FDOT contract T4752 bid tabulation
SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW.. Let by Florida DOT on September 24, 2025, Broward, District 4. 5 bids received; low bid $279,999 by Aum Construction Inc..
- Owner
- Florida DOT
- Letting
- 24 SEP 2025
- Pay items
- 24
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Aum Construction Inc. | $279,999 | Low |
| 2 | National Traffic Solution, Inc | $294,981 | +5.0% |
| 3 | Signal Technology and Installation Corp. | $319,104 | +14% |
| 4 | American Design Engineering Construction Inc. | $436,255 | +56% |
| 5 | Wrangler Construction Inc. | $566,072 | +102% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Aum Construction Inc. | 2. National Traffic Solution, Inc | 3. Signal Technology and Installation Corp. | 4. American Design Engineering Construction Inc. | 5. Wrangler Construction Inc. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $30,000 | $28,800 | $65,721 | $60,000 | $159,800 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $40,000 | $6,999.99 | $14,058 | $10,500 | $32,800 |
| 0015 | Work zone sign (0102-60) | ED | 2,244 | $0.50 | $0.33 | $0.40 | $2.00 | $0.31 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 2,040 | $0.30 | $0.14 | $0.17 | $1.00 | $0.19 |
| 0025 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,726 | $0.30 | $0.18 | $0.21 | $1.00 | $1.25 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 68 | $12.00 | $7.06 | $8.38 | $20.00 | $35.00 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 164 | $16.00 | $14.99 | $16.75 | $35.00 | $12.50 |
| 0040 | Removal of existing concrete (0110-4-10) | SY | 38 | $35.00 | $19.99 | $42.18 | $65.00 | $31.25 |
| 0045 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 38 | $110.00 | $85.00 | $65.01 | $90.00 | $150.00 |
| 0050 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $15,155 | $15,155 | $15,155 | $15,155 | $15,155 |
| 0055 | Conduit, furnish & install, open trench (0630-2-11) | LF | 20 | $30.00 | $21.18 | $25.87 | $35.00 | $35.00 |
| 0060 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 398 | $30.00 | $49.42 | $39.54 | $98.00 | $38.00 |
| 0065 | Fiber optic cable locator (0633-6) | DA | 68 | $150.00 | $300.00 | $197.68 | $500.00 | $325.00 |
| 0070 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 9 | $2,000.00 | $1,882.35 | $1,805.96 | $3,200.00 | $1,812.00 |
| 0075 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $7,500.00 | $6,999.99 | $7,981.12 | $7,650.00 | $9,375.00 |
| 0080 | Electrical service wire, & install (0639-2-1) | LF | 131 | $10.00 | $22.35 | $7.71 | $20.00 | $13.00 |
| 0085 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,500.00 | $3,294.11 | $3,004.12 | $3,000.00 | $4,373.00 |
| 0090 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,033 | $3.00 | $3.53 | $4.13 | $4.00 | $12.00 |
| 0095 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 2 | $16,000 | $25,882 | $23,687 | $27,650 | $19,800 |
| 0100 | Load center, remove, voltage (0715-7-41) | EACH | 2 | $1,500.00 | $1,647.06 | $2,811.66 | $2,000.00 | $4,811.00 |
| 0105 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 44 | $1,300.00 | $1,599.99 | $1,491.85 | $2,500.00 | $3,618.00 |
| 0110 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 1 | $15,043 | $15,294 | $13,968 | $16,000 | $14,500 |
| 0115 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 2 | $3,000.00 | $1,411.77 | $1,124.67 | $2,500.00 | $3,230.00 |
| 0120 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 3 | $750.00 | $1,352.94 | $996.58 | $1,500.00 | $2,186.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of September 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.