FDOT contract T2A83 bid tabulation

SR 13 (HENDRICKS AVE) FROM SAN MARCO BLVD TO PRUDENTIAL DR. Let by Florida DOT on October 28, 2026, Duval, District 2. 6 bids received; low bid $2,053,866 by Preferred Materials Inc..

Owner
Florida DOT
Letting
28 OCT 2026
Pay items
84
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$2,053,866Low
2Hubbard Construction Company$2,179,120+6.0%
3Duval Asphalt Products, Inc.$2,254,698+10%
4DB Civil Construction, LLC$2,348,950+14%
5Reeves Construction Company$2,456,940+20%
6Janus Construction Corp.$2,781,748+35%
FDOT contract T2A83: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Hubbard Construction Company3. Duval Asphalt Products, Inc.4. DB Civil Construction, LLC5. Reeves Construction Company6. Janus Construction Corp.
0005Mobilization (0101-1)LS1$174,955$220,966$375,000$220,000$435,330$489,049
0010Maintenance of traffic (0102-1)DA1$249,855$211,122$137,500$199,700$136,500$146,725
0015Traffic control officer (0102-14)HR212$100.00$89.87$90.00$85.00$110.00$102.13
0020Work zone sign (0102-60)ED10,795$0.20$0.25$0.25$0.40$0.24$0.26
0025Temporary barrier, F&I, low profile, concrete (0102-71-13)LF156$45.00$74.73$55.00$50.00$76.00$54.00
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED23,800$0.10$0.14$0.25$0.20$0.13$0.14
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD3,551$0.04$0.06$0.50$0.20$0.05$1.07
0040Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH656$5.00$4.74$5.50$6.00$5.42$6.00
0045Portable changeable message sign, temporary (0102-99)ED818$12.00$15.85$16.00$16.00$15.00$16.80
0050Temporary signalization and maintenance, intersection (0102-104)ED1,500$23.09$24.06$28.60$27.00$25.00$46.80
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,500$23.09$24.06$28.50$27.00$25.00$1.20
0060Type III barricade (0102-115)ED565$0.25$0.45$0.50$1.00$0.45$1.20
0065Inlet protection system (0104-18)EACH34$165.00$201.24$105.00$160.00$228.00$180.00
0070Litter removal (0107-1)ACRE25.22$300.00$719.74$1,800.00$100.00$158.00$960.00
0075Mowing (0107-2)ACRE0.41$750.00$80,193$3,000.00$400.00$11,267$1,200.00
0080Clearing & grubbing (0110-1-1)ACRE1$18,985$17,487$23,100$153,000$23,727$18,000
0085Removal of existing concrete (0110-4-10)SY49$56.50$63.52$70.00$60.00$74.00$90.00
0090Optional base, base group 10 (0285-710)SY30$246.04$374.51$232.00$300.00$264.00$318.00
0095Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY16,112$3.64$3.78$2.75$6.00$3.25$6.15
0100Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY7,722$4.55$7.86$3.75$9.00$4.75$6.96
0105Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN1,111.90$224.15$184.17$173.00$215.00$214.00$265.41
0110Asphalt concrete friction course,traffic B, FC-9.5, PG 76-22 (0337-7-80)TN1,638.60$236.68$203.22$215.00$225.00$261.00$276.20
0115Inlets, curb, type 9, partial (0425-1205)EACH1$6,300.00$7,082.68$7,800.00$3,500.00$12,415$4,200.00
0120Inlets, curb, type P-5, partial (0425-1355)EACH1$8,850.00$9,949.47$10,960$5,000.00$15,176$9,000.00
0125Inlets, curb, type P-6, partial (0425-1365)EACH2$8,850.00$9,949.48$10,960$5,500.00$15,176$10,800
0130Manhole, adjust (0425-5)EACH22$1,260.00$1,449.78$1,600.00$800.00$1,690.00$1,800.00
0135Manhole, adjust, utilities (0425-5-1)EACH55$1,260.00$2,175.74$1,600.00$800.00$1,690.00$2,100.00
0140Valve boxes, adjust (0425-6)EACH58$1,260.00$1,445.36$1,500.00$150.00$1,690.00$1,250.00
0145Special drainage structure, utility conflict manhole, type 8 (0425-100-44)EACH1$23,550$26,476$30,000$26,700$40,000$34,200
0150Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF64$295.00$331.65$350.00$300.00$686.00$540.00
0155Pipe liner, cured in place, 12" (0431-1112)LF49$210.00$273.81$240.00$400.00$334.00$270.30
0160Pipe liner, cured in place, 15" (0431-1115)LF210$200.00$254.15$280.00$500.00$308.00$306.60
0165Pipe liner, cured in place, 42" (0431-1142)LF47$790.00$952.05$955.00$1,200.00$1,272.00$1,020.30
0170Concrete curb & gutter, type F (0520-1-10)LF47$47.50$53.40$60.00$84.00$51.00$120.00
0175Concrete sidewalk and driveways, 4" thick (0522-1)SY16$56.00$62.96$70.00$190.00$61.00$180.00
0180Concrete sidewalk and driveways, 6" thick (0522-2)SY22$95.50$107.36$118.00$250.00$103.00$240.00
0185Detectable warnings (0527-2)SF78$35.50$39.35$45.00$42.00$38.00$42.00
0190Painted pavement markings, standard, white, solid, 6" (0710-11101)GM1.40$1,600.00$2,104.99$1,650.00$1,600.00$1,733.00$1,560.00
0195Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,295$2.00$1.05$2.05$4.00$2.17$3.60
0200Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.47$985.01$777.54$1,050.00$800.00$1,090.00$780.00
0205Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.96$1,591.62$2,093.98$1,650.00$1,500.00$1,724.00$1,500.00
0210Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0215Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH52$510.00$539.50$600.00$720.00$552.00$972.00
0220Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH2$2,050.00$2,168.58$2,450.00$2,600.00$2,220.00$2,460.00
0225Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$2,250.00$2,380.14$2,500.00$3,500.00$2,437.00$2,700.00
0230Single column ground sign assembly, relocate (0700-1500)EACH1$175.00$185.13$200.00$600.00$190.00$210.00
0235Single column ground sign assembly, remove (0700-1600)EACH32$50.00$52.89$60.00$60.00$54.00$120.00
0240Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$125.00$132.23$150.00$500.00$135.00$150.00
0245Tubular marker, 36" yellow (0704-1-4)EACH5$125.00$132.23$150.00$250.00$135.00$150.00
0250Raised pavement marker, type B (0706-1-3)EACH656$5.00$4.74$6.00$6.00$5.25$6.00
0255Painted pavement markings, surface (0710-90)LS1$18,000$37,469$25,000$25,996$19,500$24,000
0260Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,481$4.00$4.74$4.50$6.00$4.25$4.80
0265Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF476$5.00$6.84$5.50$7.00$5.25$6.00
0270Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF692$6.00$8.42$6.50$9.00$6.50$7.20
0275Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.47$2,462.53$2,591.82$3,000.00$2,700.00$2,725.00$3,000.00
0280Thermoplastic, standard, message or symbol (0711-11160)EACH2$300.00$157.88$350.00$250.00$325.00$360.00
0285Thermoplastic, standard, arrow (0711-11170)EACH53$80.00$105.25$90.00$100.00$87.00$96.00
0290Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF506$5.00$6.84$6.00$7.00$5.25$6.00
0295Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.07$4,029.85$2,356.42$5,000.00$2,700.00$5,092.00$5,400.00
0300Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,766$16.00$13.68$18.00$16.00$17.00$19.20
0305Thermoplastic, preformed, white, message (0711-14160)EACH52$250.00$263.12$300.00$280.00$270.00$300.00
0310Thermoplastic, preformed, white, arrow (0711-14170)EACH35$100.00$105.25$120.00$150.00$108.00$120.00
0315Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.47$5,995.92$6,836.59$7,000.00$6,000.00$6,493.00$7,200.00
0320Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.80$5,983.29$6,822.19$7,000.00$6,000.00$6,481.00$7,200.00
0325Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.30$4,500.00$2,631.27$5,000.00$3,000.00$4,874.00$5,400.00
0330Conduit, furnish & install, open trench (0630-2-11)LF100$19.46$20.28$24.10$25.00$21.00$24.00
0335Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI6$4,847.53$5,051.00$6,004.04$6,000.00$5,303.00$7,366.20
0340Aluminum signals pole, (0646-1-11)EACH7$3,642.50$3,795.39$4,511.52$4,500.00$3,984.00$4,596.00
0345Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH7$2,006.93$2,091.17$2,485.74$2,600.00$2,195.00$3,576.00
0350Aluminum signals pole, remove (0646-1-60)EACH8$540.00$562.67$668.83$650.00$590.00$534.00
0355Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS5$909.89$948.08$1,126.97$1,200.00$995.00$1,494.00
0360Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS3$1,913.28$1,993.59$2,369.75$2,400.00$2,093.00$3,198.00
0365Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS1$216.00$225.07$267.53$269.00$236.00$180.00
0370Loop assembly, F&I, type F (0660-2106)AS34$1,700.46$1,771.83$2,106.15$2,200.00$1,860.00$2,490.00
0375Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$9,791.78$10,203$12,128$13,000$10,711$12,270
0380Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH1$10,488$10,938$13,002$14,000$11,484$30,792
0385Pedestrian detector, furnish & install, standard (0665-1-11)EACH39$354.67$369.56$439.29$500.00$388.00$462.00
0390Pedestrian detector, adjust/modify on existing pole (0665-1-50)EACH19$346.90$361.46$429.66$100.00$379.00$474.00
0395Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH25$54.00$56.27$66.88$1,300.00$59.00$378.00
0400Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH1$1,129.36$1,176.76$1,398.80$1,300.00$1,235.00$1,692.00
0405Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH1$2,033.99$2,119.36$2,519.26$2,500.00$2,225.00$3,642.00
0410Sign panel, install, UP to 12 SF (0700-3401)EACH12$239.11$249.15$296.16$300.00$261.00$1,794.00
0415Sign panel, remove, UP to 12 SF (0700-3601)EACH13$108.00$112.53$133.77$120.00$118.00$198.00
0420Sign panel, remove, 12-20 SF (0700-3602)EACH1$162.00$168.80$200.65$220.00$177.00$498.00
FDOT contract T2A83: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy