FDOT contract T5894 bid tabulation

SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD. Let by Florida DOT on October 28, 2026, Orange, District 5. 5 bids received; low bid $2,495,000 by Aum Construction Inc..

Owner
Florida DOT
Letting
28 OCT 2026
Pay items
109
Data through
28 OCT 2026

Bidders

FDOT contract T5894: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Aum Construction Inc.2. Signal Technology and Installation Corp.3. Traffic Engineering and Management, LLC4. American Design Engineering Construction Inc.5. Blacktip Services Incorporated
0005Mobilization (0101-1)LS1$102,044$237,865$198,000$270,000$340,000
0010Maintenance of traffic (0102-1)DA1$120,000$49,519$82,000$45,000$45,000
0015Pedestrian or bicycle special detour (0102-4-1)SY1$25,000$13,425$29,500$35,000$10,000
0020Pedestrian escort/flagger (0102-5)HR70$60.00$65.57$70.00$95.00$45.00
0025Work zone sign (0102-60)ED4,607$0.50$0.27$0.50$2.00$0.24
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED31,560$0.25$0.12$0.25$2.00$0.20
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD77,310$0.20$0.10$0.15$2.00$0.08
0040Arrow board / advance warning arrow panel (0102-76)ED345$10.00$7.22$10.00$35.00$5.60
0045Portable changeable message sign, temporary (0102-99)ED628$15.00$13.12$15.00$35.00$12.00
0050Temporary signalization and maintenance, intersection (0102-104)ED600$20.00$18.80$10.00$175.00$30.36
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED600$20.00$18.80$10.00$175.00$31.68
0060Type III barricade (0102-115)ED488$1.00$0.40$0.75$2.00$0.30
0065Sediment barrier (0104-10-3)LF48$10.00$124.24$12.00$15.00$6.00
0070Inlet protection system (0104-18)EACH39$150.00$124.24$185.00$100.00$40.00
0075Litter removal (0107-1)ACRE35.22$50.00$31.06$100.00$200.00$40.00
0080Mowing (0107-2)ACRE23.99$60.00$62.12$100.00$100.00$40.00
0085Clearing & grubbing (0110-1-1)ACRE1$20,000$9,317.70$18,000$35,000$230,000
0090Removal of existing concrete (0110-4-10)SY1,167$32.00$72.06$54.00$25.00$50.00
0095Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY14,194$8.00$5.63$11.50$12.00$12.60
0100Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN1,171$300.00$270.58$438.00$275.00$355.60
0105Concrete curb & gutter, type E (0520-1-7)LF61$40.00$64.61$70.00$45.00$40.00
0110Concrete curb & gutter, type F (0520-1-10)LF1,163$40.00$55.91$34.00$42.00$36.00
0115Traffic separator concrete- type I, 8.5' wide (0520-5-16)LF42$125.00$124.24$220.00$250.00$90.00
0120Concrete traffic separator, special- variable width (0520-70)SY115$150.00$113.06$150.00$250.00$105.00
0125Concrete sidewalk and driveways, 6" thick (0522-2)SY962$120.00$136.66$103.00$85.00$82.00
0130Detectable warnings (0527-2)SF777$40.00$55.91$35.00$25.00$30.00
0135Performance turf, sod (0570-1-2)SY624$20.00$9.94$18.00$9.00$8.00
0140Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000
0145Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH29$750.00$780.28$850.00$750.00$728.00
0150Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH17$2,500.00$2,426.06$3,200.00$1,560.00$2,912.00
0155Single column ground sign assembly, relocate (0700-1500)EACH3$500.00$393.42$295.00$250.00$280.00
0160Single column ground sign assembly, remove (0700-1600)EACH34$50.00$65.57$55.00$200.00$56.00
0165Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH21$150.00$131.14$130.00$60.00$140.00
0170Tubular marker, 36" white post (0704-1-3)EACH4$250.00$308.18$280.00$85.00$280.00
0175Tubular marker, 36" yellow (0704-1-4)EACH4$250.00$308.18$280.00$85.00$280.00
0180Object marker, type 3 (0705-10-3)EACH9$450.00$491.77$280.00$450.00$336.00
0185Raised pavement marker, type B (0706-1-3)EACH363$6.50$5.91$7.50$5.00$6.75
0190Painted pavement markings, surface (0710-90)LS1$19,500$11,147$14,000$15,000$13,440
0195Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.02$25,000$12,118$12,500$6,500.00$10,080
0200Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,728$5.50$5.25$6.00$3.00$6.75
0205Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF22$6.50$7.22$8.00$6.00$9.00
0210Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF670$8.00$9.18$11.50$5.00$11.20
0215Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.17$8,000.00$1,967.13$4,500.00$6,500.00$6,720.00
0220Thermoplastic, standard, message or symbol (0711-11160)EACH3$400.00$262.28$240.00$300.00$280.00
0225Thermoplastic, standard, arrow (0711-11170)EACH24$150.00$144.26$140.00$300.00$90.00
0230Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF29$10.00$7.22$8.50$6.00$9.00
0235Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.17$8,000.00$2,098.37$4,500.00$6,500.00$6,720.00
0240Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,263$20.50$19.68$21.00$8.00$22.40
0245Thermoplastic, preformed, white, message (0711-14160)EACH6$300.00$262.28$350.00$375.00$280.00
0250Thermoplastic, preformed, white, arrow (0711-14170)EACH6$150.00$229.50$215.00$375.00$280.00
0255Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.89$7,800.00$10,386$8,000.00$6,500.00$8,064.00
0260Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.10$10,000$1,836.19$2,000.00$6,500.00$2,800.00
0265Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.33$7,800.00$10,386$8,000.00$6,500.00$8,064.00
0270Conduit, furnish & install, open trench (0630-2-11)LF506$40.00$24.41$30.00$30.00$32.85
0275Conduit, furnish & install, directional bore (0630-2-12)LF1,100$60.00$32.79$46.00$45.00$52.80
0280Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$15,000$14,085$19,750$18,000$25,401
0285Signal cable, remove- intersection (0632-7-6)PI2$500.00$2,013.80$1,350.00$2,750.00$7,913.00
0290Span wire assembly, F&I, two point, box or drop box (0634-4153)PI1$18,000$17,085$12,800$8,600.00$19,065
0295Span wire assembly, remove- poles remain (0634-4600)PI1$2,000.00$4,027.60$1,550.00$8,600.00$3,956.00
0300Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH2$1,500.00$1,713.43$1,950.00$2,750.00$3,337.00
0305Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH30$1,900.00$2,044.12$2,400.00$2,750.00$3,654.00
0310Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$7,000.00$6,240.61$5,750.00$7,500.00$5,804.00
0315Electrical service wire, & install (0639-2-1)LF52$20.00$6.58$15.00$15.00$19.46
0320Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$2,500.00$5,398.72$1,400.00$3,000.00$2,968.00
0325Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,800.00$5,345.07$3,000.00$2,600.00$3,298.00
0330Aluminum signals pole, (0646-1-11)EACH23$2,000.00$4,643.48$3,050.00$3,300.00$4,353.00
0335Aluminum signals pole, remove (0646-1-60)EACH2$500.00$134.26$325.00$900.00$1,978.00
0340Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH2$95,000$86,636$93,500$2,100.00$77,964
0345Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS40$1,850.00$1,846.91$2,625.00$3,400.00$3,430.00
0350Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS4$2,100.00$1,942.47$2,800.00$3,500.00$3,562.00
0355Vehicular traffic signal, remove- poles to remain (0650-1-60)AS26$500.00$134.26$250.00$450.00$495.00
0360Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS20$1,500.00$989.28$1,350.00$1,250.00$1,059.00
0365Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS1$2,000.00$1,820.56$2,600.00$2,600.00$1,682.00
0370Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS12$250.00$134.26$245.00$800.00$989.00
0375Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH3$25,000$23,338$30,000$32,000$25,851
0380Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH11$5,000.00$12,438$3,300.00$9,950.00$10,625
0385Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH1$12,000$8,780.23$9,250.00$9,950.00$8,618.00
0390Signal priority & preemption system, relocate (0663-1400)EACH2$1,500.00$1,016.00$1,900.00$1,700.00$3,068.00
0395Pedestrian detector, furnish & install, standard (0665-1-11)EACH22$500.00$567.39$665.00$800.00$1,568.00
0400Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH12$50.00$134.26$160.00$250.00$1,483.00
0405Traffic controller assembly, F&I, NEMA W/standard lock, W/concrete riser, 1 preemption (0670-5166)AS2$65,000$44,916$54,000$56,000$35,640
0410Traffic controller assembly, remove controller with (0670-5600)AS1$1,500.00$2,416.56$1,400.00$1,600.00$1,978.00
0415Traffic controller, modify (0671-2-40)EACH1$2,500.00$5,720.91$2,150.00$2,800.00$2,770.00
0420Traffic signal controller cabinet, adjust/modify (0676-1500)EACH1$5,000.00$7,063.43$3,850.00$2,500.00$2,506.00
0425Managed field ethernet switch, furnish & install (0684-1-1)EACH2$6,000.00$3,532.80$4,675.00$2,850.00$4,506.00
0430Uninterruptible power supply, furnish and install, online/double conversion with cabinet (0685-1-14)EACH2$17,000$17,798$18,000$9,800.00$13,200
0435Remote power management rpmu, furnish and install (0685-2-1)EACH2$1,000.00$888.72$1,350.00$1,500.00$1,184.00
0440Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH5$1,200.00$745.61$1,200.00$1,500.00$1,913.00
0445Sign panel, remove, UP to 12 SF (0700-3601)EACH22$100.00$67.13$85.00$650.00$495.00
0450Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH9$5,500.00$5,715.83$7,200.00$9,850.00$6,327.00
0455Internally illuminated sign, remove (0700-5-60)EACH8$500.00$537.02$325.00$3,500.00$989.00
0460Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH8$10,000$9,262.32$6,800.00$9,500.00$7,785.00
0465Itsfm subsurface documentation- project length (0611-1-1)MI0.97$4,300.00$4,099.81$4,000.00$45,000$4,356.00
0470Itsfm location documentation- intersection (0611-2-1)EACH3$3,000.00$2,795.31$2,750.00$3,500.00$3,102.00
0475Conduit, furnish & install, open trench (0630-2-11)LF1,165$25.00$28.76$26.50$26.00$32.65
0480Conduit, furnish & install, directional bore (0630-2-12)LF180$35.00$37.28$30.00$44.00$52.80
0485Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF332$4.50$4.17$6.00$10.00$4.42
0490Fiber optic cable, F&I, underground,49-96 fibers (0633-1123)LF1,713$5.25$4.91$7.00$10.00$5.21
0495Fiber optic connection, install, splice (0633-2-31)EACH110$60.00$55.91$55.00$95.00$59.40
0500Fiber optic connection, install, termination (0633-2-32)EACH24$125.00$118.03$115.00$105.00$125.40
0505Fiber optic connection hardware, F&I, splice enclosure (0633-3-11)EACH2$1,700.00$1,608.87$1,600.00$2,500.00$1,709.40
0510Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH10$75.00$68.33$65.00$200.00$72.60
0515Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH2$110.00$105.61$105.00$200.00$112.20
0520Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH2$1,850.00$1,770.37$1,750.00$2,100.00$1,881.00
0525Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH1$975.00$925.56$900.00$2,100.00$983.40
0530Fiber optic cable locator (0633-6)DA150$100.00$155.30$150.00$265.00$110.00
0535Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH2$2,000.00$2,606.34$3,550.00$2,700.00$3,654.00
0540Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$4,000.00$5,523.29$6,250.00$8,500.00$6,808.00
0545ITS CCTV camera, relocate (0682-1400)EACH1$2,500.00$2,174.13$2,150.00$2,650.00$2,310.00
FDOT contract T5894: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy