FDOT contract T4766 bid tabulation
SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1). Let by Florida DOT on June 10, 2026, Broward, District 4. 8 bids received; low bid $1,262,233 by Florida Engineering & Development Corp.
- Owner
- Florida DOT
- Letting
- 10 JUN 2026
- Pay items
- 91
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Florida Engineering & Development Corp | $1,262,233 | Low |
| 2 | The Stout Group LLC | $1,271,127 | +1.0% |
| 3 | Heavy Civil Inc | $1,348,260 | +7.0% |
| 4 | Weekley Asphalt Paving, Inc. | $1,433,226 | +14% |
| 5 | R & D Paving LLC | $1,460,424 | +16% |
| 6 | Ranger Construction Industries, Inc. | $1,595,655 | +26% |
| 7 | General Asphalt Company, LLC | $1,691,787 | +34% |
| 8 | Horsepower Electric, Inc. | $1,923,992 | +52% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Florida Engineering & Development Corp | 2. The Stout Group LLC | 3. Heavy Civil Inc | 4. Weekley Asphalt Paving, Inc. | 5. R & D Paving LLC | 6. Ranger Construction Industries, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $125,728 | $120,000 | $105,000 | $96,050 | $200,000 | $321,390 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $88,219 | $71,500 | $45,000 | $192,196 | $65,000 | $180,331 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $2,096.86 | $6,000.00 | $4,000.00 | $27,827 | $1,355.00 | $1,630.00 |
| 0020 | Traffic control officer (0102-14) | HR | 128 | $76.13 | $90.00 | $100.00 | $90.00 | $105.00 | $84.30 |
| 0025 | Work zone sign (0102-60) | ED | 9,528 | $0.19 | $0.19 | $0.25 | $0.30 | $0.20 | $0.21 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 670 | $35.53 | $35.00 | $51.00 | $39.00 | $38.50 | $47.15 |
| 0035 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 376 | $18.27 | $18.00 | $35.00 | $29.00 | $19.80 | $24.25 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 8,582 | $0.14 | $0.14 | $0.12 | $0.10 | $0.15 | $0.16 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,812 | $0.15 | $0.15 | $0.10 | $0.05 | $0.20 | $0.17 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 308 | $5.18 | $5.10 | $6.00 | $5.00 | $5.65 | $5.75 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 308 | $10.15 | $10.00 | $11.00 | $10.15 | $11.00 | $11.25 |
| 0060 | Temporary signalization and maintenance, intersection (0102-104) | ED | 308 | $7.08 | $6.98 | $10.00 | $6.98 | $7.70 | $7.85 |
| 0065 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 308 | $7.08 | $6.98 | $10.00 | $6.98 | $7.70 | $7.85 |
| 0070 | Type III barricade (0102-115) | ED | 540 | $0.29 | $0.29 | $0.50 | $0.30 | $0.35 | $0.35 |
| 0075 | Inlet protection system (0104-18) | EACH | 24 | $108.93 | $100.00 | $975.00 | $160.00 | $181.25 | $101.25 |
| 0080 | Litter removal (0107-1) | ACRE | 4.85 | $204.61 | $1.00 | $0.50 | $100.00 | $2,165.00 | $37.42 |
| 0085 | Mowing (0107-2) | ACRE | 0.27 | $1,489.37 | $1.00 | $1,000.00 | $200.00 | $27,000 | $53.45 |
| 0090 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $10,150 | $5,000.00 | $10,000 | $15,300 | $13,090 | $13,372 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $12,158 | $15,000 | $80,000 | $52,123 | $50,000 | $17,900 |
| 0100 | Removal of existing concrete (0110-4-10) | SY | 1,076 | $37.35 | $20.00 | $17.00 | $41.00 | $39.60 | $16.18 |
| 0105 | Regular excavation (0120-1) | CY | 282.70 | $84.54 | $60.00 | $33.00 | $66.00 | $79.95 | $33.20 |
| 0110 | Type B stabilization (0160-4) | SY | 951 | $9.28 | $25.00 | $0.01 | $28.14 | $36.70 | $34.92 |
| 0115 | Optional base, base group 01 (0285-701) | SY | 242 | $57.41 | $75.00 | $81.00 | $79.00 | $65.20 | $63.00 |
| 0120 | Optional base, base group 11 (0285-711) | SY | 420 | $37.60 | $95.00 | $84.00 | $58.00 | $83.10 | $53.50 |
| 0125 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 13,548 | $3.81 | $3.50 | $4.11 | $3.00 | $4.25 | $6.25 |
| 0130 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 69.40 | $203.86 | $300.00 | $300.00 | $300.00 | $293.50 | $390.62 |
| 0135 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1,152.10 | $231.42 | $225.00 | $247.00 | $210.00 | $204.50 | $209.15 |
| 0140 | Plain cement concrete 8" (0350-3-5) | SY | 242 | $288.16 | $200.00 | $150.00 | $165.00 | $128.30 | $110.70 |
| 0145 | Grinding concrete pavement (0352-70) | SY | 3,189 | $8.12 | $10.00 | $5.50 | $14.00 | $15.00 | $11.30 |
| 0150 | Manhole, adjust (0425-5) | EACH | 7 | $984.64 | $950.00 | $975.00 | $1,250.00 | $1,000.00 | $730.35 |
| 0155 | Concrete curb & gutter, type F (0520-1-10) | LF | 212 | $44.72 | $40.00 | $55.00 | $50.00 | $66.25 | $60.10 |
| 0160 | Concrete curb, type D (0520-2-4) | LF | 337 | $37.64 | $30.00 | $40.00 | $45.00 | $46.20 | $34.15 |
| 0165 | Concrete traffic separator, special- variable width (0520-70) | SY | 253 | $103.52 | $200.00 | $140.00 | $203.56 | $109.70 | $83.15 |
| 0170 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 167 | $85.95 | $150.00 | $125.00 | $75.00 | $123.50 | $126.20 |
| 0175 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 26 | $77.06 | $200.00 | $175.00 | $266.67 | $358.00 | $113.00 |
| 0180 | Detectable warnings (0527-2) | SF | 67 | $33.36 | $40.00 | $40.00 | $46.00 | $42.00 | $44.95 |
| 0185 | Performance turf, sod (0570-1-2) | SY | 210 | $5.97 | $20.00 | $17.00 | $16.50 | $38.15 | $45.85 |
| 0190 | Conduit, furnish & install, open trench (0630-2-11) | LF | 31 | $19.12 | $18.84 | $20.00 | $18.84 | $20.75 | $21.20 |
| 0195 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 13 | $32.47 | $31.99 | $33.60 | $31.99 | $35.20 | $35.95 |
| 0200 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,448.35 | $1,426.94 | $4,500.00 | $1,426.94 | $1,570.00 | $1,604.00 |
| 0205 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 3 | $2,152.88 | $2,121.06 | $2,350.00 | $2,121.06 | $2,334.00 | $2,384.00 |
| 0210 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 3 | $2,155.84 | $2,123.98 | $4,400.00 | $2,123.98 | $2,337.00 | $2,390.00 |
| 0215 | Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132) | EACH | 1 | $6,956.56 | $6,853.75 | $12,000 | $6,853.75 | $7,540.00 | $7,702.00 |
| 0220 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.30 | $1,607.77 | $999.00 | $3,000.00 | $999.00 | $2,750.00 | $1,123.00 |
| 0225 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0230 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 3 | $705.43 | $600.00 | $1,000.00 | $730.00 | $770.00 | $820.25 |
| 0235 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $2,588.25 | $1,900.00 | $4,000.00 | $2,155.00 | $3,300.00 | $2,422.00 |
| 0240 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $10.15 | $150.00 | $300.00 | $50.00 | $27.50 | $56.20 |
| 0245 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 1 | $5,582.50 | $4,900.00 | $8,000.00 | $1,400.00 | $8,250.00 | $6,140.00 |
| 0250 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $507.50 | $750.00 | $1,500.00 | $1,260.00 | $2,200.00 | $1,420.00 |
| 0255 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $71.05 | $150.00 | $200.00 | $70.00 | $27.50 | $78.70 |
| 0260 | Raised pavement marker, type B (0706-1-3) | EACH | 293 | $5.08 | $4.00 | $5.00 | $5.00 | $6.60 | $5.65 |
| 0265 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 12 | $4.06 | $10.00 | $6.00 | $3.50 | $11.00 | $3.95 |
| 0270 | Painted pavement markings, surface (0710-90) | LS | 1 | $8,272.02 | $7,500.00 | $8,000.00 | $10,551 | $11,000 | $11,900 |
| 0275 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 1,518 | $2.23 | $3.00 | $3.50 | $1.95 | $4.40 | $2.20 |
| 0280 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 367 | $3.35 | $4.50 | $5.00 | $2.95 | $5.50 | $3.32 |
| 0285 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 93 | $4.47 | $5.00 | $9.00 | $3.95 | $8.80 | $4.45 |
| 0290 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.10 | $2,334.47 | $2,250.00 | $3,000.00 | $1,450.00 | $4,950.00 | $1,582.00 |
| 0295 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 4 | $121.80 | $100.00 | $75.00 | $200.00 | $330.00 | $225.00 |
| 0300 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.10 | $5,895.15 | $2,250.00 | $3,000.00 | $1,450.00 | $4,950.00 | $1,512.00 |
| 0305 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,564 | $19.29 | $18.00 | $16.50 | $18.00 | $17.60 | $20.22 |
| 0310 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.77 | $5,895.12 | $6,300.00 | $6,500.00 | $4,335.00 | $8,250.00 | $4,821.00 |
| 0315 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.50 | $6,163.08 | $7,500.00 | $8,500.00 | $5,200.00 | $9,350.00 | $5,800.00 |
| 0320 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.73 | $2,334.51 | $2,250.00 | $2,000.00 | $2,350.00 | $4,950.00 | $2,641.00 |
| 0325 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.01 | $4,669.23 | $2,500.00 | $3,200.00 | $6,635.00 | $8,800.00 | $5,740.00 |
| 0330 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.51 | $5,895.12 | $6,300.00 | $6,000.00 | $4,335.00 | $8,250.00 | $4,795.00 |
| 0335 | Conduit, furnish & install, open trench (0630-2-11) | LF | 139 | $16.47 | $16.23 | $17.00 | $16.23 | $17.85 | $18.25 |
| 0340 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 768 | $34.37 | $33.86 | $34.00 | $33.86 | $37.25 | $38.05 |
| 0345 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 20 | $46.59 | $45.90 | $46.00 | $45.90 | $50.50 | $51.60 |
| 0350 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $8,204.85 | $8,083.59 | $8,200.00 | $8,083.59 | $8,892.00 | $9,083.00 |
| 0355 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $810.01 | $798.04 | $820.00 | $798.04 | $878.00 | $897.00 |
| 0360 | Fiber optic cable locator (0633-6) | DA | 154 | $167.48 | $165.00 | $200.00 | $165.00 | $181.50 | $185.40 |
| 0365 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 15 | $1,448.34 | $1,426.94 | $1,600.00 | $1,426.94 | $1,570.00 | $1,604.00 |
| 0370 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $2,643.80 | $2,604.73 | $2,800.00 | $2,604.73 | $2,866.00 | $2,930.00 |
| 0375 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 1 | $5,662.79 | $5,579.10 | $5,700.00 | $5,579.10 | $6,137.00 | $6,270.00 |
| 0380 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $5,308.16 | $5,229.71 | $6,000.00 | $5,229.71 | $5,753.00 | $5,880.00 |
| 0385 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 2 | $405.01 | $399.02 | $500.00 | $399.02 | $439.00 | $448.35 |
| 0390 | Aluminum signals pole, (0646-1-11) | EACH | 16 | $2,270.74 | $2,237.18 | $2,500.00 | $2,237.18 | $2,461.00 | $2,514.00 |
| 0395 | Aluminum signals pole, remove (0646-1-60) | EACH | 4 | $607.51 | $598.53 | $700.00 | $598.53 | $659.00 | $673.00 |
| 0400 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 1 | $2,188.62 | $2,156.28 | $2,400.00 | $2,156.28 | $2,732.00 | $2,423.00 |
| 0405 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 2 | $303.76 | $299.27 | $300.00 | $299.27 | $330.00 | $337.00 |
| 0410 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 17 | $759.64 | $748.41 | $1,000.00 | $748.41 | $824.00 | $841.00 |
| 0415 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 16 | $1,002.20 | $987.39 | $1,100.00 | $987.39 | $1,087.00 | $1,110.00 |
| 0420 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 10 | $202.50 | $199.51 | $300.00 | $199.51 | $220.00 | $225.00 |
| 0425 | Vehicle detection system- adjust/modify cabinet (0660-4-51) | EACH | 2 | $1,924.28 | $1,895.84 | $2,000.00 | $1,895.84 | $2,086.00 | $2,131.00 |
| 0430 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 16 | $415.28 | $409.14 | $500.00 | $409.14 | $451.00 | $460.00 |
| 0435 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 10 | $101.26 | $99.76 | $120.00 | $99.76 | $109.75 | $112.10 |
| 0440 | Traffic controller, modify (0671-2-40) | EACH | 2 | $2,329.29 | $2,294.86 | $2,300.00 | $2,294.86 | $2,525.00 | $2,580.00 |
| 0445 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 2 | $2,329.29 | $2,294.86 | $2,500.00 | $2,294.86 | $2,525.00 | $2,580.00 |
| 0450 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 6 | $202.50 | $199.51 | $220.00 | $199.51 | $220.00 | $225.00 |
| 0455 | Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360) | EACH | 2 | $6,584.83 | $6,487.51 | $7,000.00 | $6,487.51 | $7,137.00 | $7,290.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 10, 2026. Compiled by Mirage Metrics.