FDOT letting results, June 14, 2023
27 contracts let by Florida DOT on June 14, 2023, $275,716,624 in low bids, a median of 2 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 27
- Low bids, total
- $275,716,624
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T3841 | SR 30A (US 98) | District 3 | 2 | C.W. Roberts Contracting, Inc. | $49,730,089 | $56,193,593 | +13% | FDOT |
| T2906 | SR115 (SOUTHSIDE BLVD) | District 2 | 2 | Preferred Materials Inc. | $29,677,698 | $37,459,626 | +26% | FDOT |
| T5792 | SR 15 (US 17) | District 5 | 4 | P & S Paving, Inc. | $15,097,285 | $18,760,000 | +24% | FDOT |
| T2914 | SR 5 (US 1) | District 2 | 3 | P & S Paving, Inc. | $14,592,365 | $16,386,781 | +12% | FDOT |
| T2919 | SR 47 | District 2 | 3 | Preferred Materials Inc. | $13,289,504 | $13,814,925 | +4.0% | FDOT |
| T7515 | SR 595 (ALT US 19) (5TH AVE N) | District 7 | 3 | Ajax Paving Industries of Florida LLC | $13,134,873 | $13,986,773 | +6.0% | FDOT |
| T7488 | SR 45 (US 41) AND SR 54 | District 7 | 2 | Ajax Paving Industries of Florida LLC | $12,994,324 | $14,956,074 | +15% | FDOT |
| T1861 | LEGACY TRAIL | District 1 | 6 | Zep Construction, Inc. | $12,860,870 | $13,071,905 | +2.0% | FDOT |
| T3877 | SR 57 (US 19) (N JEFFERSON ST) | District 3 | 3 | C.W. Roberts Contracting, Inc. | $11,695,437 | $11,711,684 | 0.0% | FDOT |
| T5786 | SR 326 | District 5 | 2 | C.W. Roberts Contracting, Inc. | $10,986,719 | $11,704,628 | +7.0% | FDOT |
| T3846 | SR 85 (S FERDON BLVD) | District 3 | 2 | Anderson Columbia Co., Inc. | $10,519,569 | $11,964,878 | +14% | FDOT |
| T5760 | SR 527 (ORANGE AVE) | District 5 | 2 | Hubbard Construction Company | $9,020,145 | $14,068,467 | +56% | FDOT |
| T2932 | SR 8 (I-10) | District 2 | 2 | Coxwell, J.B. Contracting, Inc. | $8,815,756 | $9,092,958 | +3.0% | FDOT |
| T5795 | SR 15/600 (US 17/92/ORLANDO AVE/FRENCH AVE) | District 5 | 2 | Hubbard Construction Company | $8,347,803 | $8,446,941 | +1.0% | FDOT |
| T2921 | SR121 | District 2 | 2 | Preferred Materials Inc. | $7,484,995 | $7,980,214 | +7.0% | FDOT |
| T7516 | SR 41 (US 301) (GALL BLVD) | District 7 | 5 | Burgess Civil, LLC | $6,730,280 | $7,488,674 | +11% | FDOT |
| T7512 | SR 573 (S DALE MABRY) | District 7 | 3 | Preferred Materials Inc. | $6,290,573 | $6,337,138 | +1.0% | FDOT |
| T2910 | SR 228 (NORMANDY BLVD) | District 2 | 2 | Preferred Materials Inc. | $5,895,675 | $7,314,868 | +24% | FDOT |
| T2901 | CR 361B | District 2 | 1 | Anderson Columbia Co., Inc. | $5,408,914 | FDOT | ||
| T4649 | SR 710 (SW WARFIELD BLVD) | District 4 | 6 | Zahlene Enterprises Inc. | $4,835,155 | $4,944,344 | +2.0% | FDOT |
| T2913 | SR 14 | District 2 | 2 | Anderson Columbia Co., Inc. | $4,420,617 | $6,140,866 | +39% | FDOT |
| T2925 | SR223(ALT US301/TRUCK ROUTE) | District 2 | 3 | Traffic Control Devices, Inc. | $4,229,229 | $4,393,942 | +4.0% | FDOT |
| T2958 | SR 15 (US 17) | District 2 | 3 | Superior Construction Company Southeast, LLC | $3,795,580 | $3,806,276 | 0.0% | FDOT |
| T2957 | SR208 (WILSON BLVD) | District 2 | 2 | Duval Asphalt Products, Inc. | $2,432,061 | $2,499,802 | +3.0% | FDOT |
| T3791 | ROBBINS BRIDGE ROAD | District 3 | 2 | Murphree Bridge Corporation | $2,097,844 | $2,196,993 | +5.0% | FDOT |
| T2927 | SR 24A/SR 331 | District 2 | 1 | Chinchor Electric Inc. | $737,944 | FDOT | ||
| T2931 | SR 115 (LEM TURNER BLVD) | District 2 | 2 | Chinchor Electric Inc. | $595,321 | $691,390 | +16% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.