| 0005 | Mobilization (0101-1) | LS | 1 | $200,000 | $332,463 | $508,362 | $394,460 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $190,000 | $497,945 | $244,804 | $633,921 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $13,000 | $18,968 | $50,749 | $57,413 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $32,500 | $14,575 | $61,003 | $15,991 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,400 | $5,775.00 | $12,279 | $6,336.14 |
| 0030 | Traffic control officer (0102-14) | HR | 120 | $105.00 | $85.00 | $113.15 | $100.67 |
| 0035 | Work zone sign (0102-60) | ED | 19,018 | $0.15 | $0.15 | $0.17 | $0.16 |
| 0040 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 300 | $37.50 | $37.00 | $41.87 | $39.15 |
| 0045 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 300 | $17.50 | $17.00 | $19.24 | $17.99 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 35,500 | $0.10 | $0.09 | $0.10 | $0.10 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,350 | $1.00 | $0.05 | $0.06 | $0.05 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 500 | $6.50 | $6.00 | $6.79 | $6.35 |
| 0065 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 2,519 | $4.50 | $5.00 | $5.66 | $5.65 |
| 0070 | Temporary crash cushion, redirective option (0102-89-1) | LO | 2 | $3,650.00 | $1,000.00 | $1,131.49 | $2,572.85 |
| 0075 | Portable changeable message sign, temporary (0102-99) | ED | 1,548 | $10.00 | $9.00 | $10.18 | $9.52 |
| 0080 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,000 | $10.00 | $8.00 | $38.59 | $33.69 |
| 0085 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,000 | $14.50 | $13.00 | $6.22 | $0.01 |
| 0090 | Type III barricade (0102-115) | ED | 10 | $0.75 | $0.75 | $0.85 | $0.79 |
| 0095 | Portable regulatory, sign (0102-150-1) | ED | 1,000 | $4.25 | $4.00 | $4.53 | $4.23 |
| 0100 | Radar speed display unit (0102-150-2) | ED | 1,000 | $4.25 | $4.00 | $4.53 | $4.23 |
| 0105 | Inlet protection system (0104-18) | EACH | 70 | $135.00 | $137.60 | $169.73 | $130.29 |
| 0110 | Litter removal (0107-1) | ACRE | 992.30 | $85.00 | $100.00 | $113.15 | $78.17 |
| 0115 | Mowing (0107-2) | ACRE | 900.90 | $75.00 | $100.00 | $169.73 | $46.90 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $32,000 | $100,638 | $39,897 | $51,528 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 260 | $115.00 | $27.50 | $65.36 | $30.17 |
| 0130 | Subsoil excavation (0120-4) | CY | 17 | $145.00 | $150.00 | $141.12 | $164.57 |
| 0135 | Flowable fill (0121-70) | CY | 17 | $600.00 | $395.00 | $693.80 | $433.38 |
| 0140 | Type B stabilization (0160-4) | SY | 98 | $33.50 | $24.67 | $19.36 | $22.49 |
| 0145 | Optional base, base group 01 (0285-701) | SY | 83 | $38.00 | $29.93 | $63.18 | $55.62 |
| 0150 | Optional base, base group 04 (0285-704) | SY | 14 | $90.00 | $54.20 | $186.50 | $87.22 |
| 0155 | Optional base, base group 05 (0285-705) | SY | 280 | $42.50 | $32.42 | $47.52 | $61.72 |
| 0160 | Optional base, base group 09 (0285-709) | SY | 24 | $190.00 | $103.04 | $416.96 | $167.78 |
| 0165 | Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3) | SY | 760 | $1.00 | $7.48 | $8.29 | $10.61 |
| 0170 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 1,079 | $1.00 | $5.29 | $5.36 | $10.00 |
| 0175 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 36,084 | $1.00 | $2.25 | $2.34 | $5.81 |
| 0180 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 98,230 | $1.00 | $1.48 | $2.53 | $2.00 |
| 0185 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 98,100 | $1.00 | $1.26 | $2.88 | $2.42 |
| 0190 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 87,941 | $1.00 | $1.30 | $1.88 | $2.67 |
| 0195 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 22,828.30 | $137.00 | $135.51 | $138.74 | $159.27 |
| 0200 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 11,103.60 | $195.00 | $220.65 | $172.29 | $207.97 |
| 0205 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 226.90 | $192.00 | $190.11 | $211.59 | $288.54 |
| 0210 | Manhole, adjust (0425-5) | EACH | 2 | $2,250.00 | $1,275.00 | $1,131.49 | $1,595.43 |
| 0215 | Valve boxes, adjust (0425-6) | EACH | 11 | $1,300.00 | $1,150.00 | $1,131.49 | $1,315.34 |
| 0220 | Concrete curb & gutter, type E (0520-1-7) | LF | 48 | $130.00 | $52.00 | $118.83 | $57.05 |
| 0225 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 10 | $195.00 | $100.00 | $261.08 | $109.72 |
| 0230 | Detectable warnings (0527-2) | SF | 276 | $30.00 | $35.50 | $45.26 | $38.95 |
| 0235 | Performance turf, sod (0570-1-2) | SY | 45,232 | $3.20 | $3.15 | $2.93 | $5.00 |
| 0240 | Shoulder drop off soil (0570-13-1) | CY | 6,806.70 | $42.00 | $20.10 | $21.36 | $12.15 |
| 0245 | Conduit, furnish & install, open trench (0630-2-11) | LF | 529 | $17.00 | $13.00 | $17.55 | $36.85 |
| 0250 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 303 | $33.00 | $27.00 | $29.95 | $26.85 |
| 0255 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 4 | $750.00 | $1,300.00 | $1,716.30 | $1,437.12 |
| 0260 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 16 | $3,800.00 | $2,512.00 | $2,627.12 | $2,793.17 |
| 0265 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 16 | $2,000.00 | $1,900.00 | $3,459.91 | $2,456.26 |
| 0270 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 13.31 | $1,500.00 | $1,499.89 | $1,697.23 | $1,693.75 |
| 0275 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 486 | $1.10 | $1.75 | $1.98 | $1.98 |
| 0280 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 895 | $1.60 | $2.75 | $3.11 | $3.11 |
| 0285 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 12.04 | $725.00 | $399.87 | $452.60 | $451.55 |
| 0290 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.28 | $1,500.00 | $1,499.52 | $1,697.23 | $1,693.33 |
| 0295 | Two component polyurethane injection (0906-173200) | LB | 7,100 | $10.00 | $9.00 | $14.97 | $9.62 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $102,521 | $102,521 | $102,521 | $102,521 |
| 0305 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 17.81 | $7,500.00 | $2,721.38 | $2,093.26 | $3,005.55 |
| 0310 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 139 | $500.00 | $485.00 | $548.78 | $513.22 |
| 0315 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,100.00 | $2,050.00 | $2,319.56 | $2,169.27 |
| 0320 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $240.00 | $225.00 | $254.59 | $238.09 |
| 0325 | Single column ground sign assembly, remove (0700-1600) | EACH | 31 | $55.00 | $50.00 | $56.58 | $52.91 |
| 0330 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 1 | $6,500.00 | $6,250.00 | $7,071.80 | $6,613.62 |
| 0335 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 1 | $250.00 | $225.00 | $254.59 | $238.09 |
| 0340 | Overhead static sign repair cantilever (0700-4810) | EACH | 1 | $11,000 | $10,000 | $10,296 | $5,840.07 |
| 0345 | Object marker, type 1 (0705-10-1) | EACH | 12 | $250.00 | $225.00 | $254.59 | $238.09 |
| 0350 | Delineator, flexible tubular (0705-11-1) | EACH | 110 | $115.00 | $105.00 | $118.81 | $111.11 |
| 0355 | Delineator, non-flexible (0705-11-2) | EACH | 14 | $75.00 | $70.00 | $79.20 | $74.07 |
| 0360 | Raised pavement marker, type B (0706-1-3) | EACH | 7,351 | $4.25 | $5.00 | $5.66 | $5.65 |
| 0365 | Painted pavement markings, surface (0710-90) | LS | 1 | $87,500 | $95,000 | $107,491 | $122,021 |
| 0370 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 2,818 | $4.25 | $2.50 | $2.83 | $2.71 |
| 0375 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,777 | $5.50 | $4.50 | $5.09 | $4.89 |
| 0380 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 3,675 | $6.50 | $5.00 | $5.66 | $5.43 |
| 0385 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 2.86 | $2,600.00 | $2,200.00 | $2,489.27 | $2,388.38 |
| 0390 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 11 | $205.00 | $165.00 | $186.70 | $179.13 |
| 0395 | Thermoplastic, standard, arrow (0711-11170) | EACH | 199 | $80.00 | $65.00 | $73.55 | $70.57 |
| 0400 | Thermoplastic, standard, yield line (0711-11180) | LF | 304 | $11.00 | $9.00 | $10.18 | $9.77 |
| 0405 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 780 | $5.50 | $5.00 | $5.66 | $5.43 |
| 0410 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 2.04 | $2,600.00 | $2,293.22 | $2,602.42 | $2,489.58 |
| 0415 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 112 | $205.00 | $190.00 | $214.99 | $206.27 |
| 0420 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 112 | $95.00 | $135.00 | $152.75 | $146.56 |
| 0425 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 18.31 | $5,200.00 | $3,499.62 | $3,960.22 | $3,799.28 |
| 0430 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 1.83 | $5,800.00 | $5,000.00 | $5,657.44 | $5,428.14 |
| 0435 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 12.02 | $2,600.00 | $1,200.00 | $1,357.79 | $1,302.75 |
| 0440 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 12.63 | $5,200.00 | $3,498.61 | $3,960.22 | $3,798.19 |
| 0445 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.21 | $32,000 | $41,208 | $47,070 | $44,736 |
| 0450 | Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102) | GM | 0.10 | $38,000 | $41,117 | $47,918 | $44,637 |
| 0455 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.09 | $11,000 | $9,725.81 | $11,371 | $10,559 |
| 0460 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.15 | $32,000 | $40,519 | $47,070 | $43,989 |
| 0465 | Preformed/permanent tape, remove (0713-107) | SF | 1,482 | $5.50 | $3.00 | $3.39 | $3.26 |
| 0470 | Conduit, furnish & install, open trench (0630-2-11) | LF | 4,511 | $15.50 | $13.00 | $16.97 | $17.37 |
| 0475 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 4,584 | $30.00 | $27.00 | $31.40 | $31.06 |
| 0480 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $7,500.00 | $6,887.00 | $10,265 | $9,600.80 |
| 0485 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $1,400.00 | $1,300.00 | $4,978.56 | $1,784.56 |
| 0490 | Fiber optic cable locator (0633-6) | DA | 250 | $200.00 | $181.00 | $186.70 | $224.25 |
| 0495 | Span wire assembly, adjust (0634-4400) | PI | 1 | $850.00 | $743.00 | $2,689.03 | $3,150.08 |
| 0500 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 106 | $1,400.00 | $1,300.00 | $1,716.30 | $1,437.12 |
| 0505 | Aluminum signals pole, (0646-1-11) | EACH | 2 | $3,200.00 | $3,009.00 | $3,407.19 | $3,036.38 |
| 0510 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 6 | $2,125.00 | $1,933.00 | $3,158.27 | $2,724.74 |
| 0515 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 15 | $620.00 | $586.00 | $730.92 | $583.27 |
| 0520 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 2 | $950.00 | $842.00 | $974.02 | $907.54 |
| 0525 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 8 | $2,000.00 | $1,821.00 | $2,034.60 | $1,857.20 |
| 0530 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 16 | $250.00 | $233.00 | $124.46 | $118.97 |
| 0535 | Loop assembly, F&I, type B (0660-2102) | AS | 60 | $1,450.00 | $1,336.00 | $1,843.93 | $1,913.00 |
| 0540 | Loop assembly, F&I, type F (0660-2106) | AS | 42 | $1,560.00 | $1,460.00 | $2,175.32 | $1,682.43 |
| 0545 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 19 | $380.00 | $358.00 | $472.68 | $294.79 |
| 0550 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 17 | $85.00 | $78.00 | $124.46 | $193.72 |
| 0555 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 16 | $5,200.00 | $4,972.00 | $1,294.87 | $2,443.63 |
| 0560 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 8 | $250.00 | $223.00 | $248.93 | $237.94 |
| 0565 | Utility work- jpa/utility agreement, power (1000-7) | LS | 1 | $34,000 | $31,075 | $94,118 | $92,402 |