FDOT letting results, August 31, 2022
12 contracts let by Florida DOT on August 31, 2022, $33,268,041 in low bids, a median of 3.5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 12
- Low bids, total
- $33,268,041
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T4624 | SR 93 (I-75) | District 4 | 8 | Halley Engineering Contractors, Inc. | $12,698,955 | $14,652,079 | +15% | FDOT |
| T7497 | SR 687 (US 92) (4TH ST N) | District 7 | 4 | Preferred Materials Inc. | $7,112,946 | $8,691,506 | +22% | FDOT |
| T7481 | SR 39 (ALEXANDER ST) | District 7 | 4 | C.W. Roberts Contracting, Inc. | $3,304,021 | $3,684,644 | +12% | FDOT |
| T6543 | SR 93 (I-75) RAMPS | District 6 | 7 | Ohla USA Inc | $2,810,000 | $2,951,057 | +5.0% | FDOT |
| T3819 | SR 8 (I-10) EB | District 3 | 1 | Anderson Columbia Co., Inc. | $2,236,764 | FDOT | ||
| T5763 | SR A1A | District 5 | 4 | Halifax Paving, Inc. | $1,690,095 | $1,981,558 | +17% | FDOT |
| T2928 | SR 212 (US 90) (BEACH BLVD) | District 2 | 3 | American Lighting and Signalization, LLC. | $1,070,183 | $1,397,670 | +31% | FDOT |
| T2887 | SR 5 (US 17) | District 2 | 1 | Aj General Construction Services, Inc. | $782,704 | FDOT | ||
| T2880 | SR 93 (I-75) NB OFF RAMP AND SR 24 (SW ARCHER RD) | District 2 | 1 | American Lighting and Signalization, LLC. | $621,970 | FDOT | ||
| T3817 | CR 177A | District 3 | 2 | Anderson Columbia Co., Inc. | $535,084 | $687,495 | +28% | FDOT |
| T2923 | SR 13 (SAN JOSE BLVD) | District 2 | 4 | Aj General Construction Services, Inc. | $212,969 | $229,115 | +8.0% | FDOT |
| T3833 | SR 97 | District 3 | 3 | Aj General Construction Services, Inc. | $192,351 | $277,277 | +44% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.