| 0005 | Mobilization (0101-1) | LS | 1 | $263,900 | $152,732 | $215,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $257,587 | $161,595 | $327,652 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $111.00 | $25,804 | $8,625.00 |
| 0020 | Traffic control officer (0102-14) | HR | 32 | $94.00 | $102.60 | $115.00 |
| 0025 | Work zone sign (0102-60) | ED | 12,236 | $0.25 | $0.24 | $0.25 |
| 0030 | Business sign (0102-61) | EACH | 8 | $50.00 | $48.60 | $50.00 |
| 0035 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 360 | $61.00 | $59.40 | $60.50 |
| 0040 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 276 | $24.00 | $23.76 | $24.20 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 4,266 | $0.20 | $0.13 | $0.13 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 9,536 | $0.20 | $0.09 | $0.55 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 200 | $7.00 | $6.48 | $6.60 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 256 | $13.00 | $12.96 | $14.30 |
| 0065 | Temporary signalization and maintenance, intersection (0102-104) | ED | 180 | $51.00 | $10.90 | $40.70 |
| 0070 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 180 | $38.00 | $10.90 | $2.55 |
| 0075 | Type III barricade (0102-115) | ED | 348 | $0.50 | $0.38 | $0.28 |
| 0080 | Inlet protection system (0104-18) | EACH | 8 | $553.00 | $108.40 | $300.00 |
| 0085 | Litter removal (0107-1) | ACRE | 1.51 | $774.00 | $108.00 | $1,207.50 |
| 0090 | Mowing (0107-2) | ACRE | 0.16 | $2,212.00 | $108.00 | $1,150.00 |
| 0095 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $22,122 | $18,684 | $20,000 |
| 0100 | Monitor existing structures- groundwater monitoring (0108-3) | LS | 1 | $33,184 | $18,684 | $8,625.00 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $21,779 | $111,297 | $148,415 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 227 | $35.00 | $56.84 | $46.00 |
| 0115 | Borrow excavation, truck measure (0120-2-2) | CY | 163.50 | $232.00 | $59.12 | $23.00 |
| 0120 | Type B stabilization (0160-4) | SY | 195 | $138.00 | $84.23 | $66.00 |
| 0125 | Optional base, base group 09 (0285-709) | SY | 98 | $110.00 | $585.36 | $110.00 |
| 0130 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 4,845 | $5.00 | $33.48 | $5.50 |
| 0135 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 64.70 | $304.00 | $1,310.04 | $302.50 |
| 0140 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 407.80 | $257.00 | $452.30 | $258.50 |
| 0145 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 2 | $13,782 | $18,758 | $30,303 |
| 0150 | Inlets, curb, type P-4, <10' (0425-1341) | EACH | 1 | $15,331 | $31,263 | $11,500 |
| 0155 | Inlets, curb, type J-4, <10' (0425-1441) | EACH | 1 | $22,344 | $31,263 | $23,000 |
| 0160 | Manholes, P-7, partial (0425-2-43) | EACH | 1 | $6,858.00 | $18,758 | $15,375 |
| 0165 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $15,845 | $31,263 | $23,000 |
| 0170 | Manholes, J-7, partial (0425-2-73) | EACH | 1 | $16,066 | $18,758 | $11,500 |
| 0175 | Manhole, adjust, utilities (0425-5-1) | EACH | 1 | $1,637.00 | $2,842.11 | $3,450.00 |
| 0180 | Valve boxes, adjust (0425-6) | EACH | 1 | $1,311.00 | $2,848.59 | $1,150.00 |
| 0185 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 21 | $147.00 | $369.48 | $575.00 |
| 0190 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 30 | $183.00 | $405.85 | $460.00 |
| 0195 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 27 | $254.00 | $483.17 | $575.00 |
| 0200 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 32 | $543.00 | $1,175.49 | $747.50 |
| 0205 | Concrete curb & gutter, type F (0520-1-10) | LF | 372 | $52.00 | $73.89 | $90.00 |
| 0210 | Concrete curb, type B (0520-2-2) | LF | 29 | $104.00 | $73.89 | $143.75 |
| 0215 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 130 | $104.00 | $96.63 | $180.00 |
| 0220 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 60 | $204.00 | $142.11 | $200.00 |
| 0225 | Pavers, architectural, (0526-1-2) | SY | 32 | $283.00 | $205.77 | $431.25 |
| 0230 | Detectable warnings (0527-2) | SF | 118 | $76.00 | $45.48 | $52.00 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 230 | $19.00 | $18.58 | $46.00 |
| 0240 | Raised pavement marker, type B (0706-1-3) | EACH | 14 | $22.00 | $8.64 | $8.80 |
| 0245 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 80 | $11.00 | $2.70 | $2.75 |
| 0250 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 76 | $28.00 | $3.51 | $3.58 |
| 0255 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.02 | $3,871.00 | $1,296.00 | $1,320.00 |
| 0260 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 |
| 0265 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 15 | $1,668.00 | $442.80 | $451.00 |
| 0270 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $1,940.00 | $2,700.00 | $2,750.00 |
| 0275 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $2,585.00 | $135.00 | $143.75 |
| 0280 | Single column ground sign assembly, remove (0700-1600) | EACH | 4 | $54.00 | $54.00 | $115.00 |
| 0285 | Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF, UP to 12 SF of static sign panels (0700-141161) | EACH | 4 | $8,409.00 | $7,693.80 | $10,743 |
| 0290 | Tubular marker, 36" yellow (0704-1-4) | EACH | 4 | $112.00 | $135.00 | $137.50 |
| 0295 | Raised pavement marker, type B (0706-1-3) | EACH | 122 | $20.00 | $8.64 | $8.80 |
| 0300 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 33 | $112.00 | $5.40 | $5.50 |
| 0305 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,871.00 | $3,780.00 | $3,850.00 |
| 0310 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 578 | $22.00 | $5.94 | $6.05 |
| 0315 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 358 | $22.00 | $7.29 | $7.43 |
| 0320 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 192 | $17.00 | $8.64 | $8.80 |
| 0325 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.08 | $11,061 | $2,376.00 | $2,420.00 |
| 0330 | Thermoplastic, standard, arrow (0711-11170) | EACH | 3 | $553.00 | $91.80 | $93.50 |
| 0335 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.06 | $2,212.00 | $2,376.00 | $2,420.00 |
| 0340 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 432 | $31.00 | $14.58 | $14.85 |
| 0345 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.23 | $3,318.00 | $6,048.00 | $6,160.00 |
| 0350 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.11 | $3,318.00 | $2,376.00 | $2,420.00 |
| 0355 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.15 | $3,871.00 | $6,048.00 | $6,160.00 |
| 0360 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 25 | $11.00 | $10.80 | $247.50 |
| 0365 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.15 | $3,152.00 | $3,078.00 | $3,537.60 |
| 0370 | Itsfm location documentation- intersection (0611-2-1) | EACH | 2 | $2,489.00 | $2,430.00 | $2,942.50 |
| 0375 | Conduit, furnish & install, open trench (0630-2-11) | LF | 215 | $20.00 | $16.05 | $18.45 |
| 0380 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 543 | $25.00 | $24.02 | $44.70 |
| 0385 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $17,789 | $8,180.78 | $13,600 |
| 0390 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 565 | $4.00 | $4.42 | $5.71 |
| 0395 | Fiber optic connection, install, splice (0633-2-31) | EACH | 96 | $50.00 | $48.60 | $65.65 |
| 0400 | Fiber optic connection, install, termination (0633-2-32) | EACH | 48 | $83.00 | $81.00 | $108.78 |
| 0405 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 2 | $1,300.00 | $1,269.00 | $1,676.40 |
| 0410 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 8 | $55.00 | $54.00 | $80.30 |
| 0415 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 4 | $94.00 | $91.80 | $145.75 |
| 0420 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 4 | $1,244.00 | $1,215.00 | $2,157.10 |
| 0425 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 4 | $111.00 | $108.00 | $266.33 |
| 0430 | Fiber optic cable locator (0633-6) | DA | 180 | $326.00 | $318.60 | $385.00 |
| 0435 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 15 | $1,911.00 | $1,534.55 | $1,747.10 |
| 0440 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $2,691.00 | $2,563.71 | $3,246.23 |
| 0445 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $5,757.00 | $4,887.72 | $4,725.85 |
| 0450 | Electrical service wire, & install (0639-2-1) | LF | 72 | $5.00 | $5.41 | $11.05 |
| 0455 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $1,502.00 | $2,315.15 | $2,893.00 |
| 0460 | Aluminum signals pole, (0646-1-11) | EACH | 4 | $3,286.00 | $3,450.23 | $3,234.00 |
| 0465 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 2 | $112,023 | $78,709 | $142,560 |
| 0470 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,028.00 | $1,176.07 | $1,240.00 |
| 0475 | Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10) | AS | 8 | $2,617.00 | $1,804.71 | $2,354.00 |
| 0480 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 4 | $420.00 | $323.07 | $504.00 |
| 0485 | Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111) | AS | 2 | $40,930 | $48,285 | $60,105 |
| 0490 | ITS CCTV camera, F&I, dome enclosure - non-pressurized, high definition (0682-1133) | EACH | 2 | $7,616.00 | $7,435.80 | $8,800.00 |
| 0495 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 2 | $4,259.00 | $4,158.00 | $6,435.00 |
| 0500 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 4 | $923.00 | $1,126.89 | $1,089.00 |
| 0505 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $6,661.00 | $4,403.12 | $6,793.00 |
| 0510 | Utility work- jpa/utility agreement, power (1000-7) | LS | 1 | $30,086 | $1,937.81 | $7,352.00 |