Traffic Engineering and Management, LLC: FDOT bid record
Traffic Engineering and Management, LLC submitted 11 bids on Florida DOT contracts in the data, from 05 DEC 2018 to 28 OCT 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $0
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2019 | 6 | 0 | 0% |
| 2020 | 3 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 7 | 0 | 0% |
| District 2 | 2 | 0 | 0% |
| District 1 | 1 | 0 | 0% |
| District 4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 10 | 2 (20%) | $680.00 | $1,150.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 9 | 2 (22%) | $10.00 | $5.90 |
| Traffic control officer | 0102-14 | HR | 6 | 2 (33%) | $78.00 | $80.00 |
| Fiber optic connection, install, splice | 0633-2-31 | EACH | 6 | 2 (33%) | $40.00 | $52.75 |
| Inlet protection system | 0104-18 | EACH | 5 | 2 (40%) | $210.00 | $150.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 12 | 1 (8%) | $20.75 | $30.82 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 12 | 1 (8%) | $9.00 | $16.54 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-7 | LF | 8 | 1 (13%) | $6.00 | $5.80 |
| Portable changeable message sign, temporary | 0102-99 | ED | 7 | 1 (14%) | $18.00 | $12.00 |
| Litter removal | 0107-1 | ACRE | 6 | 1 (17%) | $262.50 | $52.98 |
| Mowing | 0107-2 | ACRE | 6 | 1 (17%) | $450.00 | $80.65 |
| Managed field ethernet switch, furnish & install | 0684-1-1 | EACH | 6 | 1 (17%) | $2,912.50 | $4,489.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Powercore, Inc. | 8 | 8 of 8 |
| Traffic Control Devices, Inc. | 6 | 6 of 6 |
| American Lighting and Signalization, LLC. | 6 | 5 of 6 |
| Chinchor Electric Inc. | 4 | 4 of 4 |
| Sice Inc | 4 | 4 of 4 |
| Contact Network LLC | 3 | 3 of 3 |
| Highway Safety Devices, Inc. | 3 | 3 of 3 |
| Florida Safety Contractors, Inc. | 2 | 0 of 2 |
| Aum Construction Inc. | 2 | 1 of 2 |
| Cheyenne Associates LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T5894 | District 5 | SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD | 3 of 5 | $2,796,042 | +12% |
| 25 MAR 2020 | T4548 | District 4 | SR 70/OKEECHOBEE RD | 3 of 5 | $296,808 | +16% |
| 25 MAR 2020 | T5679 | District 5 | SR 3 (COURTENAY PKWY) | 6 of 6 | $1,879,671 | +19% |
| 26 FEB 2020 | T5689 | District 5 | SR 421 | 5 of 5 | $1,770,258 | +13% |
| 31 JUL 2019 | T5664 | District 5 | US 17/92 | 5 of 5 | $2,909,346 | +48% |
| 12 JUN 2019 | T2719 | District 2 | INSTALLATION OF VARIOUS ITS DEVICES IN ALACHUA COUNTY | 8 of 8 | $1,645,931 | +39% |
| 12 JUN 2019 | T5651 | District 5 | SR 5 (US 1) | 3 of 3 | $1,961,134 | +25% |
| 27 MAR 2019 | T2735 | District 2 | SR 10 | 2 of 2 | $628,239 | +49% |
| 27 MAR 2019 | T5653 | District 5 | SR 500 (US 441) (ORANGE BLOSSOM TRAIL) | 2 of 3 | $812,155 | +4.0% |
| 30 JAN 2019 | T5646 | District 5 | SR 464 | 4 of 6 | $106,255 | +24% |
| 05 DEC 2018 | T1731 | District 1 | SR 684 (CORTEZ RD) | 6 of 7 | $1,190,796 | +49% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.