FDOT contract T3A32 bid tabulation
SR 10 (US 90) FROM END OF 4 LANE IN GRAND RIDGE TO APALACHICOLA RIVER. Let by Florida DOT on August 26, 2026, Jackson, District 3. 5 bids received; low bid $4,806,184 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 26 AUG 2026
- Pay items
- 101
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $4,806,184 | Low |
| 2 | Peavy & Son Construction Co., Inc. | $5,272,623 | +10% |
| 3 | C.W. Roberts Contracting, Inc. | $5,361,639 | +12% |
| 4 | Southeast Construction Company LLC | $6,246,838 | +30% |
| 5 | Capital Asphalt Inc | $7,289,305 | +52% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. Peavy & Son Construction Co., Inc. | 3. C.W. Roberts Contracting, Inc. | 4. Southeast Construction Company LLC | 5. Capital Asphalt Inc |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $409,164 | $75,000 | $200,000 | $150,000 | $700,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $50,000 | $75,000 | $30,000 | $130,000 | $50,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $188,303 | $90,000 | $175,000 | $100,000 | $275,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $50,000 | $90,000 | $30,000 | $75,000 | $50,000 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 99.30 | $52.95 | $30.00 | $52.00 | $430.00 | $60.00 |
| 0030 | Pedestrian escort/flagger (0102-5) | HR | 72 | $50.00 | $50.00 | $70.00 | $80.00 | $125.00 |
| 0035 | Work zone sign (0102-60) | ED | 63,057 | $0.10 | $0.11 | $0.40 | $0.50 | $0.50 |
| 0040 | Barrier mounted work zone sign- index 700-013 (0102-62-13) | ED | 882 | $0.34 | $0.31 | $1.15 | $1.50 | $1.00 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 50,862 | $0.03 | $0.11 | $0.03 | $0.05 | $1.00 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 846 | $0.03 | $1.03 | $0.03 | $0.05 | $5.00 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 588 | $5.05 | $15.45 | $5.75 | $6.00 | $6.00 |
| 0060 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 1,104 | $2.24 | $4.90 | $5.40 | $2.50 | $6.00 |
| 0065 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 1,752 | $5.61 | $4.90 | $5.40 | $5.50 | $6.00 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 616 | $15.14 | $25.75 | $17.00 | $18.00 | $17.00 |
| 0075 | Type III barricade (0102-115) | ED | 1,176 | $0.25 | $0.52 | $0.30 | $0.31 | $2.00 |
| 0080 | Sediment barrier (0104-10-3) | LF | 4,447 | $3.41 | $2.50 | $1.35 | $5.00 | $3.50 |
| 0085 | Inlet protection system (0104-18) | EACH | 33 | $168.20 | $150.00 | $230.00 | $265.00 | $200.00 |
| 0090 | Litter removal (0107-1) | ACRE | 1,443.63 | $5.00 | $60.00 | $34.00 | $35.00 | $40.00 |
| 0095 | Mowing (0107-2) | ACRE | 1,306.64 | $5.00 | $70.00 | $34.00 | $35.00 | $40.00 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $21,808 | $15,000 | $39,000 | $35,000 | $50,000 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $21,808 | $15,000 | $62,000 | $35,000 | $50,000 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 389 | $89.70 | $20.00 | $48.00 | $30.00 | $50.00 |
| 0115 | Mailbox, F&I single (0110-7-1) | EACH | 4 | $207.45 | $250.00 | $210.00 | $215.00 | $250.00 |
| 0120 | Regular excavation (0120-1) | CY | 3,010.20 | $24.28 | $5.00 | $28.00 | $25.00 | $40.00 |
| 0125 | Borrow excavation, truck measure (0120-2-2) | CY | 487.80 | $7.89 | $80.00 | $7.70 | $60.00 | $35.00 |
| 0130 | Type B stabilization (0160-4) | SY | 5,213 | $8.88 | $4.00 | $15.00 | $14.00 | $30.00 |
| 0135 | Optional base, base group 01 (0285-701) | SY | 1,508 | $18.00 | $14.00 | $9.80 | $38.00 | $30.00 |
| 0140 | Optional base, base group 02 (0285-702) | SY | 1,406 | $20.55 | $20.00 | $16.40 | $25.00 | $35.00 |
| 0145 | Optional base, base group 09 (0285-709) | SY | 3,268 | $20.27 | $15.00 | $30.00 | $36.50 | $60.00 |
| 0150 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 126,017 | $0.50 | $1.50 | $2.25 | $3.30 | $3.00 |
| 0155 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 38,317 | $1.00 | $1.00 | $1.05 | $5.50 | $3.50 |
| 0160 | Milling existing asphalt pavement, 1/2" avg depth (0327-70-16) | SY | 1,836 | $1.00 | $1.00 | $1.45 | $3.00 | $10.00 |
| 0165 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 891 | $125.00 | $157.00 | $148.00 | $205.00 | $185.00 |
| 0170 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 17,260.40 | $131.83 | $157.00 | $150.00 | $172.00 | $185.00 |
| 0175 | Miscellaneous asphalt (0339-1) | TN | 88.10 | $256.13 | $300.00 | $405.00 | $390.00 | $350.00 |
| 0180 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 144 | $111.65 | $100.00 | $120.00 | $120.00 | $150.00 |
| 0185 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 27 | $197.06 | $120.00 | $135.00 | $600.00 | $200.00 |
| 0190 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 56 | $122.39 | $175.00 | $135.00 | $130.00 | $250.00 |
| 0195 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 35 | $211.62 | $210.00 | $220.00 | $208.00 | $250.00 |
| 0200 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 15 | $1,944.86 | $2,100.00 | $3,250.00 | $2,280.00 | $2,750.00 |
| 0205 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 2 | $2,927.13 | $2,500.00 | $3,600.00 | $2,670.00 | $3,500.00 |
| 0210 | Mitered end section , optional round, 36" side drain (0430-984138) | EACH | 2 | $7,417.82 | $6,500.00 | $9,000.00 | $6,500.00 | $7,000.00 |
| 0215 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 4 | $2,778.86 | $3,700.00 | $3,200.00 | $2,215.00 | $4,000.00 |
| 0220 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 2 | $5,621.03 | $4,000.00 | $4,000.00 | $2,800.00 | $4,000.00 |
| 0225 | Mitered end sect, replace (0430-990) | EACH | 3 | $3,180.73 | $4,000.00 | $6,900.00 | $1,450.00 | $5,000.00 |
| 0230 | Concrete curb & gutter, type F (0520-1-10) | LF | 211 | $57.75 | $75.00 | $79.00 | $65.00 | $85.00 |
| 0235 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 587 | $100.93 | $100.00 | $91.00 | $120.00 | $135.00 |
| 0240 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 203 | $123.36 | $130.00 | $200.00 | $135.50 | $150.00 |
| 0245 | Concrete ditch pavement, non reinforced, 6" (0524-1-4) | SY | 919 | $148.02 | $250.00 | $130.00 | $115.00 | $150.00 |
| 0250 | Detectable warnings (0527-2) | SF | 412 | $28.04 | $30.90 | $28.00 | $30.00 | $30.00 |
| 0255 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 285.20 | $147.74 | $150.00 | $125.00 | $155.00 | $200.00 |
| 0260 | Bedding stone (0530-74) | TN | 165.80 | $136.58 | $150.00 | $100.00 | $140.00 | $200.00 |
| 0265 | Guardrail -roadway, general (0536-1-1) | LF | 1,124 | $33.65 | $41.20 | $35.00 | $30.00 | $35.00 |
| 0270 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 6 | $4,485.47 | $5,665.00 | $4,500.00 | $4,200.00 | $4,500.00 |
| 0275 | Guardrail removal (0536-73) | LF | 1,062 | $3.36 | $5.15 | $3.43 | $2.00 | $3.50 |
| 0280 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $4,485.47 | $4,635.00 | $4,500.00 | $3,950.00 | $4,500.00 |
| 0285 | Performance turf, sod (0570-1-2) | SY | 24,120 | $3.20 | $6.00 | $3.90 | $4.50 | $3.75 |
| 0290 | Shoulder drop off soil (0570-13-1) | CY | 141.80 | $92.50 | $10.00 | $35.00 | $95.00 | $50.00 |
| 0295 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 14.28 | $841.03 | $1,400.00 | $1,600.00 | $890.00 | $1,600.00 |
| 0300 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,176 | $0.56 | $1.40 | $1.50 | $0.60 | $2.00 |
| 0305 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 187 | $2.30 | $1.60 | $1.75 | $0.60 | $2.00 |
| 0310 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,093 | $2.24 | $2.00 | $2.20 | $2.50 | $3.00 |
| 0315 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.04 | $897.09 | $618.00 | $690.00 | $950.00 | $700.00 |
| 0320 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.11 | $616.75 | $618.00 | $710.00 | $615.00 | $700.00 |
| 0325 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 24 | $11.22 | $46.35 | $50.00 | $12.00 | $50.00 |
| 0330 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 57 | $11.22 | $30.90 | $34.00 | $12.00 | $35.00 |
| 0335 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 12.14 | $1,682.04 | $1,442.00 | $1,600.00 | $1,800.00 | $1,550.00 |
| 0340 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,330 | $0.56 | $1.60 | $1.75 | $0.60 | $2.00 |
| 0345 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 3.54 | $897.09 | $618.00 | $670.00 | $950.00 | $675.00 |
| 0350 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.02 | $897.09 | $618.00 | $890.00 | $630.00 | $675.00 |
| 0355 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $44,017 | $44,017 | $44,017 | $44,017 | $44,017 |
| 0360 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $8,711.79 | $8,711.79 | $8,711.79 | $8,711.79 | $8,711.79 |
| 0365 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 13.87 | $2,803.41 | $2,900.00 | $2,800.00 | $3,000.00 | $3,200.00 |
| 0370 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 73 | $504.62 | $670.00 | $500.00 | $550.00 | $500.00 |
| 0375 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 3 | $2,242.73 | $2,575.00 | $2,300.00 | $2,400.00 | $2,500.00 |
| 0380 | Single column ground sign assembly, relocate (0700-1500) | EACH | 3 | $196.24 | $77.25 | $200.00 | $210.00 | $200.00 |
| 0385 | Single column ground sign assembly, remove (0700-1600) | EACH | 62 | $56.07 | $36.05 | $56.00 | $60.00 | $60.00 |
| 0390 | Sign panel, furnish & install single post bridge mount index 11870/700-012, UP to 12 SF (0700-3301) | EACH | 5 | $841.03 | $520.00 | $840.00 | $900.00 | $850.00 |
| 0395 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 42 | $28.04 | $46.35 | $28.00 | $30.00 | $30.00 |
| 0400 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 4 | $28.04 | $30.90 | $28.00 | $30.00 | $30.00 |
| 0405 | Enhanced highway sign solar powered, F&I ground mount, W/beacon, 12-20 SF of static sign panels (0700-142112) | EACH | 2 | $11,774 | $12,875 | $12,000 | $12,500 | $12,000 |
| 0410 | Enhanced highway sign solar powered, remove - mount (0700-142902) | EACH | 2 | $280.34 | $515.00 | $280.00 | $300.00 | $300.00 |
| 0415 | Object marker, type 2 (0705-10-2) | EACH | 17 | $56.07 | $309.00 | $56.00 | $60.00 | $60.00 |
| 0420 | Object marker, type 3 (0705-10-3) | EACH | 2 | $196.24 | $438.00 | $200.00 | $210.00 | $200.00 |
| 0425 | Raised pavement marker, type B (0706-1-3) | EACH | 2,854 | $5.61 | $4.89 | $5.30 | $6.00 | $5.50 |
| 0430 | Painted pavement markings, surface (0710-90) | LS | 1 | $62,516 | $41,200 | $46,000 | $70,000 | $45,000 |
| 0435 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,176 | $4.49 | $3.09 | $3.43 | $5.00 | $3.50 |
| 0440 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 187 | $5.61 | $4.28 | $4.65 | $6.00 | $5.00 |
| 0445 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 891 | $6.73 | $6.03 | $6.55 | $7.00 | $6.50 |
| 0450 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.11 | $2,691.28 | $4,635.00 | $5,200.00 | $2,700.00 | $5,000.00 |
| 0455 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 24 | $168.20 | $258.00 | $280.00 | $180.00 | $375.00 |
| 0460 | Thermoplastic, standard, arrow (0711-11170) | EACH | 57 | $100.93 | $88.00 | $95.00 | $110.00 | $95.00 |
| 0465 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,330 | $5.61 | $4.28 | $4.65 | $6.00 | $4.75 |
| 0470 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.02 | $2,691.28 | $4,635.00 | $6,700.00 | $1,900.00 | $5,000.00 |
| 0475 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 202 | $20.19 | $14.42 | $16.00 | $25.00 | $16.00 |
| 0480 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 14.28 | $5,606.84 | $4,996.00 | $5,500.00 | $6,200.00 | $5,400.00 |
| 0485 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.04 | $2,691.28 | $2,575.00 | $2,900.00 | $2,850.00 | $2,750.00 |
| 0490 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 12.14 | $5,606.84 | $5,000.00 | $5,400.00 | $6,200.00 | $5,500.00 |
| 0495 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 3.54 | $2,691.28 | $2,757.00 | $2,900.00 | $2,850.00 | $2,750.00 |
| 0500 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 1.82 | $31,959 | $36,050 | $40,000 | $36,500 | $38,500 |
| 0505 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 1.82 | $31,959 | $36,050 | $40,000 | $36,000 | $38,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.