FDOT contract T3998 bid tabulation

SR 85/20 AND SR 397 FROM WOLVERINE TO EDGE AVE AND FROM SR 190 TO. Let by Florida DOT on August 26, 2026, Okaloosa, District 3. 3 bids received; low bid $4,722,952 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
26 AUG 2026
Pay items
108
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$4,722,952Low
2C.W. Roberts Contracting, Inc.$5,179,330+10%
3Pigott Asphalt and Sitework LLC$5,533,934+17%
FDOT contract T3998: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. C.W. Roberts Contracting, Inc.3. Pigott Asphalt and Sitework LLC
0005Epoxy material for crack injection- structures rehab (0411-1)GA2$336.40$421.35$850.00
0010Cracks inject & seal- structures rehab (0411-2)LF5$897.06$1,123.65$1,500.00
0015Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF600$72.89$91.30$165.00
0020Mobilization (0101-1)LS1$466,914$419,897$400,000
0025Maintenance of traffic (0102-1)DA1$226,962$390,969$314,600
0030Traffic control officer (0102-14)HR199$104.29$97.10$100.00
0035Work zone sign (0102-60)ED22,965$0.15$0.15$0.10
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED39,953$0.05$0.10$0.01
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD2,904$0.10$0.10$0.10
0050Arrow board / advance warning arrow panel (0102-76)ED388$8.97$9.15$0.50
0055Portable changeable message sign, temporary (0102-99)ED1,678$20.00$22.85$15.00
0060Temporary signalization and maintenance, intersection (0102-104)ED1,005$15.70$16.00$1.00
0065Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,005$16.82$17.15$1.00
0070Type III barricade (0102-115)ED32$100.00$5.70$10.00
0075Sediment barrier (0104-10-3)LF372$4.06$8.35$5.00
0080Inlet protection system (0104-18)EACH123$168.20$119.30$150.00
0085Litter removal (0107-1)ACRE116.89$151.39$171.40$10.00
0090Mowing (0107-2)ACRE51.83$151.39$171.40$10.00
0095Clearing & grubbing (0110-1-1)ACRE1$30,788$34,938$86,500
0100Removal of existing concrete (0110-4-10)SY2,433$62.80$53.85$35.00
0105Regular excavation (0120-1)CY86.80$94.25$90.90$56.50
0110Embankment (0120-6)CY79.30$51.58$115.40$65.00
0115Optional base, base group 06 (0285-706)SY26$838.06$226.35$150.00
0120Optional base, base group 11 (0285-711)SY47$419.88$212.35$150.00
0125Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY6,212$1.00$7.15$3.00
0130Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY39,064$1.00$2.85$3.00
0135Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY80,329$1.00$2.50$3.00
0140Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN54.70$239.44$569.55$300.00
0145Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN13,513.50$163.68$173.00$190.00
0150Inlets, curb, type P-1, <10' (0425-1311)EACH1$11,193$12,300$12,500
0155Inlets, curb type P-1, partial (0425-1315)EACH1$9,582.26$7,760.75$10,000
0160Inlets, ditch bottom, type C modified- back of sidewalk, <10' (0425-1531)EACH1$24,725$8,868.45$12,000
0165Manholes, P-7, <10' (0425-2-41)EACH1$8,646.84$8,810.80$12,500
0170Manhole, adjust (0425-5)EACH6$3,405.02$2,078.75$2,000.00
0175Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF158$325.25$277.65$300.00
0180Chemical grout repair, pipe, test, 18" (0432-3-2)EACH1$3,924.67$8,454.55$10,000
0185Pipe handrail - guiderail, aluminum (0515-1-2)LF11$72.89$114.25$150.00
0190Concrete curb & gutter, type E (0520-1-7)LF18$101.06$221.90$65.00
0195Concrete curb & gutter, type F (0520-1-10)LF1,905$85.83$79.70$50.00
0200Concrete curb, type D (0520-2-4)LF12$81.30$286.05$250.00
0205Valley gutter- concrete (0520-3)LF25$96.44$137.30$150.00
0210Concrete sidewalk and driveways, 4" thick (0522-1)SY1,691$102.05$73.30$105.00
0215Concrete sidewalk and driveways, 6" thick (0522-2)SY786$118.04$168.80$145.00
0220Detectable warnings (0527-2)SF781$33.42$36.65$35.00
0225Fencing, type B, 0.0-5.0', reset existing (0550-10218)LF145$15.70$48.85$65.00
0230Performance turf, sod (0570-1-2)SY1,604$9.71$12.75$5.00
0235Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000
0240Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH36$700.83$714.05$500.00
0245Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH3$3,139.74$3,199.00$850.00
0250Single column ground sign assembly, F&I barrier less than 12 SF (0700-1311)EACH1$1,682.01$1,713.75$750.00
0255Single column ground sign assembly, relocate (0700-1500)EACH3$67.28$68.55$300.00
0260Single column ground sign assembly, remove (0700-1600)EACH11$44.86$45.70$100.00
0265Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH17$392.47$399.90$350.00
0270Sign panel, relocate, UP to 12 SF (0700-3501)EACH16$44.86$45.70$250.00
0275Sign panel, remove, UP to 12 SF (0700-3601)EACH4$33.64$34.30$100.00
0280Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH31$84.10$85.70$250.00
0285Tubular marker, 36" white post (0704-1-3)EACH1$336.40$342.75$150.00
0290Tubular marker, 36" yellow (0704-1-4)EACH25$336.40$342.75$150.00
0295Object marker, type 1 (0705-10-1)EACH12$336.40$342.75$150.00
0300Raised pavement marker, type B (0706-1-3)EACH2,399$5.61$5.75$5.00
0305Painted pavement markings, surface (0710-90)LS1$39,247$40,102$65,000
0310Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.06$8,409.99$7,537.90$10,000
0315Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.04$14,017$13,020$25,000
0320Thermoplastic, standard, solid, 6" for parking spaces (0711-11121)LF302$6.73$6.85$10.00
0325Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF3,086$0.37$3.70$5.00
0330Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF144$4.40$4.50$8.00
0335Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF483$6.95$7.10$13.00
0340Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM1.08$2,803.34$2,853.85$5,000.00
0345Thermoplastic, standard, message or symbol (0711-11160)EACH5$280.34$286.45$250.00
0350Thermoplastic, standard, arrow (0711-11170)EACH168$100.92$103.10$100.00
0355Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF1,362$4.77$4.85$8.00
0360Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.55$2,803.34$2,822.55$6,000.00
0365Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,167$14.58$14.90$15.00
0370Thermoplastic, preformed, white, message (0711-14160)EACH83$112.13$114.60$275.00
0375Thermoplastic, preformed, white, arrow (0711-14170)EACH26$168.20$171.85$150.00
0380Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM7.76$5,382.41$5,496.80$6,500.00
0385Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.10$6,167.32$5,970.00$10,000
0390Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM6.73$2,803.34$2,861.85$5,000.00
0395Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.01$9,531.32$7,491.55$10,000
0400Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM4.83$5,382.41$5,498.50$6,500.00
0405Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.98$2,803.34$2,849.70$5,000.00
0410Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.27$33,640$33,597$50,000
0415Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.27$16,820$16,799$50,000
0420Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.13$33,640$33,597$50,000
0425Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.27$16,820$16,799$50,000
0430Conduit, furnish & install, open trench (0630-2-11)LF28$17.94$18.30$35.00
0435Conduit, furnish & install, directional bore (0630-2-12)LF71$33.64$34.30$65.00
0440Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$6,440.95$6,562.55$3,000.00
0445Signal cable, remove- intersection (0632-7-6)PI3$560.66$571.25$750.00
0450Aluminum signals pole, (0646-1-11)EACH7$3,588.27$3,656.00$3,500.00
0455Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH3$2,018.41$2,056.50$2,500.00
0460Aluminum signals pole, (0646-1-40)EACH1$1,121.33$1,142.50$1,000.00
0465Aluminum signals pole, remove (0646-1-60)EACH5$224.27$228.50$500.00
0470Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS37$2,018.40$2,056.50$3,200.00
0475Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36)AS1$2,466.94$2,513.50$3,500.00
0480Vehicular traffic signal, furnish & install 5 section straight, 1 way (0650-1-38)AS1$2,915.47$2,970.50$3,500.00
0485Vehicular traffic signal, remove- poles to remain (0650-1-60)AS39$224.27$228.50$2,500.00
0490Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS5$1,345.60$1,371.00$2,500.00
0495Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS2$2,018.41$2,056.50$2,500.00
0500Loop assembly- F&I, type A (0660-2101)AS25$1,457.73$1,485.25$1,600.00
0505Loop assembly, F&I, type B (0660-2102)AS42$1,233.47$1,256.75$1,800.00
0510Pedestrian detector, furnish & install, standard (0665-1-11)EACH15$532.63$542.70$1,300.00
0515Pedestrian detector, adjust/modify on existing pole (0665-1-50)EACH2$112.13$114.25$1,250.00
0520Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH5$28.03$28.55$750.00
0525Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$112.13$114.25$700.00
0530Sign panel, remove, UP to 12 SF (0700-3601)EACH1$28.03$28.55$150.00
0535Manhole, adjust, utilities (0425-5-1)EACH16$1,935.08$2,087.60$2,300.00
0540Valve boxes, adjust (0425-6)EACH3$2,723.34$1,093.60$1,200.00
FDOT contract T3998: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy