FDOT contract T2A40 bid tabulation

20836645201. Let by Florida DOT on July 29, 2026, Columbia, District 2. 2 bids received; low bid $7,938,321 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
29 JUL 2026
Pay items
88
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$7,938,321Low
2Duval Asphalt Products, Inc.$10,023,288+26%
FDOT contract T2A40: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. Duval Asphalt Products, Inc.
0005Mobilization (0101-1)LS1$200,178$320,000
0010Mobilization (0101-1)LS1$200,178$242,500
0015Maintenance of traffic (0102-1)DA1$83,724$275,000
0020Maintenance of traffic (0102-1)DA1$83,724$275,000
0025Traffic control officer (0102-14)HR136$122.80$105.00
0030Work zone sign (0102-60)ED11,520$0.25$0.25
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED57,240$0.12$0.11
0040Arrow board / advance warning arrow panel (0102-76)ED180$6.14$5.20
0045Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH1,125$6.45$4.00
0050Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH3,586$6.45$4.00
0055Portable changeable message sign, temporary (0102-99)ED360$12.28$12.00
0060Temporary signalization and maintenance, intersection (0102-104)ED360$43.78$40.00
0065Temporary traffic detection and maintenance, intersection (0102-107-1)ED360$7.06$6.00
0070Portable regulatory, sign (0102-150-1)ED180$6.14$5.25
0075Radar speed display unit (0102-150-2)ED180$6.14$5.25
0080Temporary raised rumble per day, includes all sets and relocations (0102-909)DA180$55.26$30.00
0085Artificial coverings /rolled erosion control products (0104-1)SY382$12.28$11.00
0090Sediment barrier (0104-10-3)LF200$10.76$5.50
0095Inlet protection system (0104-18)EACH30$122.80$145.00
0100Litter removal (0107-1)ACRE507.69$122.80$110.00
0105Mowing (0107-2)ACRE463.16$184.20$120.00
0110Clearing & grubbing (0110-1-1)ACRE1$21,650$52,225
0115Removal of existing concrete (0110-4-10)SY489$22.16$50.00
0120Optional base, base group 01 (0285-701)SY1,607$8.74$22.50
0125Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY190,646$2.77$4.50
0130Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY45,185$4.07$4.00
0135Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN15,726.70$147.14$180.00
0140Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN19,438.60$148.12$175.00
0145Mitered end sect, replace slab- construction use (0430-991)EACH12$885.18$4,000.00
0150Concrete curb & gutter, type E (0520-1-7)LF54$31.84$100.00
0155Concrete curb & gutter, type F (0520-1-10)LF223$31.94$100.00
0160Concrete sidewalk and driveways, 6" thick (0522-2)SY107$82.91$90.00
0165Detectable warnings (0527-2)SF154$55.26$30.00
0170Performance turf, sod (0570-1-2)SY38,278$2.76$4.00
0175Shoulder drop off soil (0570-13-1)CY6,005$21.65$42.00
0180Painted pavement markings, standard, white, solid, 6" (0710-11101)GM43.74$2,456.01$1,450.00
0185Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,866$2.15$1.05
0190Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF1,076$2.70$1.60
0195Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,774$3.32$2.10
0200Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM9.19$2,087.61$750.00
0205Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM1.58$896.44$750.00
0210Painted pavement markings, standard, white, message or symbol (0710-11160)EACH28$110.52$70.00
0215Painted pavement markings, standard, white, arrows (0710-11170)EACH190$61.40$42.50
0220Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM23.42$2,456.01$1,450.00
0225Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF1,306$2.46$1.60
0230Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM9.37$521.90$750.00
0235Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM2.11$902.58$750.00
0240Initial contingency amount, DO not bid (0999-25)LS1$45,310$45,310
0245Initial contingency amount, DO not bid (0999-25)LS1$47,087$47,087
0250Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM23.47$2,271.80$4,200.00
0255Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH1$1,024.24$850.00
0260Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,202.63$1,825.00
0265Single column ground sign assembly, remove (0700-1600)EACH2$282.44$240.00
0270Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH2$6,248.73$5,200.00
0275Raised pavement marker, type B (0706-1-3)EACH2,918$6.45$4.25
0280Painted pavement markings, surface (0710-90)LS1$28,244$30,000
0285Painted pavement markings, surface (0710-90)LS1$66,312$32,500
0290Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF933$5.53$4.25
0295Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF538$6.75$5.50
0300Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF887$10.44$6.50
0305Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.79$3,192.80$4,000.00
0310Thermoplastic, standard, yield line (0711-11180)LF18$12.28$22.00
0315Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF653$7.98$5.50
0320Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM1.06$3,070.01$4,000.00
0325Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF474$17.50$20.00
0330Thermoplastic, preformed, white, message (0711-14160)EACH14$227.18$650.00
0335Thermoplastic, preformed, white, arrow (0711-14170)EACH95$85.95$325.00
0340Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM21.87$4,912.01$5,100.00
0345Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM4.59$1,842.00$2,600.00
0350Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM11.71$4,912.01$5,100.00
0355Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM4.69$1,842.00$2,600.00
0360Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$10,941$16,000
0365Signal cable, remove- intersection (0632-7-6)PI1$5,648.82$1,750.00
0370Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS14$2,489.58$1,850.00
0375Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS2$2,948.26$2,300.00
0380Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS3$3,340.24$2,650.00
0385Vehicular traffic signal, remove- poles to remain (0650-1-60)AS16$529.58$300.00
0390Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS4$1,105.15$950.00
0395Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS4$282.44$150.00
0400Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH2$22,573$30,000
0405Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH2$5,748.95$6,000.00
0410Pedestrian detector, furnish & install, standard (0665-1-11)EACH4$647.30$325.00
0415Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH4$141.22$250.00
0420Traffic controller, modify (0671-2-40)EACH2$3,389.29$2,250.00
0425Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH3$1,551.06$1,250.00
0430Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH4$1,532.34$1,500.00
0435Sign panel, remove, 12-20 SF (0700-3602)EACH5$353.06$250.00
0440Internally illuminated sign, remove (0700-5-60)EACH5$1,059.15$375.00
FDOT contract T2A40: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy