FDOT contract T4713 bid tabulation
SR A1A (N OCEAN BLVD/N FT LAUDERALE BEACH BLVD) AT NE 27TH.. Let by Florida DOT on January 29, 2025, Broward, District 4. 4 bids received; low bid $2,083,385 by Signal Technology and Installation Corp..
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 141
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Signal Technology and Installation Corp. | $2,083,385 | Low |
| 2 | Alexander Design + Build, LLC | $2,337,569 | +12% |
| 3 | Aum Construction Inc. | $2,399,214 | +15% |
| 4 | National Traffic Solution, Inc | $3,219,342 | +55% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Signal Technology and Installation Corp. | 2. Alexander Design + Build, LLC | 3. Aum Construction Inc. | 4. National Traffic Solution, Inc |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $96,120 | $151,656 | $140,000 | $270,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $96,120 | $151,656 | $140,000 | $270,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $26,851 | $49,000 | $90,000 | $295,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $40,276 | $49,000 | $90,000 | $295,000 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 2.60 | $144.58 | $454.30 | $750.00 | $100.00 |
| 0030 | Traffic control officer (0102-14) | HR | 116 | $98.36 | $0.01 | $90.00 | $95.00 |
| 0035 | Work zone sign (0102-60) | ED | 5,485 | $0.32 | $0.01 | $0.45 | $0.25 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 10,297 | $0.18 | $0.01 | $0.30 | $0.25 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 9,132 | $0.14 | $0.01 | $0.15 | $0.35 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 278 | $6.56 | $0.01 | $12.00 | $12.50 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 464 | $14.43 | $0.01 | $17.00 | $19.95 |
| 0060 | Type III barricade (0102-115) | ED | 922 | $0.46 | $0.01 | $1.50 | $0.35 |
| 0065 | Inlet protection system (0104-18) | EACH | 9 | $260.55 | $354.00 | $250.00 | $250.00 |
| 0070 | Litter removal (0107-1) | ACRE | 14.51 | $134.26 | $118.00 | $500.00 | $150.00 |
| 0075 | Mowing (0107-2) | ACRE | 0.10 | $1,095.30 | $11,800 | $10,000 | $150.00 |
| 0080 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $6,556.90 | $14,750 | $6,000.00 | $15,000 |
| 0085 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $6,556.90 | $14,750 | $6,000.00 | $15,000 |
| 0090 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $6,556.90 | $14,455 | $10,000 | $15,000 |
| 0095 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $6,556.90 | $14,455 | $10,000 | $15,000 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $3,278.45 | $11,800 | $23,000 | $25,000 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $3,278.45 | $11,800 | $24,000 | $25,000 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 348 | $45.90 | $56.64 | $45.00 | $95.00 |
| 0115 | Tree protection barrier (0110-21) | LF | 46 | $141.46 | $17.70 | $50.00 | $9.50 |
| 0120 | Tree root and branch pruning (0110-22) | EACH | 7 | $3,105.90 | $826.00 | $6,500.00 | $300.00 |
| 0125 | Regular excavation (0120-1) | CY | 133.30 | $42.59 | $17.70 | $20.00 | $95.00 |
| 0130 | Embankment (0120-6) | CY | 57.40 | $118.81 | $29.50 | $150.00 | $95.00 |
| 0135 | Type B stabilization (0160-4) | SY | 274 | $14.32 | $10.62 | $15.00 | $95.00 |
| 0140 | Optional base, base group 06 (0285-706) | SY | 23 | $94.68 | $59.00 | $75.00 | $95.00 |
| 0145 | Optional base, base group 13 (0285-713) | SY | 251 | $147.79 | $153.40 | $100.00 | $150.00 |
| 0150 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 1,598 | $5.58 | $7.10 | $7.50 | $9.50 |
| 0155 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 3,361 | $5.58 | $50.82 | $7.50 | $9.50 |
| 0160 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 1.30 | $3,606.30 | $1,770.00 | $5,000.00 | $300.00 |
| 0165 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 58 | $327.85 | $275.41 | $350.00 | $300.00 |
| 0170 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 133.70 | $268.84 | $258.95 | $300.00 | $300.00 |
| 0175 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 248.10 | $268.84 | $254.48 | $300.00 | $300.00 |
| 0180 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 2 | $18,635 | $15,400 | $30,000 | $19,500 |
| 0185 | Inlets, curb, type P-6, partial (0425-1365) | EACH | 1 | $27,953 | $6,600.00 | $25,000 | $9,500.00 |
| 0190 | Inlets, gutter, type V, <10' (0425-1711) | EACH | 1 | $18,635 | $8,250.00 | $20,000 | $19,500 |
| 0195 | Manholes, P-7, <10' (0425-2-41) | EACH | 3 | $14,908 | $16,500 | $15,000 | $19,500 |
| 0200 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $14,908 | $24,200 | $20,000 | $19,500 |
| 0205 | Manholes, J-7, >10' (0425-2-72) | EACH | 1 | $31,059 | $33,000 | $25,000 | $19,500 |
| 0210 | Inlets, adjust (0425-4) | EACH | 1 | $3,447.55 | $2,750.00 | $5,000.00 | $2,500.00 |
| 0215 | Manhole, adjust (0425-5) | EACH | 4 | $1,490.84 | $495.00 | $2,000.00 | $2,500.00 |
| 0220 | Manhole, adjust, utilities (0425-5-1) | EACH | 2 | $1,490.84 | $1,210.00 | $2,500.00 | $4,500.00 |
| 0225 | Valve boxes, adjust (0425-6) | EACH | 8 | $1,242.36 | $990.00 | $1,500.00 | $2,500.00 |
| 0230 | Meter boxes, adjust (0425-6-1) | EACH | 4 | $1,242.36 | $990.00 | $1,200.00 | $2,500.00 |
| 0235 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 12 | $869.66 | $440.00 | $500.00 | $350.00 |
| 0240 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 74 | $931.77 | $220.00 | $550.00 | $350.00 |
| 0245 | Concrete curb & gutter, type F (0520-1-10) | LF | 672 | $89.18 | $27.73 | $85.00 | $50.00 |
| 0250 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 123 | $144.26 | $81.42 | $150.00 | $250.00 |
| 0255 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 43 | $107.54 | $55.46 | $105.00 | $80.00 |
| 0260 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 250 | $144.26 | $80.24 | $140.00 | $100.00 |
| 0265 | Patterned pavement (0523-3) | SY | 58 | $236.05 | $229.51 | $500.00 | $150.00 |
| 0270 | Pavers, architectural, (0526-1-2) | SY | 90 | $177.04 | $230.10 | $150.00 | $150.00 |
| 0275 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 100 | $177.04 | $230.10 | $90.00 | $100.00 |
| 0280 | Detectable warnings (0527-2) | SF | 114 | $45.90 | $46.02 | $45.00 | $50.00 |
| 0285 | Performance turf, sod (0570-1-2) | SY | 70 | $19.41 | $11.80 | $25.00 | $9.50 |
| 0290 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $9,835.35 | $5,900.00 | $10,000 | $2,500.00 |
| 0295 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.41 | $1,702.24 | $2,950.00 | $5,000.00 | $1,800.00 |
| 0300 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.02 | $2,295.00 | $11,800 | $10,000 | $1,800.00 |
| 0305 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 561 | $1.32 | $2.95 | $3.50 | $1.25 |
| 0310 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 69 | $1.97 | $3.54 | $4.00 | $1.50 |
| 0315 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 604 | $2.63 | $3.95 | $4.00 | $2.00 |
| 0320 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.09 | $1,114.69 | $5,900.00 | $20,000 | $650.00 |
| 0325 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.10 | $1,114.70 | $5,900.00 | $20,000 | $650.00 |
| 0330 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 5 | $131.14 | $206.50 | $80.00 | $65.00 |
| 0335 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.26 | $1,702.28 | $2,950.00 | $5,000.00 | $1,800.00 |
| 0340 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 30 | $1.97 | $5.90 | $6.00 | $3.00 |
| 0345 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.05 | $1,115.10 | $5,900.00 | $5,000.00 | $650.00 |
| 0350 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $13,900 | $13,900 | $13,900 | $13,900 |
| 0355 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $36,100 | $36,100 | $36,100 | $36,100 |
| 0360 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 0365 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0370 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 7 | $712.87 | $826.00 | $850.00 | $450.00 |
| 0375 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $1,424.78 | $4,130.00 | $2,500.00 | $1,950.00 |
| 0380 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $414.90 | $2,360.00 | $500.00 | $300.00 |
| 0385 | Single column ground sign assembly, remove (0700-1600) | EACH | 6 | $134.26 | $177.00 | $250.00 | $95.00 |
| 0390 | Delineator, flexible tubular (0705-11-1) | EACH | 2 | $273.82 | $295.00 | $200.00 | $150.00 |
| 0395 | Raised pavement marker, type B (0706-1-3) | EACH | 118 | $1.84 | $5.90 | $7.00 | $5.00 |
| 0400 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 48 | $4.60 | $11.80 | $10.00 | $3.00 |
| 0405 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,444.84 | $4,720.00 | $7,500.00 | $9,500.00 |
| 0410 | Painted pavement markings, surface (0710-90) | LS | 1 | $11,763 | $4,720.00 | $7,500.00 | $9,500.00 |
| 0415 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 561 | $2.96 | $7.08 | $5.00 | $3.00 |
| 0420 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 69 | $4.37 | $9.44 | $10.00 | $4.00 |
| 0425 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 161 | $5.84 | $11.80 | $12.00 | $5.00 |
| 0430 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.10 | $5,816.10 | $4,130.00 | $5,000.00 | $1,500.00 |
| 0435 | Thermoplastic, standard, arrow (0711-11170) | EACH | 5 | $163.93 | $236.00 | $120.00 | $100.00 |
| 0440 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 30 | $4.37 | $17.70 | $10.00 | $4.00 |
| 0445 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.05 | $5,816.48 | $4,130.00 | $10,000 | $1,500.00 |
| 0450 | Thermoplastic, standard, blue, solid,6" (0711-11421) | LF | 50 | $8.66 | $23.60 | $10.00 | $5.00 |
| 0455 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 443 | $24.27 | $23.60 | $25.00 | $24.00 |
| 0460 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 9 | $1,442.52 | $501.50 | $450.00 | $350.00 |
| 0465 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 8 | $1,442.52 | $295.00 | $250.00 | $250.00 |
| 0470 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.41 | $8,786.28 | $8,850.00 | $15,000 | $7,500.00 |
| 0475 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.02 | $11,279 | $29,500 | $30,000 | $7,500.00 |
| 0480 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.09 | $5,966.92 | $8,850.00 | $10,000 | $1,500.00 |
| 0485 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.26 | $8,786.29 | $8,850.00 | $12,000 | $7,500.00 |
| 0490 | Conduit, furnish & install, open trench (0630-2-11) | LF | 81 | $24.18 | $59.00 | $40.00 | $50.00 |
| 0495 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 384 | $46.23 | $70.80 | $40.00 | $100.00 |
| 0500 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 13 | $1,718.58 | $2,360.00 | $2,000.00 | $2,250.00 |
| 0505 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $8,409.41 | $7,670.00 | $7,500.00 | $7,500.00 |
| 0510 | Electrical power service, remove overhead (0639-1610) | AS | 1 | $1,074.04 | $1,770.00 | $750.00 | $2,500.00 |
| 0515 | Electrical service wire, & install (0639-2-1) | LF | 83 | $138.12 | $23.60 | $12.00 | $15.00 |
| 0520 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $5,800.00 | $5,800.00 | $5,800.00 | $5,800.00 |
| 0525 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,601.44 | $4,484.00 | $2,500.00 | $5,500.00 |
| 0530 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,589 | $5.88 | $7.08 | $3.25 | $4.50 |
| 0535 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 300 | $1.35 | $1.18 | $0.50 | $1.50 |
| 0540 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $20,443 | $17,700 | $25,000 | $22,000 |
| 0545 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $1,611.03 | $2,360.00 | $1,500.00 | $950.00 |
| 0550 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 3 | $2,208.70 | $2,596.00 | $2,750.00 | $3,500.00 |
| 0555 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 8' arm length (0715-61111) | EACH | 5 | $11,183 | $10,620 | $9,500.00 | $22,000 |
| 0560 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 10' arm length (0715-61121) | EACH | 1 | $12,494 | $11,800 | $11,000 | $25,000 |
| 0565 | Light pole complete, F&I, utility conflict pole standard foundation, 30' mounting height, 16' arm length (0715-65166) | EACH | 1 | $11,148 | $10,502 | $9,500.00 | $30,000 |
| 0570 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 2 | $2,685.06 | $2,360.00 | $1,500.00 | $2,950.00 |
| 0575 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 13 | $1,139.43 | $944.00 | $750.00 | $2,950.00 |
| 0580 | Light pole complete-special design, furnish & install double arm pole top mount, concrete, 15' (0715-518315) | EACH | 1 | $47,810 | $51,920 | $47,500 | $19,500 |
| 0585 | Conduit, furnish & install, open trench (0630-2-11) | LF | 83 | $26.20 | $29.50 | $50.00 | $50.00 |
| 0590 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 714 | $61.03 | $70.80 | $50.00 | $100.00 |
| 0595 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $7,785.84 | $17,700 | $15,000 | $9,500.00 |
| 0600 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 35 | $1,881.35 | $2,124.00 | $2,000.00 | $2,250.00 |
| 0605 | Pull & splice box, F&I, 30" X 48" cover size (0635-2-15) | EACH | 1 | $3,544.66 | $4,720.00 | $4,000.00 | $5,500.00 |
| 0610 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $7,707.81 | $6,490.00 | $7,500.00 | $7,500.00 |
| 0615 | Electrical service wire, & install (0639-2-1) | LF | 353 | $5.88 | $23.60 | $10.00 | $15.00 |
| 0620 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $2,601.43 | $4,153.60 | $2,500.00 | $9,500.00 |
| 0625 | Aluminum signals pole, (0646-1-11) | EACH | 7 | $3,580.40 | $2,360.00 | $2,000.00 | $1,950.00 |
| 0630 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 1 | $66,564 | $73,750 | $75,000 | $85,000 |
| 0635 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 1 | $73,438 | $85,432 | $80,000 | $90,000 |
| 0640 | Steel mast arm assembly, and install, double arm 70'-30' (0649-21-16) | EACH | 1 | $93,721 | $123,900 | $125,000 | $99,500 |
| 0645 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 10 | $2,193.72 | $2,124.00 | $1,800.00 | $2,500.00 |
| 0650 | Vehicular traffic signal, furnish & install aluminum, 5 section straight, 1 way (0650-1-18) | AS | 2 | $2,575.88 | $2,596.00 | $2,500.00 | $2,850.00 |
| 0655 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 6 | $1,140.38 | $2,006.00 | $1,800.00 | $1,500.00 |
| 0660 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 2 | $2,170.36 | $2,242.00 | $2,500.00 | $2,750.00 |
| 0665 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $6,193.83 | $6,136.00 | $7,500.00 | $22,500 |
| 0670 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $9,417.98 | $10,030 | $10,000 | $8,500.00 |
| 0675 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 10 | $543.08 | $885.00 | $450.00 | $2,500.00 |
| 0680 | Traffic controller assembly, F&I, NEMA (0670-5110) | AS | 1 | $46,795 | $51,920 | $50,000 | $58,500 |
| 0685 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 1 | $46,795 | $55,460 | $50,000 | $52,500 |
| 0690 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 2 | $9,173.11 | $9,204.00 | $10,000 | $7,500.00 |
| 0695 | Wireless communication device, furnish & install ethernet access point (0684-6-11) | EACH | 1 | $7,206.04 | $8,142.00 | $8,000.00 | $7,500.00 |
| 0700 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $1,030.94 | $944.00 | $1,800.00 | $450.00 |
| 0705 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $4,573.19 | $4,602.00 | $4,000.00 | $1,950.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.