FDOT contract T2991 bid tabulation

SR A1A (US 90A / 3RD ST) AT 3RD AVE S AND AT 7TH AVE N. Let by Florida DOT on May 28, 2025, Duval, District 2. 3 bids received; low bid $1,901,412 by American Lighting and Signalization, LLC..

Owner
Florida DOT
Letting
28 MAY 2025
Pay items
102
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1American Lighting and Signalization, LLC.$1,901,412Low
2Chinchor Electric Inc.$1,992,399+5.0%
3Janus Construction Corp.$2,162,824+14%
FDOT contract T2991: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. American Lighting and Signalization, LLC.2. Chinchor Electric Inc.3. Janus Construction Corp.
0005Mobilization (0101-1)LS1$263,900$152,732$215,000
0010Maintenance of traffic (0102-1)DA1$257,587$161,595$327,652
0015Pedestrian or bicycle special detour (0102-4-1)SY1$111.00$25,804$8,625.00
0020Traffic control officer (0102-14)HR32$94.00$102.60$115.00
0025Work zone sign (0102-60)ED12,236$0.25$0.24$0.25
0030Business sign (0102-61)EACH8$50.00$48.60$50.00
0035Temporary barrier, F&I, low profile, concrete (0102-71-13)LF360$61.00$59.40$60.50
0040Temporary barrier, relocate, low profile concrete (0102-71-23)LF276$24.00$23.76$24.20
0045Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED4,266$0.20$0.13$0.13
0050Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD9,536$0.20$0.09$0.55
0055Arrow board / advance warning arrow panel (0102-76)ED200$7.00$6.48$6.60
0060Portable changeable message sign, temporary (0102-99)ED256$13.00$12.96$14.30
0065Temporary signalization and maintenance, intersection (0102-104)ED180$51.00$10.90$40.70
0070Temporary traffic detection and maintenance, intersection (0102-107-1)ED180$38.00$10.90$2.55
0075Type III barricade (0102-115)ED348$0.50$0.38$0.28
0080Inlet protection system (0104-18)EACH8$553.00$108.40$300.00
0085Litter removal (0107-1)ACRE1.51$774.00$108.00$1,207.50
0090Mowing (0107-2)ACRE0.16$2,212.00$108.00$1,150.00
0095Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$22,122$18,684$20,000
0100Monitor existing structures- groundwater monitoring (0108-3)LS1$33,184$18,684$8,625.00
0105Clearing & grubbing (0110-1-1)ACRE1$21,779$111,297$148,415
0110Removal of existing concrete (0110-4-10)SY227$35.00$56.84$46.00
0115Borrow excavation, truck measure (0120-2-2)CY163.50$232.00$59.12$23.00
0120Type B stabilization (0160-4)SY195$138.00$84.23$66.00
0125Optional base, base group 09 (0285-709)SY98$110.00$585.36$110.00
0130Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY4,845$5.00$33.48$5.50
0135Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN64.70$304.00$1,310.04$302.50
0140Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN407.80$257.00$452.30$258.50
0145Inlets, curb, type 9, <10' (0425-1201)EACH2$13,782$18,758$30,303
0150Inlets, curb, type P-4, <10' (0425-1341)EACH1$15,331$31,263$11,500
0155Inlets, curb, type J-4, <10' (0425-1441)EACH1$22,344$31,263$23,000
0160Manholes, P-7, partial (0425-2-43)EACH1$6,858.00$18,758$15,375
0165Manholes, J-7, <10' (0425-2-71)EACH1$15,845$31,263$23,000
0170Manholes, J-7, partial (0425-2-73)EACH1$16,066$18,758$11,500
0175Manhole, adjust, utilities (0425-5-1)EACH1$1,637.00$2,842.11$3,450.00
0180Valve boxes, adjust (0425-6)EACH1$1,311.00$2,848.59$1,150.00
0185Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF21$147.00$369.48$575.00
0190Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF30$183.00$405.85$460.00
0195Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF27$254.00$483.17$575.00
0200Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF32$543.00$1,175.49$747.50
0205Concrete curb & gutter, type F (0520-1-10)LF372$52.00$73.89$90.00
0210Concrete curb, type B (0520-2-2)LF29$104.00$73.89$143.75
0215Concrete sidewalk and driveways, 4" thick (0522-1)SY130$104.00$96.63$180.00
0220Concrete sidewalk and driveways, 6" thick (0522-2)SY60$204.00$142.11$200.00
0225Pavers, architectural, (0526-1-2)SY32$283.00$205.77$431.25
0230Detectable warnings (0527-2)SF118$76.00$45.48$52.00
0235Performance turf, sod (0570-1-2)SY230$19.00$18.58$46.00
0240Raised pavement marker, type B (0706-1-3)EACH14$22.00$8.64$8.80
0245Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF80$11.00$2.70$2.75
0250Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF76$28.00$3.51$3.58
0255Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.02$3,871.00$1,296.00$1,320.00
0260Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000
0265Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH15$1,668.00$442.80$451.00
0270Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH2$1,940.00$2,700.00$2,750.00
0275Single column ground sign assembly, relocate (0700-1500)EACH1$2,585.00$135.00$143.75
0280Single column ground sign assembly, remove (0700-1600)EACH4$54.00$54.00$115.00
0285Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF, UP to 12 SF of static sign panels (0700-141161)EACH4$8,409.00$7,693.80$10,743
0290Tubular marker, 36" yellow (0704-1-4)EACH4$112.00$135.00$137.50
0295Raised pavement marker, type B (0706-1-3)EACH122$20.00$8.64$8.80
0300Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF33$112.00$5.40$5.50
0305Painted pavement markings, surface (0710-90)LS1$3,871.00$3,780.00$3,850.00
0310Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF578$22.00$5.94$6.05
0315Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF358$22.00$7.29$7.43
0320Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF192$17.00$8.64$8.80
0325Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.08$11,061$2,376.00$2,420.00
0330Thermoplastic, standard, arrow (0711-11170)EACH3$553.00$91.80$93.50
0335Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.06$2,212.00$2,376.00$2,420.00
0340Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF432$31.00$14.58$14.85
0345Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.23$3,318.00$6,048.00$6,160.00
0350Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.11$3,318.00$2,376.00$2,420.00
0355Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.15$3,871.00$6,048.00$6,160.00
0360Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF25$11.00$10.80$247.50
0365Itsfm subsurface documentation- project length (0611-1-1)MI0.15$3,152.00$3,078.00$3,537.60
0370Itsfm location documentation- intersection (0611-2-1)EACH2$2,489.00$2,430.00$2,942.50
0375Conduit, furnish & install, open trench (0630-2-11)LF215$20.00$16.05$18.45
0380Conduit, furnish & install, directional bore (0630-2-12)LF543$25.00$24.02$44.70
0385Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$17,789$8,180.78$13,600
0390Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF565$4.00$4.42$5.71
0395Fiber optic connection, install, splice (0633-2-31)EACH96$50.00$48.60$65.65
0400Fiber optic connection, install, termination (0633-2-32)EACH48$83.00$81.00$108.78
0405Fiber optic connection hardware, F&I, splice (0633-3-11)EACH2$1,300.00$1,269.00$1,676.40
0410Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH8$55.00$54.00$80.30
0415Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH4$94.00$91.80$145.75
0420Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH4$1,244.00$1,215.00$2,157.10
0425Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH4$111.00$108.00$266.33
0430Fiber optic cable locator (0633-6)DA180$326.00$318.60$385.00
0435Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH15$1,911.00$1,534.55$1,747.10
0440Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH5$2,691.00$2,563.71$3,246.23
0445Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$5,757.00$4,887.72$4,725.85
0450Electrical service wire, & install (0639-2-1)LF72$5.00$5.41$11.05
0455Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$1,502.00$2,315.15$2,893.00
0460Aluminum signals pole, (0646-1-11)EACH4$3,286.00$3,450.23$3,234.00
0465Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH2$112,023$78,709$142,560
0470Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS4$1,028.00$1,176.07$1,240.00
0475Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10)AS8$2,617.00$1,804.71$2,354.00
0480Pedestrian detector, furnish & install, standard (0665-1-11)EACH4$420.00$323.07$504.00
0485Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111)AS2$40,930$48,285$60,105
0490ITS CCTV camera, F&I, dome enclosure - non-pressurized, high definition (0682-1133)EACH2$7,616.00$7,435.80$8,800.00
0495Managed field ethernet switch, furnish & install (0684-1-1)EACH2$4,259.00$4,158.00$6,435.00
0500Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$923.00$1,126.89$1,089.00
0505Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$6,661.00$4,403.12$6,793.00
0510Utility work- jpa/utility agreement, power (1000-7)LS1$30,086$1,937.81$7,352.00
FDOT contract T2991: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy