FDOT contract T1927 bid tabulation
WEST MAIN ST FROM HANCHEY RD TO W OF FLORIDA AVE. Let by Florida DOT on July 30, 2025, Hardee, District 1. 6 bids received; low bid $414,963 by Garcia Civil Contractors.
- Owner
- Florida DOT
- Letting
- 30 JUL 2025
- Pay items
- 32
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Garcia Civil Contractors | $414,963 | Low |
| 2 | Alexander Design + Build, LLC | $437,258 | +5.0% |
| 3 | Blacktip Services Incorporated | $458,741 | +11% |
| 4 | National Traffic Solution, Inc | $496,932 | +20% |
| 5 | American Design Engineering Construction Inc. | $507,140 | +22% |
| 6 | Janus Construction Corp. | $568,227 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Garcia Civil Contractors | 2. Alexander Design + Build, LLC | 3. Blacktip Services Incorporated | 4. National Traffic Solution, Inc | 5. American Design Engineering Construction Inc. | 6. Janus Construction Corp. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $56,139 | $96,764 | $53,000 | $39,999 | $150,000 | $56,797 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $30,310 | $25,700 | $20,000 | $69,999 | $35,000 | $96,294 |
| 0015 | Commercial material for temporary driveway maintenance (0102-3) | CY | 188.90 | $43.94 | $64.25 | $15.00 | $149.99 | $35.00 | $115.15 |
| 0020 | Work zone sign (0102-60) | ED | 2,400 | $0.29 | $0.01 | $0.30 | $0.35 | $2.00 | $0.30 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 7,500 | $0.12 | $0.01 | $0.15 | $0.24 | $2.00 | $0.15 |
| 0030 | Portable changeable message sign, temporary (0102-99) | ED | 228 | $17.25 | $0.01 | $17.00 | $24.50 | $35.00 | $17.63 |
| 0035 | Sediment barrier (0104-10-3) | LF | 2,020 | $1.29 | $3.86 | $4.00 | $10.00 | $7.00 | $4.70 |
| 0040 | Inlet protection system (0104-18) | EACH | 1 | $343.31 | $321.25 | $50.00 | $950.00 | $150.00 | $176.25 |
| 0045 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $25,427 | $25,700 | $110,000 | $19,500 | $15,000 | $56,450 |
| 0050 | Removal of existing concrete (0110-4-10) | SY | 87 | $65.95 | $70.68 | $90.00 | $50.00 | $15.00 | $50.53 |
| 0055 | Regular excavation (0120-1) | CY | 149.20 | $152.48 | $19.28 | $90.00 | $40.00 | $40.00 | $106.34 |
| 0060 | Embankment (0120-6) | CY | 327.80 | $78.03 | $19.28 | $40.00 | $65.00 | $40.00 | $57.58 |
| 0065 | Optional base, base group 02 (0285-702) | SY | 395 | $27.23 | $83.53 | $52.00 | $59.95 | $45.00 | $64.63 |
| 0070 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 32.60 | $593.56 | $385.50 | $654.00 | $355.00 | $650.00 | $440.63 |
| 0075 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 32.60 | $633.13 | $642.50 | $723.00 | $415.00 | $650.00 | $470.00 |
| 0080 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 33 | $365.21 | $224.88 | $225.00 | $315.00 | $150.00 | $246.75 |
| 0085 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $4,340.20 | $5,782.50 | $1,500.00 | $3,950.00 | $4,500.00 | $3,525.00 |
| 0090 | Pipe handrail - guiderail, steel (0515-1-1) | LF | 29 | $209.15 | $192.75 | $100.00 | $150.00 | $200.00 | $164.50 |
| 0095 | Concrete curb & gutter, type F (0520-1-10) | LF | 497 | $46.69 | $32.13 | $30.00 | $65.00 | $45.00 | $70.50 |
| 0100 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,048 | $69.29 | $66.82 | $61.00 | $95.00 | $65.00 | $88.13 |
| 0105 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 280 | $103.77 | $93.81 | $79.00 | $105.00 | $75.00 | $114.27 |
| 0110 | Detectable warnings (0527-2) | SF | 161 | $28.56 | $33.41 | $30.00 | $45.00 | $35.00 | $35.25 |
| 0115 | Performance turf, sod (0570-1-2) | SY | 2,216 | $6.65 | $5.14 | $8.00 | $9.00 | $8.00 | $7.34 |
| 0120 | Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11) | SY | 482 | $5.42 | $25.70 | $5.00 | $9.50 | $6.00 | $14.10 |
| 0125 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 2 | $575.00 | $1,002.30 | $672.00 | $395.00 | $950.00 | $705.00 |
| 0130 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $172.50 | $1,002.30 | $560.00 | $295.00 | $650.00 | $235.00 |
| 0135 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $57.50 | $321.24 | $56.00 | $95.00 | $350.00 | $105.75 |
| 0140 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $575.00 | $3,212.50 | $8,960.00 | $4,500.00 | $950.00 | $7,050.00 |
| 0145 | Painted pavement markings, surface (0710-90) | LS | 1 | $1,725.00 | $6,425.00 | $2,800.00 | $2,500.00 | $10,000 | $4,406.25 |
| 0150 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 245 | $6.10 | $6.43 | $7.00 | $2.50 | $5.00 | $8.81 |
| 0155 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 16 | $21.56 | $32.13 | $14.00 | $4.50 | $8.00 | $16.50 |
| 0160 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 195 | $11.79 | $28.27 | $22.00 | $24.00 | $25.00 | $16.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.