FDOT contract T7580 bid tabulation
SR 574 (W REYNOLDS ST) FROM E OF SR 39 TO W OF US 92. Let by Florida DOT on January 28, 2026, Hillsborough, District 7. 4 bids received; low bid $809,030 by Aj General Construction Services, Inc..
- Owner
- Florida DOT
- Letting
- 28 JAN 2026
- Pay items
- 57
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Aj General Construction Services, Inc. | $809,030 | Low |
| 2 | Cathcart Construction Company - Florida, LLC | $1,185,026 | +46% |
| 3 | Kamminga & Roodvoets, Inc. | $1,328,355 | +64% |
| 4 | Blacktip Services Incorporated | $1,834,535 | +127% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Aj General Construction Services, Inc. | 2. Cathcart Construction Company - Florida, LLC | 3. Kamminga & Roodvoets, Inc. | 4. Blacktip Services Incorporated |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $93,500 | $90,000 | $205,000 | $143,982 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $33,000 | $29,000 | $39,000 | $75,000 |
| 0015 | Work zone sign (0102-60) | ED | 9,660 | $0.27 | $1.00 | $0.30 | $0.50 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 3,324 | $0.20 | $1.00 | $0.11 | $0.25 |
| 0025 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 2,400 | $0.20 | $1.00 | $0.10 | $0.50 |
| 0030 | Portable changeable message sign, temporary (0102-99) | ED | 870 | $12.65 | $18.00 | $10.50 | $60.00 |
| 0035 | Type III barricade (0102-115) | ED | 800 | $0.60 | $1.00 | $0.26 | $2.00 |
| 0040 | Sediment barrier (0104-10-3) | LF | 257 | $8.95 | $7.00 | $7.00 | $50.00 |
| 0045 | Floating turbidity barrier (0104-11) | LF | 30 | $36.70 | $50.00 | $20.00 | $85.00 |
| 0050 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 42 | $39.70 | $20.00 | $15.00 | $150.00 |
| 0055 | Soil tracking prevention device (0104-15) | EACH | 2 | $2,165.00 | $9,000.00 | $1,900.00 | $5,500.00 |
| 0060 | Inlet protection system (0104-18) | EACH | 4 | $197.90 | $250.00 | $225.00 | $155.00 |
| 0065 | Litter removal (0107-1) | ACRE | 0.22 | $4,527.00 | $50.00 | $3,800.00 | $300.00 |
| 0070 | Mowing (0107-2) | ACRE | 0.19 | $4,510.00 | $50.00 | $1,200.00 | $350.00 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $8,800.00 | $235,000 | $330,300 | $178,654 |
| 0080 | Removal of existing concrete (0110-4-10) | SY | 93 | $38.35 | $25.00 | $18.00 | $84.00 |
| 0085 | Tree protection barrier (0110-21) | LF | 27 | $17.80 | $20.00 | $20.00 | $175.00 |
| 0090 | Regular excavation (0120-1) | CY | 152 | $45.00 | $90.00 | $64.00 | $47.00 |
| 0095 | Embankment (0120-6) | CY | 3 | $85.65 | $90.00 | $59.00 | $58.00 |
| 0100 | Type B stabilization (0160-4) | SY | 194 | $55.00 | $93.00 | $26.00 | $93.00 |
| 0105 | Optional base, base group 09 (0285-709) | SY | 179 | $45.00 | $100.00 | $58.00 | $168.00 |
| 0110 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 544 | $19.80 | $20.00 | $17.00 | $75.00 |
| 0115 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 29.50 | $220.00 | $670.00 | $296.00 | $1,400.00 |
| 0120 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 58.30 | $231.00 | $400.00 | $239.00 | $1,250.00 |
| 0125 | Concrete class II, culverts (0400-2-1) | CY | 115.70 | $2,473.40 | $2,980.00 | $2,950.00 | $4,300.00 |
| 0130 | Reinforcing steel- roadway (0415-1-1) | LB | 11,311 | $3.85 | $2.00 | $3.50 | $7.00 |
| 0135 | Inlets, curb, type 8, <10' (0425-1481) | EACH | 4 | $13,215 | $12,000 | $14,000 | $10,000 |
| 0140 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 48 | $202.10 | $550.00 | $190.00 | $900.00 |
| 0145 | Bullet rail, single rail (0515-4-1) | LF | 91 | $82.50 | $100.00 | $51.00 | $200.00 |
| 0150 | Concrete curb, type D (0520-2-4) | LF | 143 | $54.25 | $75.00 | $48.00 | $95.00 |
| 0155 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 91 | $192.50 | $240.00 | $510.00 | $400.00 |
| 0160 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 46 | $333.25 | $500.00 | $910.00 | $1,200.00 |
| 0165 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 97 | $98.50 | $105.00 | $100.00 | $90.00 |
| 0170 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 50 | $153.75 | $120.00 | $200.00 | $135.00 |
| 0175 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 9.60 | $286.00 | $350.00 | $530.00 | $130.00 |
| 0180 | Performance turf, sod (0570-1-2) | SY | 16 | $25.05 | $10.00 | $30.00 | $40.00 |
| 0185 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.03 | $7,007.00 | $6,300.00 | $2,000.00 | $10,000 |
| 0190 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.03 | $7,007.00 | $6,300.00 | $2,000.00 | $10,000 |
| 0195 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $33,500 | $33,500 | $33,500 | $33,500 |
| 0200 | Raised pavement marker, type B (0706-1-3) | EACH | 16 | $12.65 | $25.00 | $5.00 | $20.00 |
| 0205 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,850.00 | $3,400.00 | $2,500.00 | $25,000 |
| 0210 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 2 | $295.35 | $600.00 | $500.00 | $500.00 |
| 0215 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.11 | $11,407 | $14,000 | $10,000 | $40,000 |
| 0220 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.11 | $11,957 | $14,000 | $10,000 | $45,000 |
| 0225 | Non shrink grout, F&I, miscellaneous- structures rehab (0400-153) | CF | 37 | $282.80 | $275.00 | $100.00 | $745.00 |
| 0230 | Bedding stone (0530-74) | TN | 3 | $341.00 | $550.00 | $220.00 | $333.00 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 33 | $25.03 | $10.00 | $30.00 | $40.00 |
| 0240 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0245 | Utility pipe,remove & dispose, 5- 7.9" (1050-16003) | LF | 60 | $30.80 | $50.00 | $30.00 | $127.00 |
| 0250 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 80 | $55.00 | $70.00 | $30.00 | $193.00 |
| 0255 | Utility pipe,plug & place out of service, 5- 7.9" (1050-18003) | LF | 188 | $60.50 | $25.00 | $35.00 | $94.00 |
| 0260 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31208) | LF | 50 | $93.50 | $400.00 | $250.00 | $1,000.00 |
| 0265 | Utility structure, below ground, F&I, water/sewer, 0 - 80 FT3, 0 - 6' (1060-11211) | EACH | 2 | $11,000 | $5,900.00 | $8,000.00 | $20,000 |
| 0270 | Utility structure, below ground, adjust/modify (1060-15) | EACH | 2 | $2,750.00 | $15,000 | $6,000.00 | $20,000 |
| 0275 | Utility structure, furnish and install- replace existing rim (1060-31-1) | EACH | 2 | $3,850.00 | $2,000.00 | $750.00 | $7,500.00 |
| 0280 | Utility structure, furnish and install- replace existing cover (1060-31-2) | EACH | 2 | $3,850.00 | $1,500.00 | $300.00 | $7,500.00 |
| 0285 | Utility fixture, valve/meter box, remove (1080-21600) | EACH | 4 | $880.00 | $1,000.00 | $200.00 | $4,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.