Heavy Civil Inc: FDOT bid record
Heavy Civil Inc submitted 16 bids on Florida DOT contracts in the data, from 30 JAN 2019 to 29 JUL 2026, and was the low bidder on 6 of them (38%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $4,068,991
- Latest bid
- 29 JUL 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 6 | 4 | 67% |
| 2020 | 5 | 1 | 20% |
| 2021 | 2 | 0 | 0% |
| 2022 | 1 | 1 | 100% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 10 | 2 | 20% |
| District 5 | 3 | 3 | 100% |
| District 1 | 2 | 1 | 50% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 13 | 5 (38%) | $0.15 | $0.13 |
| Inlet protection system | 0104-18 | EACH | 12 | 5 (42%) | $88.00 | $150.00 |
| Work zone sign | 0102-60 | ED | 13 | 4 (31%) | $0.25 | $0.25 |
| Removal of existing concrete | 0110-4-10 | SY | 11 | 4 (36%) | $13.70 | $33.96 |
| Thermoplastic, standard, solid, 12" for crosswalk and roundabout | 0711-11123 | LF | 10 | 4 (40%) | $2.25 | $3.25 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 9 | 4 (44%) | $39.00 | $65.00 |
| Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" | 0711-11141 | GM | 6 | 4 (67%) | $1,460.00 | $2,500.00 |
| Traffic control officer | 0102-14 | HR | 5 | 4 (80%) | $55.00 | $80.00 |
| Thermoplastic, standard, solid, 24" for stop line and crosswalk | 0711-11125 | LF | 11 | 3 (27%) | $4.50 | $6.09 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 11 | 3 (27%) | $51.00 | $86.00 |
| Single post sign, remove | 0700-1-60 | AS | 9 | 3 (33%) | $55.00 | $31.94 |
| Thermoplastic, standard-other surfaces, yellow, solid, 6" | 0711-16201 | GM | 8 | 3 (38%) | $6,150.00 | $5,200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hardrives of Delray, Inc. | 4 | 3 of 4 |
| Weekley Asphalt Paving, Inc. | 4 | 0 of 4 |
| Blacktip Services Incorporated | 4 | 0 of 4 |
| The Stout Group LLC | 4 | 1 of 4 |
| Roadway Construction, LLC | 3 | 0 of 3 |
| Ohl USA Inc | 3 | 0 of 3 |
| R & D Paving LLC | 3 | 2 of 3 |
| Wrangler Construction Inc. | 3 | 0 of 3 |
| Leon America Construction | 3 | 2 of 3 |
| Ranger Construction Industries, Inc. | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 JUL 2026 | T4747 | District 4 | SR 5 (S FEDERAL HWY) FROM SR 5 (US1 / N DIXIE HWY) TO 10TH AVE S | 3 of 6 | $900,814 | +9.0% |
| 10 JUN 2026 | T4766 | District 4 | SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1) | 3 of 8 | $1,348,260 | +7.0% |
| 25 MAY 2022 | T4623 | District 4 | TRAFFIC CALMING ENHANCEMENTS | 1 of 1 | $928,651 | Low |
| 26 MAY 2021 | T4567 | District 4 | HOMEWOOD BLVD | 2 of 6 | $2,637,000 | +5.0% |
| 27 JAN 2021 | T4571 | District 4 | GEORGE BUSH BLVD (NE 8TH ST) | 2 of 10 | $2,150,000 | +6.0% |
| 26 AUG 2020 | T4528 | District 4 | SR 5 (US 1) | 2 of 4 | $593,560 | +8.0% |
| 29 JUL 2020 | T4553 | District 4 | NE 5TH AVE | 5 of 6 | $580,435 | +34% |
| 29 APR 2020 | T7452 | District 7 | PLEASANT GROVE ELEMENTARY SIDEWALK | 4 of 7 | $620,000 | +16% |
| 29 JAN 2020 | T4514 | District 4 | POMPANO BEACH MOBILITY SIDEWALKS | 4 of 6 | $320,991 | +15% |
| 29 JAN 2020 | T5618 | District 5 | CLARCONA-OCOEE CONNECTOR TRAIL | 1 of 4 | $249,700 | Low, 2.0% under the second |
| 04 DEC 2019 | T4532 | District 4 | CLINT MOORE RD | 1 of 5 | $291,936 | Low, 8.0% under the second |
| 04 DEC 2019 | T4533 | District 4 | HAMLIN BLVD | 5 of 7 | $329,808 | +10% |
| 04 DEC 2019 | T5674 | District 5 | SR 326 | 1 of 2 | $1,194,208 | Low, 1.0% under the second |
| 25 SEP 2019 | T1766 | District 1 | WEST HICKORY ST | 1 of 6 | $305,000 | Low, 10% under the second |
| 31 JUL 2019 | T5673 | District 5 | SR A1A | 1 of 4 | $1,099,497 | Low, 7.0% under the second |
| 30 JAN 2019 | T1749 | District 1 | SR 70 AND POTTER RD | 2 of 4 | $351,339 | +5.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.