FDOT contract T7622 bid tabulation

SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM. Let by Florida DOT on September 30, 2026, Pinellas, District 7. 9 bids received; low bid $591,529 by Blacktip Services Incorporated.

Owner
Florida DOT
Letting
30 SEP 2026
Pay items
55
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blacktip Services Incorporated$591,529Low
2Yoroca Engineering Contractors, LLC$593,4780.0%
3Rogar Management & Consulting of Florida LLC$774,879+31%
4Burgess Civil, LLC$777,045+31%
5Turtle Infrastructure Partners, LLC$824,284+39%
6Estep Construction, Inc.$849,248+44%
7DB Civil Construction, LLC$853,397+44%
8American Design Engineering Construction Inc.$976,871+65%
9Ajax Paving Industries of Florida LLC$998,720+69%
FDOT contract T7622: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blacktip Services Incorporated2. Yoroca Engineering Contractors, LLC3. Rogar Management & Consulting of Florida LLC4. Burgess Civil, LLC5. Turtle Infrastructure Partners, LLC6. Estep Construction, Inc.
0005Mobilization (0101-1)LS1$20,000$80,000$125,000$87,319$61,650$80,000
0010Maintenance of traffic (0102-1)DA1$8,050.00$18,000$25,000$61,240$121,782$40,000
0015Pedestrian escort/flagger (0102-5)HR288$30.00$20.00$30.00$38.81$29.42$65.00
0020Work zone sign (0102-60)ED2,250$0.42$0.23$1.00$1.02$0.26$2.00
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED1,732$0.22$0.12$0.30$0.54$15.00$1.00
0030Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD2,376$0.12$0.13$3.00$0.27$0.12$5.00
0035Arrow board / advance warning arrow panel (0102-76)ED80$11.00$8.00$25.00$26.93$7.68$45.00
0040Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH48$4.75$3.00$4.11$6.00$6.40$35.00
0045Existing ITS maintenance (0102-112)DA90$25.00$25.00$10.00$224.93$192.00$125.00
0050Type III barricade (0102-115)ED64$0.55$0.30$10.00$1.35$64.00$50.00
0055Portable regulatory, sign (0102-150-1)ED6$33.00$10.00$100.00$80.80$25.60$75.00
0060Sediment barrier (0104-10-3)LF365$3.00$5.00$1.00$10.22$4.39$3.00
0065Inlet protection system (0104-18)EACH22$30.00$100.00$1.00$192.60$50.06$500.00
0070Litter removal (0107-1)ACRE172.40$25.00$1.00$1.00$37.72$25.15$75.00
0075Mowing (0107-2)ACRE26.62$25.00$1.00$1.00$222.32$148.22$250.00
0080Clearing & grubbing (0110-1-1)ACRE1$82,000$2,500.00$10,000$15,098$8,932.73$2,800.00
0085Removal of existing concrete (0110-4-10)SY280$75.00$25.00$21.00$85.25$68.05$35.00
0090Embankment (0120-6)CY150.50$40.00$50.00$71.00$108.11$43.96$100.00
0095Optional base, base group 07 (0285-707)SY6$70.00$100.00$500.00$352.74$174.62$150.00
0100Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY188$30.00$30.00$25.00$49.07$18.38$50.00
0105Superpave asphaltic conc, traffic B (0334-1-12)TN15.50$600.00$550.00$1,261.00$579.00$292.42$400.00
0110Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN0.20$1,000.00$1,000.00$25,000$59,062$8,046.24$1,500.00
0115Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN15.50$600.00$550.00$1,261.00$576.31$332.00$1,500.00
0120Inlets, curb type P-1, partial (0425-1315)EACH1$6,250.00$9,000.00$7,700.00$6,000.00$5,647.82$10,500
0125Inlets, curb, type P-2, partial (0425-1325)EACH2$6,250.00$9,000.00$7,700.00$8,149.64$6,377.88$12,500
0130Inlets, curb, type P-5, partial (0425-1355)EACH12$6,250.00$9,000.00$7,700.00$5,969.66$6,514.84$10,000
0135Inlets, curb, type P-5, modify (0425-1359)EACH1$6,250.00$9,000.00$8,300.00$3,720.47$5,968.16$16,000
0140Inlets, curb, type P-6, partial (0425-1365)EACH5$6,250.00$9,000.00$8,300.00$6,652.21$7,047.11$11,500
0145Inlets, adjust (0425-4)EACH2$4,800.00$1,500.00$7,800.00$5,817.54$2,558.46$4,500.00
0150Manhole, adjust (0425-5)EACH1$1,500.00$2,500.00$2,800.00$1,062.79$1,170.65$1,500.00
0155Replace grate (0425-82)EACH2$1,500.00$1,000.00$1,500.00$2,227.17$1,245.01$2,500.00
0160Underdrain, type II (0440-1-20)LF5$150.00$250.00$100.00$182.53$86.53$175.00
0165Concrete curb & gutter, type E (0520-1-7)LF20$45.00$100.00$200.00$140.27$131.54$45.00
0170Concrete curb & gutter, type F (0520-1-10)LF28$45.00$100.00$200.00$137.39$132.60$55.00
0175Concrete curb, type D (0520-2-4)LF8$45.00$100.00$200.00$230.86$317.18$45.00
0180Concrete sidewalk and driveways, 4" thick (0522-1)SY191$69.00$100.00$225.00$166.80$143.29$125.00
0185Concrete sidewalk and driveways, 6" thick (0522-2)SY80$79.00$100.00$300.00$213.64$135.78$150.00
0190Detectable warnings (0527-2)SF19$25.00$20.00$100.00$42.00$46.99$45.00
0195Bedding stone (0530-74)TN1.60$250.00$350.00$1,000.00$978.09$210.94$800.00
0200Initial contingency amount, DO not bid (0999-25)LS1$38,175$38,175$38,175$38,175$38,175$38,175
0205Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH8$605.00$750.00$655.00$660.00$839.25$900.00
0210Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH2$2,500.00$2,000.00$1,980.00$2,700.00$2,157.86$3,300.00
0215Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$3,300.00$3,000.00$2,600.00$3,600.00$2,343.00$5,500.00
0220Single column ground sign assembly, remove (0700-1600)EACH4$50.00$100.00$30.00$54.00$66.95$200.00
0225Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913)EACH1$3,900.00$3,500.00$4,800.00$4,200.00$4,864.00$4,400.00
0230Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH16$220.00$300.00$550.00$240.00$255.95$475.00
0235Sign panel, remove, UP to 12 SF (0700-3601)EACH16$28.00$100.00$50.00$30.00$44.63$75.00
0240Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH10$5,750.00$6,000.00$7,800.00$5,357.25$8,640.00$4,200.00
0245Raised pavement marker, type B (0706-1-3)EACH24,796$4.75$3.00$4.21$5.22$6.40$6.00
0250Painted pavement markings, surface (0710-90)LS1$2,750.00$10,000$4,000.00$3,069.24$6,400.00$12,000
0255Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.01$8,800.00$10,000$25,000$16,369$38,400$12,000
0260Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.01$3,300.00$10,000$25,000$7,366.00$23,040$12,000
0265Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.02$8,800.00$10,000$25,000$10,338$38,400$12,000
0270Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.02$3,300.00$1,000.00$25,000$3,876.84$23,040$12,000
0275Fiber optic cable locator (0633-6)DA90$25.00$35.00$20.00$187.66$128.00$130.00
FDOT contract T7622: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of September 30, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy