FDOT contract T2A29 bid tabulation

SR 228 (NORMANDY BLVD) FROM THE EQUESTRIAN CENTER TO LAMPLIGHTER. Let by Florida DOT on July 29, 2026, Duval, District 2. 4 bids received; low bid $8,775,067 by Duval Asphalt Products, Inc..

Owner
Florida DOT
Letting
29 JUL 2026
Pay items
113
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Duval Asphalt Products, Inc.$8,775,067Low
2Preferred Materials Inc.$9,236,795+5.0%
3Anderson Columbia Co., Inc.$9,531,450+9.0%
4Hubbard Construction Company$10,524,957+20%
FDOT contract T2A29: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Duval Asphalt Products, Inc.2. Preferred Materials Inc.3. Anderson Columbia Co., Inc.4. Hubbard Construction Company
0005Mobilization (0101-1)LS1$200,000$332,463$508,362$394,460
0010Maintenance of traffic (0102-1)DA1$190,000$497,945$244,804$633,921
0015Special detour- temporary pavement (0102-2200)SY1$13,000$18,968$50,749$57,413
0020Special detour- temporary earthwork/base (0102-2300)CY1$32,500$14,575$61,003$15,991
0025Pedestrian or bicycle special detour (0102-4-1)SY1$10,400$5,775.00$12,279$6,336.14
0030Traffic control officer (0102-14)HR120$105.00$85.00$113.15$100.67
0035Work zone sign (0102-60)ED19,018$0.15$0.15$0.17$0.16
0040Temporary barrier, F&I, anchored (0102-71-15)LF300$37.50$37.00$41.87$39.15
0045Temporary barrier, relocate, anchored (0102-71-25)LF300$17.50$17.00$19.24$17.99
0050Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED35,500$0.10$0.09$0.10$0.10
0055Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD1,350$1.00$0.05$0.06$0.05
0060Arrow board / advance warning arrow panel (0102-76)ED500$6.50$6.00$6.79$6.35
0065Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH2,519$4.50$5.00$5.66$5.65
0070Temporary crash cushion, redirective option (0102-89-1)LO2$3,650.00$1,000.00$1,131.49$2,572.85
0075Portable changeable message sign, temporary (0102-99)ED1,548$10.00$9.00$10.18$9.52
0080Temporary signalization and maintenance, intersection (0102-104)ED2,000$10.00$8.00$38.59$33.69
0085Temporary traffic detection and maintenance, intersection (0102-107-1)ED2,000$14.50$13.00$6.22$0.01
0090Type III barricade (0102-115)ED10$0.75$0.75$0.85$0.79
0095Portable regulatory, sign (0102-150-1)ED1,000$4.25$4.00$4.53$4.23
0100Radar speed display unit (0102-150-2)ED1,000$4.25$4.00$4.53$4.23
0105Inlet protection system (0104-18)EACH70$135.00$137.60$169.73$130.29
0110Litter removal (0107-1)ACRE992.30$85.00$100.00$113.15$78.17
0115Mowing (0107-2)ACRE900.90$75.00$100.00$169.73$46.90
0120Clearing & grubbing (0110-1-1)ACRE1$32,000$100,638$39,897$51,528
0125Removal of existing concrete (0110-4-10)SY260$115.00$27.50$65.36$30.17
0130Subsoil excavation (0120-4)CY17$145.00$150.00$141.12$164.57
0135Flowable fill (0121-70)CY17$600.00$395.00$693.80$433.38
0140Type B stabilization (0160-4)SY98$33.50$24.67$19.36$22.49
0145Optional base, base group 01 (0285-701)SY83$38.00$29.93$63.18$55.62
0150Optional base, base group 04 (0285-704)SY14$90.00$54.20$186.50$87.22
0155Optional base, base group 05 (0285-705)SY280$42.50$32.42$47.52$61.72
0160Optional base, base group 09 (0285-709)SY24$190.00$103.04$416.96$167.78
0165Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3)SY760$1.00$7.48$8.29$10.61
0170Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY1,079$1.00$5.29$5.36$10.00
0175Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY36,084$1.00$2.25$2.34$5.81
0180Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY98,230$1.00$1.48$2.53$2.00
0185Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15)SY98,100$1.00$1.26$2.88$2.42
0190Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY87,941$1.00$1.30$1.88$2.67
0195Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN22,828.30$137.00$135.51$138.74$159.27
0200Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN11,103.60$195.00$220.65$172.29$207.97
0205Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN226.90$192.00$190.11$211.59$288.54
0210Manhole, adjust (0425-5)EACH2$2,250.00$1,275.00$1,131.49$1,595.43
0215Valve boxes, adjust (0425-6)EACH11$1,300.00$1,150.00$1,131.49$1,315.34
0220Concrete curb & gutter, type E (0520-1-7)LF48$130.00$52.00$118.83$57.05
0225Concrete sidewalk and driveways, 6" thick (0522-2)SY10$195.00$100.00$261.08$109.72
0230Detectable warnings (0527-2)SF276$30.00$35.50$45.26$38.95
0235Performance turf, sod (0570-1-2)SY45,232$3.20$3.15$2.93$5.00
0240Shoulder drop off soil (0570-13-1)CY6,806.70$42.00$20.10$21.36$12.15
0245Conduit, furnish & install, open trench (0630-2-11)LF529$17.00$13.00$17.55$36.85
0250Conduit, furnish & install, directional bore (0630-2-12)LF303$33.00$27.00$29.95$26.85
0255Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH4$750.00$1,300.00$1,716.30$1,437.12
0260Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH16$3,800.00$2,512.00$2,627.12$2,793.17
0265Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH16$2,000.00$1,900.00$3,459.91$2,456.26
0270Painted pavement markings, standard, white, solid, 6" (0710-11101)GM13.31$1,500.00$1,499.89$1,697.23$1,693.75
0275Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF486$1.10$1.75$1.98$1.98
0280Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF895$1.60$2.75$3.11$3.11
0285Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM12.04$725.00$399.87$452.60$451.55
0290Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM9.28$1,500.00$1,499.52$1,697.23$1,693.33
0295Two component polyurethane injection (0906-173200)LB7,100$10.00$9.00$14.97$9.62
0300Initial contingency amount, DO not bid (0999-25)LS1$102,521$102,521$102,521$102,521
0305Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM17.81$7,500.00$2,721.38$2,093.26$3,005.55
0310Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH139$500.00$485.00$548.78$513.22
0315Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH4$2,100.00$2,050.00$2,319.56$2,169.27
0320Single column ground sign assembly, relocate (0700-1500)EACH1$240.00$225.00$254.59$238.09
0325Single column ground sign assembly, remove (0700-1600)EACH31$55.00$50.00$56.58$52.91
0330Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH1$6,500.00$6,250.00$7,071.80$6,613.62
0335Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$250.00$225.00$254.59$238.09
0340Overhead static sign repair cantilever (0700-4810)EACH1$11,000$10,000$10,296$5,840.07
0345Object marker, type 1 (0705-10-1)EACH12$250.00$225.00$254.59$238.09
0350Delineator, flexible tubular (0705-11-1)EACH110$115.00$105.00$118.81$111.11
0355Delineator, non-flexible (0705-11-2)EACH14$75.00$70.00$79.20$74.07
0360Raised pavement marker, type B (0706-1-3)EACH7,351$4.25$5.00$5.66$5.65
0365Painted pavement markings, surface (0710-90)LS1$87,500$95,000$107,491$122,021
0370Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,818$4.25$2.50$2.83$2.71
0375Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF2,777$5.50$4.50$5.09$4.89
0380Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF3,675$6.50$5.00$5.66$5.43
0385Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM2.86$2,600.00$2,200.00$2,489.27$2,388.38
0390Thermoplastic, standard, message or symbol (0711-11160)EACH11$205.00$165.00$186.70$179.13
0395Thermoplastic, standard, arrow (0711-11170)EACH199$80.00$65.00$73.55$70.57
0400Thermoplastic, standard, yield line (0711-11180)LF304$11.00$9.00$10.18$9.77
0405Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF780$5.50$5.00$5.66$5.43
0410Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM2.04$2,600.00$2,293.22$2,602.42$2,489.58
0415Thermoplastic, preformed, white, message (0711-14160)EACH112$205.00$190.00$214.99$206.27
0420Thermoplastic, preformed, white, arrow (0711-14170)EACH112$95.00$135.00$152.75$146.56
0425Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM18.31$5,200.00$3,499.62$3,960.22$3,799.28
0430Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM1.83$5,800.00$5,000.00$5,657.44$5,428.14
0435Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM12.02$2,600.00$1,200.00$1,357.79$1,302.75
0440Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM12.63$5,200.00$3,498.61$3,960.22$3,798.19
0445Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.21$32,000$41,208$47,070$44,736
0450Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102)GM0.10$38,000$41,117$47,918$44,637
0455Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.09$11,000$9,725.81$11,371$10,559
0460Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.15$32,000$40,519$47,070$43,989
0465Preformed/permanent tape, remove (0713-107)SF1,482$5.50$3.00$3.39$3.26
0470Conduit, furnish & install, open trench (0630-2-11)LF4,511$15.50$13.00$16.97$17.37
0475Conduit, furnish & install, directional bore (0630-2-12)LF4,584$30.00$27.00$31.40$31.06
0480Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$7,500.00$6,887.00$10,265$9,600.80
0485Signal cable, remove- intersection (0632-7-6)PI2$1,400.00$1,300.00$4,978.56$1,784.56
0490Fiber optic cable locator (0633-6)DA250$200.00$181.00$186.70$224.25
0495Span wire assembly, adjust (0634-4400)PI1$850.00$743.00$2,689.03$3,150.08
0500Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH106$1,400.00$1,300.00$1,716.30$1,437.12
0505Aluminum signals pole, (0646-1-11)EACH2$3,200.00$3,009.00$3,407.19$3,036.38
0510Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH6$2,125.00$1,933.00$3,158.27$2,724.74
0515Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH15$620.00$586.00$730.92$583.27
0520Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS2$950.00$842.00$974.02$907.54
0525Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS8$2,000.00$1,821.00$2,034.60$1,857.20
0530Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS16$250.00$233.00$124.46$118.97
0535Loop assembly, F&I, type B (0660-2102)AS60$1,450.00$1,336.00$1,843.93$1,913.00
0540Loop assembly, F&I, type F (0660-2106)AS42$1,560.00$1,460.00$2,175.32$1,682.43
0545Pedestrian detector, furnish & install, standard (0665-1-11)EACH19$380.00$358.00$472.68$294.79
0550Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH17$85.00$78.00$124.46$193.72
0555Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH16$5,200.00$4,972.00$1,294.87$2,443.63
0560Sign panel, remove, 12-20 SF (0700-3602)EACH8$250.00$223.00$248.93$237.94
0565Utility work- jpa/utility agreement, power (1000-7)LS1$34,000$31,075$94,118$92,402
FDOT contract T2A29: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy