Zahlene Enterprises Inc.: FDOT bid record
Zahlene Enterprises Inc. submitted 43 bids on Florida DOT contracts in the data, from 22 MAY 2019 to 14 JUN 2023, and was the low bidder on 6 of them (14%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $41,206,065
- Latest bid
- 14 JUN 2023
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 5 | 1 | 20% |
| 2020 | 9 | 0 | 0% |
| 2021 | 17 | 2 | 12% |
| 2022 | 10 | 2 | 20% |
| 2023 | 2 | 1 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 25 | 5 | 20% |
| District 6 | 15 | 1 | 7% |
| District 1 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone sign | 0102-60 | ED | 43 | 28 (65%) | $0.21 | $0.25 |
| Portable changeable message sign, temporary | 0102-99 | ED | 42 | 28 (67%) | $9.43 | $12.00 |
| Concrete curb & gutter, type F | 0520-1-10 | LF | 34 | 22 (65%) | $16.95 | $42.32 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 43 | 21 (49%) | $0.10 | $0.13 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 31 | 21 (68%) | $5.00 | $5.90 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 57 | 20 (35%) | $695.00 | $1,150.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 45 | 20 (44%) | $19.50 | $30.82 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 37 | 20 (54%) | $42.00 | $86.00 |
| Single post sign, remove | 0700-1-60 | AS | 37 | 19 (51%) | $15.40 | $31.94 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 31 | 15 (48%) | $32.74 | $65.00 |
| Single post sign, F&I ground mount, UP to 12 SF | 0700-1-11 | AS | 37 | 13 (35%) | $345.00 | $406.23 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 27 | 13 (48%) | $3.50 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| The Stout Group LLC | 25 | 12 of 25 |
| Weekley Asphalt Paving, Inc. | 21 | 10 of 21 |
| Ranger Construction Industries, Inc. | 19 | 2 of 19 |
| General Asphalt Company, LLC | 18 | 13 of 18 |
| Horizon Contractors, Inc. | 17 | 8 of 17 |
| Roadway Construction, LLC | 17 | 13 of 17 |
| Halley Engineering Contractors, Inc. | 15 | 5 of 15 |
| Florida Engineering & Development Corp | 13 | 5 of 13 |
| Ohl USA Inc | 11 | 4 of 11 |
| Jva Engineering Contractor, Inc | 11 | 8 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 JUN 2023 | T4649 | District 4 | SR 710 (SW WARFIELD BLVD) | 1 of 6 | $4,835,155 | Low, 2.0% under the second |
| 24 MAY 2023 | T6547 | District 6 | SR 5 (OVERSEAS HWY NB) | 5 of 5 | $9,499,683 | +21% |
| 25 MAY 2022 | T4605 | District 4 | SR 802 (LAKE WORTH RD) | 1 of 3 | $13,894,963 | Low, 10% under the second |
| 25 MAY 2022 | T4606 | District 4 | UNIVERSITY DR | 6 of 6 | $15,853,296 | +16% |
| 27 APR 2022 | T4612 | District 4 | PROSPECT RD | 4 of 9 | $7,265,497 | +8.0% |
| 30 MAR 2022 | T4603 | District 4 | SW 64TH AVE | 8 of 8 | $3,000,000 | +33% |
| 30 MAR 2022 | T4604 | District 4 | CITY OF OAKLAND PARK LAKESIDE SIDEWALKS | 8 of 8 | $1,825,000 | +56% |
| 30 MAR 2022 | T4607 | District 4 | SW 148TH AVE | 7 of 7 | $2,757,046 | +40% |
| 23 FEB 2022 | T4598 | District 4 | SR A1A AND SR 5 (US 1/FEDERAL HWY) | 1 of 5 | $5,606,708 | Low, 23% under the second |
| 23 FEB 2022 | T4602 | District 4 | HOLMBERG RD | 5 of 5 | $889,266 | +46% |
| 26 JAN 2022 | T4591 | District 4 | BAYVIEW DR | 4 of 5 | $3,018,416 | +19% |
| 26 JAN 2022 | T4595 | District 4 | SR 817 (UNIVERSITY DR) | 3 of 9 | $12,609,287 | +12% |
| 08 DEC 2021 | T4566 | District 4 | SR 9 (I-95) NB AND SB OFF-RAMPS | 4 of 6 | $5,677,673 | +23% |
| 08 DEC 2021 | T4589 | District 4 | SW 184TH AVE | 4 of 7 | $1,500,000 | +9.0% |
| 08 DEC 2021 | T4594 | District 4 | OAKLAND PARK SIDEWALKS | 1 of 3 | $2,000,000 | Low, 29% under the second |
| 29 SEP 2021 | T1821 | District 1 | SEMINOLE ELEMENTARY | 2 of 5 | $736,642 | +4.0% |
| 29 SEP 2021 | T6461 | District 6 | SR 934 (NW 74 ST) | 7 of 10 | $4,615,391 | +25% |
| 25 AUG 2021 | T1824 | District 1 | SR 700 (US 98) | 5 of 5 | $1,308,753 | +47% |
| 28 JUL 2021 | T4576 | District 4 | PORT ST. LUCIE BLVD | 1 of 9 | $11,570,179 | Low, 6.0% under the second |
| 09 JUN 2021 | T1761 | District 1 | SR 80 | 2 of 6 | $4,161,783 | +2.0% |
| 26 MAY 2021 | T4562 | District 4 | WASHINGTON ST AND SW/NW 72ND AVE | 3 of 7 | $3,676,133 | +2.0% |
| 26 MAY 2021 | T4563 | District 4 | SW 40TH AVE | 3 of 6 | $3,879,414 | +15% |
| 26 MAY 2021 | T4567 | District 4 | HOMEWOOD BLVD | 5 of 6 | $3,086,774 | +23% |
| 28 APR 2021 | T6524 | District 6 | SR 969/MILAM DAIRY RD/NW 72 AVE | 3 of 6 | $804,251 | +6.0% |
| 28 APR 2021 | T6528 | District 6 | SR 826 (FRONTAGE RD) | 7 of 12 | $2,140,213 | +5.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.