FDOT contract T2A84 bid tabulation

SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA. Let by Florida DOT on October 28, 2026, Putnam, District 2. 7 bids received; low bid $9,234,345 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
28 OCT 2026
Pay items
119
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$9,234,345Low
2Pigott Asphalt and Sitework LLC$9,862,608+7.0%
3Halifax Paving, Inc.$10,147,264+10%
4Preferred Materials Inc.$10,173,460+10%
5C.W. Roberts Contracting, Inc.$10,647,468+15%
6Hubbard Construction Company$12,282,806+33%
7Duval Asphalt Products, Inc.$12,714,781+38%
FDOT contract T2A84: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. Pigott Asphalt and Sitework LLC3. Halifax Paving, Inc.4. Preferred Materials Inc.5. C.W. Roberts Contracting, Inc.6. Hubbard Construction Company
0005Mobilization 21000475201, (0101-1)LS1$561,654$625,000$341,820$401,523$435,000$745,986
0010Maintenance of traffic 21000475201, (0102-1)DA1$283,417$300,000$225,000$222,919$280,000$724,435
0015Pedestrian or bicycle special detour 21000475201, (0102-4-1)SY1$29,962$20,000$7,500.00$4,532.74$7,000.00$24,075
0020Traffic control officer (0102-14)HR184$109.06$250.00$150.00$100.00$87.00$94.79
0025Work zone sign (0102-60)ED32,090$0.22$0.10$0.21$0.20$0.22$0.20
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED30,652$0.11$0.01$0.11$0.10$0.11$0.10
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD5,757$0.04$0.20$0.06$0.06$0.07$0.08
0040Arrow board / advance warning arrow panel (0102-76)ED640$5.45$5.00$5.00$4.80$5.00$5.13
0045Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH4,544$4.91$4.33$5.00$5.00$4.25$4.45
0050Portable changeable message sign, temporary (0102-99)ED668$10.91$10.50$14.00$10.40$10.80$10.99
0055Temporary signalization and maintenance, intersection (0102-104)ED900$9.42$0.25$8.64$8.64$9.80$9.18
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED900$9.42$0.25$8.64$8.64$9.80$9.18
0065Type III barricade (0102-115)ED1,060$0.27$0.50$0.40$0.26$0.26$0.31
0070Portable regulatory, sign (0102-150-1)ED600$5.45$1.00$5.00$4.00$4.15$5.23
0075Radar speed display unit (0102-150-2)ED600$5.45$1.00$5.00$4.00$4.15$5.23
0080Artificial coverings /rolled erosion control products (0104-1)SY250$8.88$1.00$20.00$10.45$8.15$9.42
0085Sediment barrier (0104-10-3)LF387$11.90$3.00$2.00$6.77$7.30$2.09
0090Inlet protection system (0104-18)EACH176$136.32$60.00$135.00$78.23$30.50$141.31
0095Litter removal (0107-1)ACRE1,489.50$49.07$1.00$26.00$55.00$26.15$27.21
0100Mowing (0107-2)ACRE1,152.43$21.81$1.00$55.00$25.00$55.50$57.57
0105Clearing & grubbing (0110-1-1)ACRE1$47,740$25,000$5,000.00$22,324$45,000$23,496
0110Removal of existing concrete (0110-4-10)SY526$34.35$40.00$50.00$37.50$42.40$39.11
0115Type B stabilization (0160-4)SY440$20.56$15.00$25.00$35.00$4.90$44.93
0120Optional base, base group 09 (0285-709)SY234$37.08$40.00$50.00$63.00$32.50$67.03
0125Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY245,086$1.90$2.50$2.75$1.75$1.35$3.20
0130Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY51,220$1.95$2.00$3.50$3.69$3.80$5.99
0135Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY34,414$1.30$1.00$3.00$1.82$3.75$2.35
0140Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN25,683.20$123.80$135.00$145.00$144.06$142.00$150.86
0145Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN6,344.20$171.50$195.00$180.00$200.34$227.00$213.66
0150Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN13,939.10$127.60$139.00$145.00$150.76$176.00$170.63
0155Manhole, adjust (0425-5)EACH11$1,128.26$1,800.00$2,000.00$1,250.00$1,130.00$1,857.25
0160Valve boxes, adjust (0425-6)EACH4$1,128.26$1,200.00$2,000.00$1,250.00$924.00$1,731.84
0165Pipe handrail - guiderail, relocate, steel (0515-1-41)LF63$27.26$22.50$20.00$65.00$23.50$21.25
0170Pedestrian / bicycle railing, steel, 42" type 1 (0515-2211)LF20$185.39$174.08$165.00$125.00$194.10$175.34
0175Concrete curb & gutter, type F (0520-1-10)LF401$38.17$56.00$45.00$39.50$40.00$52.34
0180Valley gutter- concrete (0520-3)LF80$38.17$100.00$45.00$52.50$36.00$52.34
0185Concrete traffic separator, special- variable width (0520-70)SY207$93.24$115.00$125.00$145.00$51.45$247.18
0190Concrete sidewalk and driveways, 4" thick (0522-1)SY72$92.69$100.00$55.00$45.00$138.90$57.85
0195Concrete sidewalk and driveways, 6" thick (0522-2)SY243$93.24$120.00$75.00$65.00$122.00$89.80
0200Detectable warnings (0527-2)SF282$27.03$35.00$35.00$37.50$48.00$39.11
0205Performance turf, sod (0570-1-2)SY24,992$2.73$3.00$4.00$4.69$4.15$5.75
0210Shoulder drop off soil (0570-13-1)CY3,806.30$4.51$1.00$20.00$32.00$1.00$33.50
0215Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH4$2,185.49$2,505.63$2,004.05$2,004.05$2,293.00$2,129.42
0220Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH4$2,647.34$2,954.00$2,427.57$2,427.57$2,778.00$2,579.44
0225Painted pavement markings, standard, white, solid, 6" (0710-11101)GM20.81$1,199.59$1,266.00$1,100.00$1,099.68$1,249.00$1,302.26
0230Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.05$1,308.64$1,371.50$1,200.00$1,200.00$1,354.00$1,411.20
0235Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF4,818$1.36$1.32$1.50$1.50$1.29$1.36
0240Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF545$1.64$1.58$1.75$1.75$1.55$1.63
0245Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF2,539$1.74$1.85$1.60$1.60$1.80$1.90
0250Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM16.29$490.75$633.00$450.00$449.89$625.00$651.16
0255Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.88$490.75$633.00$450.00$445.90$619.25$645.39
0260Painted pavement markings, standard, white, message or symbol (0710-11160)EACH99$81.79$68.58$75.00$75.00$67.70$70.56
0265Painted pavement markings, standard, white, arrows (0710-11170)EACH385$43.62$47.48$40.00$40.00$46.85$48.85
0270Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM15.70$1,199.59$1,266.00$1,100.00$1,099.44$1,249.50$1,301.97
0275Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM1.27$490.75$633.00$450.00$447.51$621.50$647.71
0280Initial contingency amount, DO not bid (0999-25)LS1$109,802$109,802$109,802$109,802$109,802$109,802
0285Initial contingency amount, DO not bid (0999-25)LS1$674.30$674.30$674.30$674.30$674.30$674.30
0290Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM13.93$2,181.07$1,800.00$2,970.00$3,450.30$3,306.50$3,138.19
0295Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH111$486.29$527.50$445.91$445.91$476.10$473.81
0300Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH27$1,587.17$2,162.75$1,455.42$1,455.42$1,554.00$1,546.47
0305Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH9$1,937.24$2,321.00$1,776.21$1,776.21$1,896.50$1,887.33
0310Single column ground sign assembly, remove (0700-1600)EACH70$117.78$59.08$108.00$108.00$115.30$114.76
0315Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH25$473.60$226.83$434.28$434.28$463.50$461.45
0320Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH8$634.41$300.68$581.75$581.75$621.10$618.14
0325Sign panel, remove, UP to 12 SF (0700-3601)EACH27$117.78$36.93$108.00$108.00$115.30$114.76
0330Sign panel, remove, 12-20 SF (0700-3602)EACH5$176.66$58.03$162.00$162.00$173.00$172.13
0335Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH46$74.01$68.58$67.87$67.87$72.45$72.12
0340Object marker, type 1 (0705-10-1)EACH27$162.88$237.38$149.35$149.35$159.45$158.69
0345Delineator, flexible tubular (0705-11-1)EACH59$168.19$110.78$154.22$154.22$164.65$163.87
0350Delineator, non-flexible (0705-11-2)EACH12$155.59$89.25$142.67$142.67$152.30$151.60
0355Raised pavement marker, type B (0706-1-3)EACH4,544$4.91$4.33$5.00$5.00$4.25$4.45
0360Painted pavement markings, surface (0710-90)LS1$80,676$84,303$73,979$73,979$84,000$144,312
0365Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.05$5,452.66$6,330.00$5,000.00$5,000.00$6,252.00$6,513.20
0370Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF4,818$4.36$4.22$4.00$4.00$4.15$4.34
0375Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF435$4.63$5.28$4.25$4.25$5.20$5.43
0380Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF870$6.54$6.33$6.00$6.00$6.20$6.51
0385Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.88$1,526.75$1,477.00$1,400.00$1,387.24$1,445.00$1,505.89
0390Thermoplastic, standard, message or symbol (0711-11160)EACH12$190.84$184.63$175.00$175.00$182.00$189.97
0395Thermoplastic, standard, arrow (0711-11170)EACH298$70.88$79.13$65.00$65.00$78.00$81.41
0400Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF110$4.63$5.28$4.25$4.25$5.20$5.43
0405Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM1.27$1,526.75$1,055.00$1,400.00$1,392.27$1,036.00$1,079.53
0410Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,669$13.09$14.77$12.00$12.00$14.50$15.20
0415Thermoplastic, preformed, white, message (0711-14160)EACH87$158.13$200.45$145.00$145.00$198.00$206.25
0420Thermoplastic, preformed, white, arrow (0711-14170)EACH87$98.16$105.50$90.00$90.00$104.00$108.55
0425Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM9.31$5,670.77$5,291.88$5,600.00$5,596.39$5,223.00$5,441.49
0430Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM8.43$1,744.85$1,392.60$1,800.00$1,799.15$1,374.00$1,432.22
0435Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM8.09$5,670.77$5,064.00$5,600.00$5,598.62$5,000.00$5,209.24
0440Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM9.26$4,798.34$5,064.00$4,600.00$4,598.51$5,000.00$5,208.84
0445Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.22$5,234.56$5,570.40$4,800.00$4,666.67$5,349.00$5,572.36
0450Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM7.86$1,526.75$1,266.00$1,500.00$1,500.00$1,250.00$1,302.63
0455Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM7.61$4,798.34$5,064.00$4,600.00$4,596.37$4,997.00$5,206.42
0460Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF1,169$3.82$1.74$3.50$3.50$1.70$1.79
0465Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.20$27,590$33,760$25,300$24,401$32,158$33,503
0470Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.20$16,903$12,660$15,500$14,949$12,694$12,563
0475Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.20$27,809$33,760$25,500$24,594$32,158$33,503
0480Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.20$16,903$12,660$15,500$14,949$12,694$12,563
0485Conduit, furnish & install, open trench (0630-2-11)LF112$27.78$21.36$25.47$25.47$29.10$27.06
0490Conduit, furnish & install, directional bore (0630-2-12)LF467$27.84$63.04$25.53$25.53$29.20$27.13
0495Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$4,431.37$10,128$4,063.49$4,063.49$4,650.00$4,317.70
0500Signal cable- repair/replace/other, furnish & install (0632-7-2)LF90$5.26$11.24$4.82$4.82$5.50$5.12
0505Signal cable, remove- intersection (0632-7-6)PI2$942.22$1,724.93$864.00$864.00$989.00$918.05
0510Span wire assembly, F&I, two point, perpendicular (0634-4151)PI2$9,644.07$3,555.35$8,843.46$8,843.46$10,119$9,396.70
0515Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH5$1,549.54$1,329.30$1,420.90$1,420.90$1,626.00$1,509.79
0520Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$3,492.70$7,021.03$3,202.74$3,202.74$3,665.00$3,403.10
0525Electrical service wire, & install (0639-2-1)LF15$6.00$8.76$5.50$5.50$6.25$5.84
0530Electrical service wire, (0639-2-6)LF50$1.18$2.06$1.08$1.08$1.22$1.15
0535Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,102.77$1,677.45$1,928.21$1,928.21$2,206.25$2,048.83
0540Prestressed concrete pole, type P-VIII (0641-2-18)EACH4$29,529$26,375$27,078$27,078$30,984$28,772
0545Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70)EACH6$12,249$4,035.38$11,232$11,232$12,852$11,935
0550Aluminum signals pole, (0646-1-11)EACH7$3,617.12$2,637.50$3,316.84$3,316.84$3,795.00$3,524.34
0555Aluminum signals pole, remove (0646-1-60)EACH6$651.89$793.36$597.78$597.78$684.00$635.18
0560Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS10$980.92$891.48$899.49$899.49$1,029.00$955.76
0565Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS5$1,903.29$875.65$1,745.29$1,745.29$1,987.00$1,854.47
0570Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS8$298.24$200.45$273.78$273.78$313.00$290.91
0575Loop assembly, F&I, type F (0660-2106)AS17$1,830.54$2,136.38$1,678.57$1,678.57$1,920.00$1,783.58
0580Pedestrian detector, furnish & install, standard (0665-1-11)EACH24$342.68$371.89$314.23$314.23$359.00$333.89
0585Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH12$58.89$78.07$54.00$54.00$61.50$57.38
0590Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH2$1,120.30$1,171.05$1,027.29$1,027.29$1,270.00$1,091.56
0595Enhanced highway sign AC powered, F&I overhead W/beacon, 31-50 SF of static sign panels (0700-141314)EACH4$7,394.64$2,505.63$6,780.76$6,780.76$7,759.00$7,204.96
FDOT contract T2A84: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy