FDOT contract T2A33 bid tabulation
SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL. Let by Florida DOT on February 25, 2026, Putnam, District 2. 8 bids received; low bid $6,270,148 by Halifax Paving, Inc..
- Owner
- Florida DOT
- Letting
- 25 FEB 2026
- Pay items
- 137
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Halifax Paving, Inc. | $6,270,148 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $7,125,421 | +14% |
| 3 | Whitehurst, V. E. & Sons, Inc. | $7,569,433 | +21% |
| 4 | Pigott Asphalt and Sitework LLC | $7,620,485 | +22% |
| 5 | Preferred Materials Inc. | $7,801,683 | +24% |
| 6 | Duval Asphalt Products, Inc. | $8,495,961 | +35% |
| 7 | Masci General Contractors, Inc | $9,238,517 | +47% |
| 8 | Hubbard Construction Company | $10,489,460 | +67% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Halifax Paving, Inc. | 2. C.W. Roberts Contracting, Inc. | 3. Whitehurst, V. E. & Sons, Inc. | 4. Pigott Asphalt and Sitework LLC | 5. Preferred Materials Inc. | 6. Duval Asphalt Products, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $505,587 | $300,000 | $1,081,640 | $750,000 | $445,244 | $700,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $50,000 | $60,000 | $62,337 | $186,500 | $55,139 | $45,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $248,000 | $302,000 | $605,015 | $350,000 | $519,934 | $580,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $25,000 | $30,000 | $10,750 | $187,500 | $59,276 | $82,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,000 | $30,000 | $1,500.00 | $5,000.00 | $11,916 | $6,000.00 |
| 0030 | Traffic control officer (0102-14) | HR | 644 | $125.00 | $105.00 | $125.00 | $1.00 | $100.00 | $120.00 |
| 0035 | Work zone sign (0102-60) | ED | 41,525 | $0.16 | $0.25 | $0.19 | $0.25 | $0.21 | $0.25 |
| 0040 | Barrier mounted work zone sign- index 700-013 (0102-62-13) | ED | 1,813 | $0.40 | $1.00 | $0.43 | $0.50 | $0.85 | $1.00 |
| 0045 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 406 | $44.00 | $58.00 | $47.30 | $50.00 | $42.00 | $50.00 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 24,572 | $0.12 | $0.13 | $0.13 | $0.01 | $0.11 | $0.15 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 5,610 | $0.06 | $0.07 | $0.06 | $0.10 | $0.05 | $0.50 |
| 0060 | Temporary separator, F&I remove (0102-75-1) | LF | 900 | $22.00 | $13.60 | $23.65 | $25.00 | $12.00 | $15.25 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 180 | $6.00 | $5.50 | $6.45 | $5.00 | $4.75 | $6.00 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 1,199 | $10.00 | $12.00 | $12.90 | $10.00 | $10.50 | $13.00 |
| 0075 | Temporary signalization and maintenance, intersection (0102-104) | ED | 3,500 | $37.00 | $19.70 | $13.30 | $1.00 | $12.37 | $75.00 |
| 0080 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 3,500 | $1.00 | $35.00 | $18.68 | $1.00 | $17.38 | $40.00 |
| 0085 | Type III barricade (0102-115) | ED | 1,826 | $0.32 | $0.32 | $0.34 | $5.00 | $0.26 | $0.35 |
| 0090 | Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12) | GM | 0.06 | $3,000.00 | $3,000.00 | $3,225.00 | $10,000 | $3,000.00 | $7,500.00 |
| 0095 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.41 | $8,000.00 | $9,000.00 | $8,600.00 | $10,000 | $8,000.00 | $16,500 |
| 0100 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.06 | $3,000.00 | $3,100.00 | $3,225.00 | $10,000 | $3,000.00 | $7,500.00 |
| 0105 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 108 | $10.00 | $11.00 | $10.75 | $12.00 | $10.00 | $5.00 |
| 0110 | Removable tape, white, 12" crosswalk (0102-913-24) | LF | 493 | $8.00 | $9.00 | $8.60 | $10.00 | $8.00 | $3.50 |
| 0115 | Removable tape, white, symbol or arrow (0102-913-29) | EACH | 3 | $450.00 | $495.00 | $483.75 | $500.00 | $450.00 | $355.00 |
| 0120 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.29 | $8,000.00 | $8,500.00 | $8,600.00 | $10,000 | $8,000.00 | $16,500 |
| 0125 | Sediment barrier (0104-10-3) | LF | 4,476 | $1.50 | $1.05 | $2.00 | $3.00 | $0.98 | $1.25 |
| 0130 | Inlet protection system (0104-18) | EACH | 155 | $150.00 | $161.00 | $125.00 | $150.00 | $100.00 | $100.00 |
| 0135 | Litter removal (0107-1) | ACRE | 264.25 | $75.00 | $88.00 | $107.50 | $10.00 | $250.00 | $150.00 |
| 0140 | Mowing (0107-2) | ACRE | 206.48 | $125.00 | $146.00 | $161.25 | $10.00 | $205.00 | $200.00 |
| 0145 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $100,000 | $20,000 | $19,185 | $150,000 | $34,679 | $45,000 |
| 0150 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $15,000 | $20,000 | $27,047 | $100,000 | $12,846 | $20,000 |
| 0155 | Removal of existing concrete (0110-4-10) | SY | 2,168 | $70.00 | $95.00 | $51.10 | $65.00 | $47.50 | $60.00 |
| 0160 | Regular excavation (0120-1) | CY | 16 | $200.00 | $120.00 | $241.90 | $200.00 | $203.57 | $286.00 |
| 0165 | Borrow excavation, truck measure (0120-2-2) | CY | 97.90 | $30.00 | $82.00 | $236.50 | $250.00 | $94.21 | $40.00 |
| 0170 | Embankment (0120-6) | CY | 54.40 | $30.00 | $97.00 | $166.65 | $250.00 | $143.17 | $265.00 |
| 0175 | Flowable fill (0121-70) | CY | 13.80 | $420.00 | $373.00 | $486.00 | $400.00 | $452.00 | $575.00 |
| 0180 | Prepared soil layer, 24" depth (0162-1100) | SY | 54 | $50.00 | $118.00 | $45.00 | $100.00 | $144.23 | $145.00 |
| 0185 | Optional base, base group 08 (0285-708) | SY | 15 | $175.00 | $260.00 | $236.50 | $150.00 | $364.55 | $260.00 |
| 0190 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 87,532 | $3.00 | $4.00 | $3.53 | $3.00 | $4.95 | $4.50 |
| 0195 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 39,135 | $4.00 | $10.00 | $2.59 | $2.00 | $6.09 | $4.50 |
| 0200 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 2.40 | $500.00 | $220.00 | $350.00 | $500.00 | $1,457.00 | $900.00 |
| 0205 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 7,221.40 | $150.00 | $143.00 | $161.95 | $190.00 | $198.26 | $185.00 |
| 0210 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 1.20 | $1,000.00 | $503.00 | $350.00 | $300.00 | $3,263.80 | $3,000.00 |
| 0215 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 10,450 | $150.00 | $185.00 | $161.95 | $190.00 | $204.46 | $185.00 |
| 0220 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 5,074 | $6.00 | $7.65 | $6.35 | $5.00 | $5.00 | $6.75 |
| 0225 | Cleaning & sealing random cracks- concrete pavement (0350-6) | LF | 80 | $6.00 | $9.45 | $16.15 | $7.00 | $5.00 | $8.00 |
| 0230 | Grinding concrete pavement (0352-70) | SY | 2,970 | $13.18 | $15.50 | $17.30 | $15.00 | $23.18 | $16.75 |
| 0235 | Concrete pavement slab replacement (0353-70) | CY | 176.90 | $1,500.00 | $1,600.00 | $1,566.00 | $1,500.00 | $1,456.85 | $1,700.00 |
| 0240 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 1 | $17,325 | $12,200 | $16,419 | $15,000 | $15,273 | $19,400 |
| 0245 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $12,600 | $11,000 | $14,114 | $12,500 | $13,129 | $16,650 |
| 0250 | Manhole, adjust (0425-5) | EACH | 22 | $1,000.00 | $900.00 | $1,774.00 | $1,500.00 | $1,650.00 | $2,000.00 |
| 0255 | Manhole, adjust, utilities (0425-5-1) | EACH | 20 | $1,000.00 | $900.00 | $1,855.00 | $1,500.00 | $1,725.00 | $2,000.00 |
| 0260 | Valve boxes, adjust (0425-6) | EACH | 34 | $750.00 | $435.00 | $1,720.00 | $1,200.00 | $1,600.00 | $2,000.00 |
| 0265 | Manhole cover- replace (0425-7) | EACH | 14 | $1,312.50 | $500.00 | $2,150.00 | $1,800.00 | $2,000.00 | $3,000.00 |
| 0270 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 16 | $400.00 | $405.00 | $1,779.00 | $650.00 | $1,654.29 | $1,900.00 |
| 0275 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 18 | $400.00 | $245.00 | $1,053.50 | $650.00 | $980.00 | $1,100.00 |
| 0280 | Pipe liner, cured in place, 18" (0431-1118) | LF | 84 | $183.65 | $522.00 | $197.50 | $200.00 | $350.00 | $400.00 |
| 0285 | Chemical grout repair, pipe, test, 18" (0432-3-2) | EACH | 1 | $3,475.00 | $1,600.00 | $3,736.00 | $3,500.00 | $900.00 | $1,000.00 |
| 0290 | Chemical grout repair, inlet (0433-1) | / EA | 4 | $1,875.00 | $4,600.00 | $2,015.00 | $2,000.00 | $2,000.00 | $2,200.00 |
| 0295 | Concrete curb & gutter, type E (0520-1-7) | LF | 95 | $47.50 | $117.00 | $91.40 | $60.00 | $85.00 | $120.00 |
| 0300 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,928 | $47.50 | $48.00 | $52.15 | $50.00 | $48.50 | $78.00 |
| 0305 | Concrete curb, type B (0520-2-2) | LF | 172 | $47.50 | $49.00 | $51.45 | $50.00 | $47.85 | $60.00 |
| 0310 | Valley gutter- concrete (0520-3) | LF | 10 | $47.50 | $420.00 | $82.80 | $100.00 | $77.00 | $95.00 |
| 0315 | Curb-concrete pavement joint (0520-4) | LF | 72 | $72.50 | $9.25 | $37.65 | $20.00 | $35.00 | $40.00 |
| 0320 | Concrete traffic separator, special- variable width (0520-70) | SY | 88 | $125.00 | $171.00 | $141.90 | $150.00 | $132.00 | $165.00 |
| 0325 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 172 | $47.50 | $108.00 | $56.45 | $50.00 | $52.50 | $65.00 |
| 0330 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 797 | $68.50 | $197.00 | $70.45 | $75.00 | $65.50 | $85.00 |
| 0335 | Pavers, architectural, remove existing and reinstall (0526-1101) | SY | 13 | $165.00 | $625.00 | $220.40 | $350.00 | $205.00 | $275.00 |
| 0340 | Detectable warnings (0527-2) | SF | 1,727 | $36.00 | $48.00 | $37.10 | $22.00 | $34.50 | $40.00 |
| 0345 | Performance turf, sod (0570-1-2) | SY | 2,137 | $4.50 | $7.25 | $7.50 | $3.50 | $6.03 | $5.00 |
| 0350 | Irrigation sleeve, 2" diameter (0591-1200) | LF | 50 | $57.75 | $65.00 | $118.25 | $40.00 | $110.00 | $125.00 |
| 0355 | Irrigation sleeve, 4" diameter (0591-1400) | LF | 50 | $57.75 | $77.00 | $172.00 | $50.00 | $160.00 | $200.00 |
| 0360 | Raised pavement marker, type B (0706-1-3) | EACH | 4,796 | $4.50 | $5.00 | $4.85 | $4.50 | $4.50 | $6.00 |
| 0365 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 7.49 | $1,100.00 | $1,210.00 | $1,182.50 | $1,250.00 | $1,100.00 | $18.00 |
| 0370 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 1.27 | $1,200.00 | $1,310.00 | $1,290.00 | $1,250.00 | $1,200.00 | $2,800.00 |
| 0375 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 7,308 | $1.25 | $1.40 | $1.35 | $1.50 | $1.25 | $1.25 |
| 0380 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 2,219 | $1.50 | $1.67 | $1.61 | $1.50 | $1.50 | $3.00 |
| 0385 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,907 | $1.75 | $1.94 | $1.88 | $2.50 | $1.75 | $3.50 |
| 0390 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 4.19 | $550.00 | $600.00 | $591.25 | $600.00 | $550.00 | $500.00 |
| 0395 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.10 | $600.00 | $638.00 | $645.00 | $1,000.00 | $600.00 | $3,000.00 |
| 0400 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 2.74 | $550.00 | $605.00 | $591.25 | $650.00 | $550.00 | $1,200.00 |
| 0405 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 13 | $65.00 | $72.00 | $69.90 | $75.00 | $65.00 | $100.00 |
| 0410 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 131 | $45.00 | $50.00 | $48.40 | $50.00 | $45.00 | $50.00 |
| 0415 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 5.71 | $1,100.00 | $1,210.00 | $1,182.50 | $1,200.00 | $1,100.00 | $1,900.00 |
| 0420 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 654 | $1.50 | $1.65 | $1.61 | $1.65 | $1.50 | $3.00 |
| 0425 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.06 | $550.00 | $600.00 | $591.25 | $650.00 | $550.00 | $1,200.00 |
| 0430 | Two component polyurethane injection (0906-173200) | LB | 16,540 | $8.00 | $6.55 | $8.60 | $9.50 | $12.00 | $12.00 |
| 0435 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $60,869 | $60,869 | $60,869 | $60,869 | $60,869 | $60,869 |
| 0440 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $13,637 | $13,637 | $13,637 | $13,637 | $13,637 | $13,637 |
| 0445 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 166 | $400.00 | $410.00 | $456.90 | $425.00 | $400.00 | $500.00 |
| 0450 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 42 | $1,900.00 | $1,965.00 | $2,257.50 | $2,000.00 | $1,900.00 | $2,500.00 |
| 0455 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $200.00 | $205.00 | $215.00 | $200.00 | $200.00 | $200.00 |
| 0460 | Single column ground sign assembly, remove (0700-1600) | EACH | 74 | $35.00 | $36.50 | $37.63 | $100.00 | $35.00 | $35.00 |
| 0465 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 2 | $100.00 | $102.00 | $107.50 | $150.00 | $100.00 | $110.00 |
| 0470 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 15 | $35.00 | $36.00 | $37.63 | $50.00 | $35.00 | $30.00 |
| 0475 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 88 | $75.00 | $77.00 | $91.40 | $100.00 | $75.00 | $90.00 |
| 0480 | Tubular marker, 36" white post (0704-1-3) | EACH | 75 | $120.00 | $125.00 | $134.40 | $125.00 | $120.00 | $250.00 |
| 0485 | Tubular marker, 36" yellow (0704-1-4) | EACH | 58 | $120.00 | $125.00 | $134.40 | $125.00 | $120.00 | $250.00 |
| 0490 | Object marker, type 1 (0705-10-1) | EACH | 7 | $200.00 | $205.00 | $268.75 | $250.00 | $200.00 | $300.00 |
| 0495 | Raised pavement marker, type B (0706-1-3) | EACH | 3,868 | $4.50 | $5.00 | $4.85 | $5.00 | $4.50 | $6.00 |
| 0500 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 935 | $1.75 | $1.94 | $1.88 | $1.75 | $1.75 | $5.00 |
| 0505 | Painted pavement markings, surface (0710-90) | LS | 1 | $53,395 | $59,000 | $57,400 | $56,000 | $53,395 | $105,000 |
| 0510 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 7,308 | $5.00 | $5.52 | $5.38 | $5.00 | $5.00 | $4.00 |
| 0515 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,143 | $6.50 | $7.25 | $7.00 | $7.00 | $6.50 | $7.00 |
| 0520 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,930 | $7.00 | $7.75 | $7.50 | $8.00 | $7.00 | $10.50 |
| 0525 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 2.70 | $1,200.00 | $1,325.00 | $1,290.00 | $1,500.00 | $1,200.00 | $3,600.00 |
| 0530 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 19 | $175.00 | $194.00 | $188.00 | $200.00 | $175.00 | $180.00 |
| 0535 | Thermoplastic, standard, arrow (0711-11170) | EACH | 132 | $55.00 | $61.00 | $59.15 | $65.00 | $55.00 | $85.00 |
| 0540 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 717 | $6.50 | $7.25 | $7.00 | $7.50 | $6.50 | $7.00 |
| 0545 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.06 | $950.00 | $1,050.00 | $1,021.25 | $1,200.00 | $950.00 | $3,600.00 |
| 0550 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,598 | $15.00 | $16.85 | $16.13 | $15.00 | $15.00 | $16.00 |
| 0555 | Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141) | GM | 0.06 | $15,000 | $16,300 | $16,125 | $16,000 | $15,000 | $11,000 |
| 0560 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 76 | $180.00 | $199.00 | $193.50 | $200.00 | $180.00 | $250.00 |
| 0565 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 74 | $95.00 | $106.00 | $102.15 | $100.00 | $95.00 | $180.00 |
| 0570 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 61 | $8.50 | $9.50 | $9.15 | $10.00 | $8.50 | $5.00 |
| 0575 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 357 | $15.00 | $16.75 | $16.13 | $17.00 | $15.00 | $8.50 |
| 0580 | Thermoplastic, preformed, black, 2-4 dotted guideline on concrete surfaces (0711-14341) | GM | 0.06 | $15,000 | $16,350 | $16,125 | $20,000 | $15,000 | $11,000 |
| 0585 | Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526) | LF | 426 | $22.00 | $24.25 | $23.65 | $25.00 | $22.00 | $19.00 |
| 0590 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 108 | $25.00 | $27.50 | $26.90 | $25.00 | $25.00 | $19.00 |
| 0595 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 439 | $18.00 | $20.00 | $19.35 | $20.00 | $18.00 | $10.50 |
| 0600 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 4 | $650.00 | $725.00 | $698.75 | $750.00 | $650.00 | $600.00 |
| 0605 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 8 | $550.00 | $617.00 | $591.25 | $600.00 | $550.00 | $725.00 |
| 0610 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 6.92 | $4,600.00 | $5,100.00 | $4,945.00 | $5,200.00 | $4,600.00 | $4,000.00 |
| 0615 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 1.22 | $4,800.00 | $5,320.00 | $5,160.00 | $5,200.00 | $4,800.00 | $6,500.00 |
| 0620 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 4.19 | $2,000.00 | $2,220.00 | $2,150.00 | $2,500.00 | $2,000.00 | $2,200.00 |
| 0625 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.10 | $6,500.00 | $7,000.00 | $6,987.50 | $7,500.00 | $6,500.00 | $10,500 |
| 0630 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 5.61 | $4,600.00 | $5,100.00 | $4,945.00 | $5,200.00 | $4,600.00 | $4,250.00 |
| 0635 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 3,971 | $1.50 | $1.65 | $1.61 | $2.00 | $1.50 | $4.00 |
| 0640 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.16 | $32,000 | $35,500 | $34,400 | $35,000 | $32,000 | $36,800 |
| 0645 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 0.10 | $37,000 | $38,300 | $39,775 | $50,000 | $37,000 | $55,000 |
| 0650 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.21 | $15,000 | $16,500 | $16,125 | $16,000 | $15,000 | $13,500 |
| 0655 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.16 | $32,000 | $35,300 | $34,400 | $35,000 | $32,000 | $36,800 |
| 0660 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.21 | $15,000 | $16,400 | $16,125 | $20,000 | $15,000 | $13,500 |
| 0665 | Conduit, furnish & install, open trench (0630-2-11) | LF | 180 | $33.00 | $24.00 | $27.15 | $25.00 | $25.24 | $20.00 |
| 0670 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 146 | $46.00 | $42.50 | $43.70 | $35.00 | $40.62 | $42.00 |
| 0675 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,785.00 | $1,400.00 | $1,680.90 | $1,200.00 | $1,563.59 | $1,000.00 |
| 0680 | Loop assembly, F&I, type B (0660-2102) | AS | 8 | $1,990.00 | $2,600.00 | $1,383.00 | $2,000.00 | $1,285.82 | $2,500.00 |
| 0685 | Loop assembly, F&I, type F (0660-2106) | AS | 68 | $1,507.00 | $2,450.00 | $1,704.00 | $2,000.00 | $1,584.75 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 25, 2026. Compiled by Mirage Metrics.