12.00$11.28$15.32$17.00
0080Temporary signalization and maintenance, intersection (0102-104)ED210$22.00$1.00$24.83$23.39$30.00
0085Temporary traffic detection and maintenance, intersection (0102-107-1)ED210$11.00$1.00$12.41$11.70$50.00
0090Type III barricade (0102-115)ED4,900$0.25$0.01$0.28$0.33$0.35
0095Inlet protection system (0104-18)EACH29$104.10$150.00$346.46$122.50$70.00
0100Litter removal (0107-1)ACRE38.25$300.00$10.00$168.24$398.72$400.00
0105Mowing (0107-2)ACRE26.86$300.00$10.00$115.99$569.61$600.00
0110Clearing & grubbing (0110-1-1)ACRE1$34,500$56,000$25,559$39,130$37,500
0115Removal of existing concrete (0110-4-10)SY357$35.50$45.00$28.90$40.89$47.00
0120Tree removal (0110-23)EACH1$3,750.00$7,500.00$3,611.03$4,689.31$8,000.00
0125Regular excavation (0120-1)CY66$102.05$75.00$156.74$40.89$65.00
0130Borrow excavation, truck measure (0120-2-2)CY105$75.96$20.00$70.19$52.52$60.00
0135Geosynthetic reinforced foundation over soft soil (0145-2)SY224$5.39$16.00$8.77$19.00$22.50
0140Type B stabilization (0160-4)SY211$77.78$35.00$64.44$20.16$30.00
0145Optional base, base group 01 (0285-701)SY32$165.21$150.00$206.59$115.42$95.00
0150Optional base, base group 09 (0285-709)SY211$79.70$75.00$190.49$100.14$36.00
0155Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY21,472$3.05$3.00$5.08$4.06$3.00
0160Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY5,780$6.58$3.00$11.85$9.42$5.50
0165Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN1,807$206.13$190.00$220.05$176.98$191.50
0170Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN2,265.70$210.71$195.00$248.26$199.39$201.50
0175Inlets, curb, type P-5, <10' (0425-1351)EACH1$15,750$12,000$12,744$17,276$14,000
0180Inlets, curb, type P-6, <10' (0425-1361)EACH1$17,325$12,000$14,268$19,004$14,000
0185Manhole, adjust (0425-5)EACH19$1,260.00$2,000.00$1,232.79$1,492.09$2,000.00
0190Manhole, adjust, utilities (0425-5-1)EACH15$1,260.00$2,000.00$1,006.40$1,492.09$750.00
0195Valve boxes, adjust (0425-6)EACH16$1,260.00$1,000.00$497.12$1,382.11$1,800.00
0200Pipe culvert,optional material,other-elip/arch, (0430-175218)LF123$285.00$400.00$162.07$356.68$900.00
0205Concrete curb & gutter, type F (0520-1-10)LF375$38.50$105.00$55.03$46.64$85.00
0210Concrete sidewalk and driveways, 4" thick (0522-1)SY107$47.50$125.00$77.40$57.54$70.00
0215Concrete sidewalk and driveways, 6" thick (0522-2)SY161$72.50$150.00$98.43$87.83$70.00
0220Detectable warnings (0527-2)SF120$35.50$40.00$43.45$43.00$45.00
0225Performance turf, sod (0570-1-2)SY244$45.73$5.00$13.94$47.03$8.00
0230Painted pavement markings, standard, white, solid, 6" (0710-11101)GM1.61$2,000.00$1,800.00$2,083.74$2,080.26$1,900.00
0235Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF2,188$2.00$1.00$2.93$2.08$2.70
0240Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,255$2.75$2.50$3.27$2.87$3.00
0245Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.02$430.00$1,200.00$1,222.22$248.89$1,000.00
0250Painted pavement markings, standard, white, message or symbol (0710-11160)EACH2$85.00$150.00$107.20$88.58$100.00
0255Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.52$2,000.00$1,800.00$2,079.64$2,076.15$1,900.00
0260Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.03$1,000.00$1,500.00$1,222.59$771.85$1,000.00
0265Two component polyurethane injection (0906-173200)LB4,450$6.50$8.75$7.33$7.99$10.00
0270Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0275Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH12$475.00$500.00$536.01$1,162.48$500.00
0280Single column ground sign assembly, relocate (0700-1500)EACH2$200.00$250.00$338.54$467.87$350.00
0285Single column ground sign assembly, remove (0700-1600)EACH10$50.00$100.00$141.06$233.93$150.00
0290Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH1$50.00$10.00$84.63$89.77$85.00
0295Raised pavement marker, type B (0706-1-3)EACH506$5.25$5.00$5.64$5.47$6.00
0300Painted pavement markings, surface (0710-90)LS1$17,000$25,000$28,836$28,344$32,550
0305Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,171$3.50$5.50$4.23$3.65$4.00
0310Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF598$6.50$7.50$4.80$6.77$5.00
0315Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF645$7.00$10.00$6.21$7.29$6.00
0320Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.32$2,500.00$5,000.00$2,075.23$2,580.99$2,200.00
0325Thermoplastic, standard, message or symbol (0711-11160)EACH7$140.00$250.00$169.27$145.89$175.00
0330Thermoplastic, standard, arrow (0711-11170)EACH62$65.00$100.00$73.35$67.73$75.00
0335Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF524$6.50$7.50$4.80$6.77$5.00
0340Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF632$12.75$22.00$16.93$13.29$18.50
0345Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560)EACH2$630.00$1,200.00$507.80$656.51$500.00
0350Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH2$740.00$900.00$225.69$771.13$250.00
0355Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.56$4,600.00$6,500.00$5,247.28$4,793.52$5,000.00
0360Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.12$14,000$6,500.00$5,132.58$14,118$5,000.00
0365Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.07$2,200.00$5,000.00$1,886.42$2,052.99$2,000.00
0370Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.98$4,600.00$6,500.00$4,692.62$4,781.38$5,000.00
0375Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM1.23$2,200.00$5,000.00$1,885.04$2,281.33$2,000.00
0380Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF4,337$1.50$2.50$2.26$1.56$2.50
0385Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.21$44,000$35,000$37,650$44,994$40,000
0390Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171)GM0.06$20,000$15,000$16,381$20,169$17,500
0395Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.15$14,000$12,500$16,815$14,492$17,500
0400Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.21$44,000$33,000$37,650$44,994$40,000
0405Permanent tape, black, 6-10 dotted extension, 6" for concrete surfaces (0713-103341)GM0.06$19,000$12,500$17,473$19,161$18,500
0410Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.15$13,000$12,500$17,155$12,815$18,000
0415Conduit, furnish & install, open trench (0630-2-11)LF85$21.49$30.00$24.25$22.85$42.00
0420Conduit, furnish & install, directional bore (0630-2-12)LF310$31.86$60.00$35.95$33.88$42.00
0425Signal cable- repair/replace/other, furnish & install (0632-7-2)LF235$5.24$15.00$5.91$5.57$32.00
0430Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$1,629.20$1,400.00$1,838.46$1,732.40$800.00
0435Aluminum signals pole, (0646-1-11)EACH3$3,146.61$3,250.00$3,550.78$3,345.90$5,000.00
0440Aluminum signals pole, remove (0646-1-60)EACH1$880.00$1,250.00$993.03$935.74$1,200.00
0445Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS3$860.83$1,250.00$971.40$915.35$1,400.00
0450Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS1$110.00$500.00$124.13$116.96$275.00
0455Loop assembly, F&I, type F (0660-2106)AS11$1,594.34$1,700.00$1,799.13$1,695.32$2,800.00
0460Pedestrian detector, furnish & install, standard (0665-1-11)EACH3$361.24$500.00$407.75$384.12$700.00
0465Pedestrian detector, adjust/modify on existing pole (0665-1-50)EACH7$165.00$300.00$186.19$175.45$575.00
0470Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH1$110.00$500.00$124.13$116.96$300.00
0475Traffic controller assembly, modify only - no components added (0670-5710)AS1$880.00$8,400.00$993.03$935.74$1,500.00
FDOT contract T2A75: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy