FDOT contract T2A58 bid tabulation

SR 202 (BUTLER BLVD) FROM BELFORT RD TO HODGES BLVD. Let by Florida DOT on February 25, 2026, Duval, District 2. 3 bids received; low bid $14,200,844 by Preferred Materials Inc..

Owner
Florida DOT
Letting
25 FEB 2026
Pay items
126
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$14,200,844Low
2Duval Asphalt Products, Inc.$15,639,594+10%
3Hubbard Construction Company$17,908,305+26%
FDOT contract T2A58: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Duval Asphalt Products, Inc.3. Hubbard Construction Company
0005Mobilization (0101-1)LS1$463,617$596,600$500,377
0010Maintenance of traffic (0102-1)DA1$591,975$295,500$952,437
0015Special detour- temporary pavement (0102-2200)SY1$88,810$82,000$128,796
0020Special detour- temporary earthwork/base (0102-2300)CY1$26,791$13,000$31,998
0025Traffic control officer (0102-14)HR3,010$100.00$100.00$105.86
0030Work zone sign (0102-60)ED38,971$0.20$0.25$0.22
0035Barrier mounted work zone sign- index 700-013 (0102-62-13)ED4,410$0.50$0.55$0.54
0040Temporary barrier, F&I, anchored (0102-71-15)LF1,680$36.00$42.00$39.25
0045Temporary barrier, F&I, free standing (0102-71-16)LF300$22.00$36.00$23.99
0050Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED36,560$0.10$0.15$0.11
0055Arrow board / advance warning arrow panel (0102-76)ED491$5.00$5.50$5.40
0060Temporary crash cushion, redirective option (0102-89-1)LO4$1,100.00$1,200.00$2,607.70
0065Portable changeable message sign, temporary (0102-99)ED1,608$10.00$14.50$10.79
0070Type III barricade (0102-115)ED582$0.35$0.40$0.38
0075Portable regulatory, sign (0102-150-1)ED464$5.00$5.50$5.40
0080Radar speed display unit (0102-150-2)ED464$5.00$5.50$5.40
0085Removable tape, white, solid 6" (0102-913-21)GM0.11$45,872$25,850$15,491
0090Removable tape, yellow, solid, (0102-913-31)GM0.04$41,667$71,100$11,805
0095Sediment barrier (0104-10-3)LF2,842$1.47$1.25$1.89
0100Inlet protection system (0104-18)EACH124$122.26$75.00$145.71
0105Litter removal (0107-1)ACRE2,063.67$40.00$147.00$43.17
0110Mowing (0107-2)ACRE1,921.52$60.00$147.00$64.76
0115Clearing & grubbing (0110-1-1)ACRE1$104,421$78,850$141,400
0120Removal of existing concrete (0110-4-10)SY17$1,698.50$1,900.00$1,929.75
0125Tree protection barrier (0110-21)LF1,326$5.58$2.50$3.24
0130Type B stabilization (0160-4)SY91$90.13$100.00$126.16
0135Optional base, base group 01 (0285-701)SY91$74.85$100.00$118.69
0140Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2)SY35,681$2.76$3.80$8.20
0145Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY56,221$1.28$2.70$2.66
0150Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY52,764$0.95$2.20$2.77
0155Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15)SY290,518$1.31$1.35$3.87
0160Milling existing asphalt pavement, 1/2" avg depth (0327-70-16)SY138$14.15$16.00$9.03
0165Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY7,180$1.72$2.45$7.88
0170Milling existing asphalt pavement, 5 3/4" avg depth (0327-70-27)SY8,113$5.26$3.50$29.73
0175Superpave asphaltic conc, traffic C (0334-1-13)TN8,513.10$108.62$144.00$124.81
0180Superpave asphaltic conc, traffic E (0334-1-15)TN1,338.60$142.76$160.00$269.38
0185Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN4,010.60$157.18$184.00$208.53
0190Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN33,001.50$132.10$145.00$145.44
0195Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN14,175.20$213.44$200.00$228.28
0200Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN3,747.10$147.14$190.00$218.37
0205Miscellaneous asphalt (0339-1)TN103.80$498.48$800.00$992.85
0210Inlets, median barrier, type 1, <=10' (0425-1781)EACH2$23,100$26,000$26,245
0215Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF32$721.00$800.00$819.16
0220Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF465$59.00$67.00$63.68
0225Median concrete barrier, tall grade-separated (0521-1-13)LF59$700.00$800.00$795.31
0230Guardrail -roadway, general (0536-1-1)LF2,198$19.97$27.50$21.88
0235Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112)EACH4$2,603.55$3,000.00$2,852.92
0240Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH8$3,000.78$3,200.00$3,288.19
0245Guardrail removal (0536-73)LF2,217$1.50$3.25$1.64
0250Guardrail end treatment- parallel approach terminal (0536-85-24)EACH15$2,826.33$3,200.00$3,097.04
0255Performance turf, sod (0570-1-2)SY31,525$2.55$3.75$4.38
0260Conduit, furnish & install, open trench (0630-2-11)LF179$16.70$35.00$36.25
0265Fiber optic cable locator (0633-6)DA390$231.24$250.00$256.21
0270Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH6$1,547.13$1,200.00$2,063.29
0275Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH19$2,599.01$2,400.00$2,316.77
0280Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH40$1,991.45$2,200.00$2,098.72
0285Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132)EACH2$8,047.14$6,300.00$6,054.13
0290Raised pavement marker, type B (0706-1-3)EACH7,663$4.75$5.00$5.92
0295Painted pavement markings, standard, white, solid, 6" (0710-11101)GM14.20$1,525.00$1,600.00$1,894.53
0300Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM2.66$3,000.00$3,200.00$3,710.29
0305Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103)GM0.14$3,100.00$3,300.00$3,793.66
0310Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF4,893$2.00$2.25$2.58
0315Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM29.43$400.00$425.00$493.88
0320Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.34$2,500.00$2,750.00$3,036.82
0325Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM12.31$1,525.00$1,600.00$1,894.12
0330Initial contingency amount, DO not bid (0999-25)LS1$150,000$150,000$150,000
0335Ground-in rumble strips, 16" (0546-72-1)GM7.93$3,652.88$2,500.00$3,343.65
0340Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH16$607.00$650.00$661.78
0345Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH29$2,420.00$2,650.00$2,638.39
0350Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH9$3,130.00$3,500.00$3,412.47
0355Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212)EACH9$3,256.00$3,650.00$3,549.84
0360Single column ground sign assembly, relocate (0700-1500)EACH2$192.00$205.00$209.33
0365Single column ground sign assembly, remove (0700-1600)EACH48$30.00$34.00$32.71
0370Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116)EACH2$14,170$16,000$15,449
0375Multi-column ground sign assembly, remove (0700-2600)EACH2$780.00$875.00$850.40
0380Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH3$232.00$255.00$252.94
0385Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH2$277.00$300.00$302.00
0390Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH1$3,184.00$3,500.00$3,471.34
0395Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH19$5,732.00$6,250.00$6,249.29
0400Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207)EACH8$9,244.00$10,000$10,078
0405Sign panel, furnish & install overhead mount, 301-400 SF (0700-3208)EACH3$14,027$15,500$15,293
0410Sign panel, furnish & install overhead mount, 401-500 SF (0700-3209)EACH2$16,899$18,500$18,424
0415Sign panel, remove, UP to 12 SF (0700-3601)EACH5$25.00$27.50$27.26
0420Sign panel, remove, UP to 50 SF with lighting (0700-3624)EACH1$205.00$225.00$223.50
0425Sign panel, remove, 51-100 SF lighting (0700-3625)EACH2$265.00$300.00$288.92
0430Sign panel, remove, 101-200 SF with lighting (0700-3626)EACH14$320.00$350.00$348.88
0435Sign panel, remove panel, SF with lighting (0700-3627)EACH5$400.00$450.00$436.10
0440Sign panel, remove panel, SF with lighting (0700-3628)EACH5$450.00$500.00$490.61
0445Sign panel, remove panel, SF with lighting (0700-3629)EACH1$510.00$575.00$556.02
0450Sign panel, remove panel, SF with lighting (0700-3630)EACH2$590.00$650.00$643.25
0455Sign panel, remove panel, 601 SF and greater with lighting (0700-3631)EACH2$675.00$750.00$735.92
0460Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH5$98.00$110.00$106.84
0465Delineator, non-flexible (0705-11-2)EACH420$86.00$95.00$93.76
0470Raised pavement marker, type B (0706-1-3)EACH6,401$4.75$5.00$5.92
0475Painted pavement markings, surface (0710-90)LS1$120,000$136,500$199,778
0480Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.14$18,500$20,000$22,626
0485Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF233$3.50$4.00$4.59
0490Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF4,915$4.50$5.00$5.74
0495Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF25$8.00$9.00$10.34
0500Thermoplastic, standard, message or symbol (0711-11160)EACH16$140.00$155.00$174.59
0505Thermoplastic, standard, arrow (0711-11170)EACH41$90.00$100.00$114.86
0510Thermoplastic, standard, yield line (0711-11180)LF34$9.50$10.50$15.51
0515Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF12,266$3.25$3.50$4.02
0520Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF177$13.00$14.50$16.08
0525Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560)EACH1$490.00$550.00$608.76
0530Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570)EACH1$600.00$650.00$746.59
0535Thermoplastic, preformed, color route shield (0711-14660)EACH3$1,700.00$1,850.00$2,124.92
0540Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM10.76$4,100.00$4,500.00$5,084.55
0545Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM2.54$5,400.00$6,000.00$6,714.06
0550Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM28.99$1,500.00$1,700.00$1,860.36
0555Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133)GM0.34$7,900.00$8,500.00$9,616.59
0560Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM11.49$4,000.00$4,500.00$5,084.34
0565Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM3.37$3,600.00$4,000.00$4,588.98
0570Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.12$16,000$18,000$18,580
0575Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.38$4,600.00$5,000.00$5,727.98
0580Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM3.26$3,600.00$4,000.00$4,591.61
0585Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.72$25,000$28,400$31,012
0590Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102)GM0.07$36,000$41,000$38,833
0595Permanent tape, white, 3-9 dotted, 6" wide, for concrete surfaces (0713-103171)GM0.10$8,000.00$8,500.00$9,412.53
0600Permanent tape, white, 3-9 dotted, 12" wide, for concrete surfaces (0713-103173)GM0.10$21,000$23,500$25,900
0605Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM1.65$10,500$11,500$13,161
0610Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.71$25,000$28,400$30,662
0615Permanent tape, black, 3-9 dotted, 6" wide, for concrete surfaces (0713-103371)GM0.09$8,000.00$8,500.00$9,897.55
0620Permanent tape, black, 3-9 dotted, 12" wide, for concrete surfaces (0713-103373)GM0.10$21,000$23,500$25,900
0625Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM1.65$10,500$11,500$13,161
0630Loop assembly, F&I, type F (0660-2106)AS2$1,697.95$1,500.00$1,499.09
FDOT contract T2A58: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy