FDOT contract T2A73 bid tabulation
SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE. Let by Florida DOT on October 28, 2026, Dist/St-Wide, St, District 2. 8 bids received; low bid $16,278,101 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 169
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $16,278,101 | Low |
| 2 | Halifax Paving, Inc. | $16,334,225 | 0.0% |
| 3 | Preferred Materials Inc. | $18,699,872 | +15% |
| 4 | DB Civil Construction, LLC | $20,589,700 | +26% |
| 5 | C.W. Matthews Contracting Co., Inc. | $20,869,141 | +28% |
| 6 | Hubbard Construction Company | $21,826,764 | +34% |
| 7 | Masci General Contractors, Inc | $24,465,702 | +50% |
| 8 | Duval Asphalt Products, Inc. | $24,567,488 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Halifax Paving, Inc. | 3. Preferred Materials Inc. | 4. DB Civil Construction, LLC | 5. C.W. Matthews Contracting Co., Inc. | 6. Hubbard Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $130,000 | $75,000 | $57,750 | $70,000 | $54,308 | $344,847 |
| 0010 | Concrete class II, approach slabs (0400-2-10) | CY | 7.10 | $3,000.00 | $3,000.00 | $2,250.00 | $2,600.00 | $1,806.10 | $1,868.05 |
| 0015 | Concrete class IV, superstructure (0400-4-4) | CY | 5.90 | $4,100.00 | $2,250.00 | $2,250.00 | $3,000.00 | $3,982.66 | $1,166.33 |
| 0020 | Reinforcing steel- approach slabs (0415-1-9) | LB | 25 | $165.00 | $250.00 | $250.00 | $70.00 | $6.60 | $20.13 |
| 0022 | Inlets, DT bot, type B, <10' (0425-1511) | EACH | 1 | $9,720.00 | $10,910 | $150,058 | $10,961 | $6,877.42 | $9,043.44 |
| 0025 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 570 | $64.00 | $70.00 | $69.00 | $82.00 | $77.06 | $134.08 |
| 0030 | Galvanized steel sidewalk plate (0458-3-1) | LF | 68 | $690.00 | $590.00 | $500.00 | $650.00 | $485.30 | $131.36 |
| 0035 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 607 | $176.00 | $200.00 | $197.50 | $220.00 | $286.21 | $207.27 |
| 0040 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 1,821 | $17.50 | $4.49 | $15.00 | $7.00 | $16.51 | $16.27 |
| 0045 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 9 | $1,209.00 | $241.22 | $1,034.00 | $350.00 | $1,138.25 | $1,121.67 |
| 0050 | Mobilization (0101-1) | LS | 1 | $420,000 | $295,200 | $341,658 | $580,000 | $471,723 | $462,845 |
| 0055 | Mobilization (0101-1) | LS | 1 | $170,000 | $333,718 | $292,714 | $580,000 | $392,682 | $492,932 |
| 0060 | Mobilization (0101-1) | LS | 1 | $150,000 | $293,500 | $260,225 | $580,000 | $587,371 | $625,554 |
| 0065 | Maintenance of traffic (0102-1) | DA | 1 | $330,000 | $115,000 | $161,039 | $240,000 | $426,477 | $614,357 |
| 0070 | Maintenance of traffic (0102-1) | DA | 1 | $50,000 | $165,000 | $236,039 | $240,000 | $246,636 | $769,334 |
| 0075 | Maintenance of traffic (0102-1) | DA | 1 | $30,000 | $60,000 | $171,039 | $240,000 | $245,976 | $478,151 |
| 0080 | Special detour- temporary pavement (0102-2200) | SY | 1 | $123,000 | $175,000 | $255,415 | $274,000 | $287,892 | $237,412 |
| 0085 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $33,000 | $75,000 | $112,924 | $650,000 | $218,396 | $413,890 |
| 0090 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,000 | $5,000.00 | $6,058.20 | $20,000 | $4,812.68 | $10,417 |
| 0095 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $7,000.00 | $5,000.00 | $12,116 | $5,000.00 | $12,336 | $19,653 |
| 0100 | Pedestrian escort/flagger (0102-5) | HR | 224 | $31.00 | $30.00 | $50.00 | $36.00 | $41.65 | $41.09 |
| 0105 | Traffic control officer (0102-14) | HR | 1,244 | $101.00 | $150.00 | $100.00 | $85.00 | $92.47 | $102.19 |
| 0110 | Work zone sign (0102-60) | ED | 41,090 | $0.19 | $0.18 | $0.20 | $0.20 | $0.23 | $0.20 |
| 0115 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 4,484 | $34.00 | $33.00 | $33.00 | $40.00 | $39.41 | $36.08 |
| 0120 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 5,506 | $34.10 | $33.00 | $33.00 | $40.00 | $39.39 | $36.08 |
| 0125 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 70 | $22.75 | $22.00 | $22.00 | $30.00 | $27.51 | $24.05 |
| 0130 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 3,293 | $18.60 | $18.00 | $18.00 | $23.00 | $23.08 | $19.68 |
| 0135 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 4,830 | $16.50 | $16.00 | $16.00 | $20.00 | $20.79 | $17.49 |
| 0137 | Temporary barrier, F&I, type K (0102-71105) | LF | 608 | $46.50 | $95.00 | $35.00 | $40.00 | $107.86 | $103.87 |
| 0140 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 127,020 | $0.09 | $0.08 | $0.10 | $0.10 | $0.12 | $0.09 |
| 0145 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 33,172 | $0.07 | $0.06 | $0.03 | $0.20 | $0.07 | $0.07 |
| 0150 | Arrow board / advance warning arrow panel (0102-76) | ED | 980 | $5.15 | $5.00 | $5.00 | $6.00 | $5.28 | $5.57 |
| 0155 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 5,870 | $4.20 | $4.50 | $4.00 | $5.00 | $4.95 | $4.37 |
| 0160 | Temporary crash cushion, redirective option (0102-89-1) | LO | 10 | $986.00 | $3,500.00 | $950.00 | $1,100.00 | $825.61 | $2,147.37 |
| 0165 | Portable changeable message sign, temporary (0102-99) | ED | 2,024 | $13.45 | $13.00 | $10.00 | $15.00 | $11.45 | $14.49 |
| 0170 | Temporary signalization and maintenance, intersection (0102-104) | ED | 3,360 | $19.85 | $19.44 | $17.00 | $25.00 | $18.71 | $18.44 |
| 0175 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 3,360 | $16.35 | $40.24 | $14.00 | $50.00 | $15.41 | $15.19 |
| 0180 | Type III barricade (0102-115) | ED | 6,760 | $0.37 | $0.35 | $0.25 | $0.50 | $0.30 | $0.39 |
| 0185 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 90 | $41.00 | $150.00 | $40.00 | $30.00 | $27.56 | $28.71 |
| 0190 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.81 | $4.15 | $12,500 | $13,366 | $14,000 | $13,794 | $14,609 |
| 0195 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.81 | $33,300 | $12,500 | $13,366 | $14,000 | $13,794 | $14,609 |
| 0200 | Sediment barrier (0104-10-3) | LF | 44,651 | $0.85 | $1.50 | $1.92 | $1.50 | $1.93 | $1.29 |
| 0205 | Floating turbidity barrier (0104-11) | LF | 2,546 | $10.80 | $12.00 | $19.64 | $12.00 | $17.25 | $13.42 |
| 0210 | Inlet protection system (0104-18) | EACH | 214 | $154.60 | $165.00 | $107.51 | $150.00 | $281.35 | $144.98 |
| 0215 | Litter removal (0107-1) | ACRE | 1,787.51 | $46.10 | $45.00 | $70.00 | $10.00 | $30.92 | $69.81 |
| 0220 | Mowing (0107-2) | ACRE | 1,207.82 | $87.17 | $85.00 | $70.00 | $60.00 | $35.85 | $134.24 |
| 0225 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $200,000 | $20,000 | $93,293 | $100,000 | $16,684 | $107,394 |
| 0230 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $100,000 | $40,000 | $593,106 | $100,000 | $141,572 | $394,684 |
| 0235 | Removal of existing concrete (0110-4-10) | SY | 4,370 | $28.25 | $40.00 | $32.50 | $33.00 | $29.92 | $46.53 |
| 0240 | Regular excavation (0120-1) | CY | 4,780 | $17.00 | $40.00 | $18.26 | $25.00 | $20.67 | $27.44 |
| 0245 | Subsoil excavation (0120-4) | CY | 508.30 | $50.00 | $75.00 | $52.84 | $58.00 | $37.28 | $35.79 |
| 0250 | Embankment (0120-6) | CY | 5,389.40 | $24.60 | $24.00 | $20.07 | $35.00 | $18.87 | $30.98 |
| 0255 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $6,054.00 | $50,000 | $6,995.05 | $80,000 | $2,144.99 | $6,645.78 |
| 0260 | Flowable fill (0121-70) | CY | 0.30 | $5,000.00 | $5,000.00 | $2,250.00 | $4,000.00 | $2,402.60 | $6,064.47 |
| 0265 | Type B stabilization (0160-4) | SY | 32,247 | $11.10 | $7.50 | $12.18 | $18.00 | $9.82 | $10.77 |
| 0270 | Optional base, base group 01 (0285-701) | SY | 19,041 | $23.00 | $26.00 | $26.80 | $36.00 | $28.50 | $26.28 |
| 0275 | Optional base, base group 05 (0285-705) | SY | 10,241 | $19.20 | $24.00 | $19.22 | $26.00 | $20.13 | $19.98 |
| 0280 | Optional base, base group 09 (0285-709) | SY | 23 | $104.00 | $100.00 | $220.71 | $220.00 | $161.27 | $146.06 |
| 0285 | Coarse aggregate base special design, 24" (0289-1104) | SY | 1,833 | $119.00 | $125.00 | $172.24 | $120.00 | $95.62 | $62.23 |
| 0290 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 325,966 | $1.75 | $2.50 | $1.50 | $3.50 | $4.02 | $3.37 |
| 0295 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 28,640 | $6.50 | $3.50 | $3.14 | $4.00 | $10.90 | $9.49 |
| 0300 | Milling existing asphalt pavement, 5 1/2" avg depth (0327-70-18) | SY | 95 | $57.75 | $20.00 | $15.00 | $55.00 | $62.97 | $56.24 |
| 0305 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 2,436 | $133.75 | $140.00 | $148.98 | $140.00 | $151.91 | $136.48 |
| 0310 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 35.30 | $442.00 | $300.00 | $347.65 | $300.00 | $308.50 | $278.61 |
| 0315 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 40,085.50 | $158.00 | $145.00 | $167.42 | $170.00 | $188.79 | $170.04 |
| 0320 | Miscellaneous asphalt (0339-1) | TN | 196.10 | $307.00 | $225.00 | $322.37 | $350.00 | $367.67 | $333.28 |
| 0325 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 766.50 | $825.00 | $825.00 | $950.00 | $1,100.00 | $1,321.69 | $820.49 |
| 0330 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 3 | $8,645.00 | $11,220 | $11,550 | $9,500.00 | $9,322.98 | $8,287.02 |
| 0335 | Inlets, closed flume (0425-1910) | EACH | 2 | $5,251.00 | $7,560.00 | $4,850.00 | $7,500.00 | $2,016.17 | $3,819.11 |
| 0340 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $7,163.00 | $9,450.00 | $7,550.00 | $7,000.00 | $7,247.23 | $6,383.17 |
| 0345 | Manhole, adjust (0425-5) | EACH | 27 | $781.00 | $1,500.00 | $1,260.00 | $850.00 | $992.13 | $1,678.77 |
| 0355 | Valve boxes, adjust (0425-6) | EACH | 107 | $361.00 | $500.00 | $1,260.00 | $120.00 | $684.13 | $882.01 |
| 0365 | Manhole cover- replace (0425-7) | EACH | 8 | $756.00 | $4,600.00 | $1,050.00 | $1,800.00 | $594.32 | $594.12 |
| 0370 | Special drainage structure, utility conflict manhole, type J bottom (0425-100102) | EACH | 1 | $14,915 | $10,950 | $30,000 | $15,000 | $8,584.48 | $10,709 |
| 0375 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 251 | $168.40 | $118.00 | $205.00 | $160.00 | $104.83 | $130.73 |
| 0380 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 209 | $158.50 | $122.00 | $225.00 | $250.00 | $123.57 | $192.57 |
| 0385 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 35 | $180.00 | $132.00 | $205.00 | $210.00 | $116.75 | $141.14 |
| 0390 | U-endwall with baffles, index 261/430-011, 1:4 slope, 18"pipe (0430-611125) | EACH | 3 | $4,065.00 | $7,040.00 | $3,075.00 | $6,000.00 | $3,596.51 | $4,709.38 |
| 0395 | Flap gates, 0-24" (0430-880-01) | EACH | 1 | $7,917.00 | $19,850 | $6,250.00 | $10,000 | $8,063.50 | $10,932 |
| 0400 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $4,110.00 | $10,560 | $2,850.00 | $2,800.00 | $2,814.27 | $4,795.09 |
| 0405 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 12 | $2,443.00 | $6,620.00 | $2,850.00 | $3,000.00 | $2,940.20 | $3,076.17 |
| 0410 | Trench drain, special design (0436-1-3) | LF | 74 | $303.00 | $395.00 | $650.00 | $350.00 | $209.80 | $107.88 |
| 0415 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 90 | $83.70 | $80.00 | $80.00 | $110.00 | $88.07 | $70.87 |
| 0420 | Pedestrian/ bicycle railing, steel only,48" type 1 (0515-2231) | LF | 2,941 | $99.20 | $116.00 | $116.00 | $115.00 | $127.69 | $152.64 |
| 0425 | Bollards (0519-78) | EACH | 4 | $1,035.00 | $1,500.00 | $950.00 | $700.00 | $1,011.09 | $1,946.52 |
| 0430 | Concrete curb & gutter, type F (0520-1-10) | LF | 5,948 | $33.25 | $35.00 | $37.75 | $36.00 | $38.19 | $38.08 |
| 0435 | Concrete curb, type D (0520-2-4) | LF | 39 | $125.00 | $56.00 | $37.75 | $45.00 | $46.79 | $47.78 |
| 0440 | Valley gutter- concrete (0520-3) | LF | 57 | $76.25 | $70.00 | $37.75 | $65.00 | $43.95 | $44.96 |
| 0445 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 295 | $50.50 | $68.00 | $58.75 | $108.00 | $55.16 | $104.71 |
| 0450 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 592 | $54.10 | $68.00 | $48.50 | $98.00 | $69.78 | $78.02 |
| 0455 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 2,771 | $70.00 | $74.00 | $72.50 | $100.00 | $101.21 | $87.15 |
| 0460 | Detectable warnings (0527-2) | SF | 2,963 | $20.75 | $31.00 | $35.50 | $30.00 | $42.38 | $45.11 |
| 0465 | Riprap- rubble, bank and shore (0530-3-3) | TN | 44 | $346.00 | $182.00 | $136.50 | $300.00 | $208.90 | $171.28 |
| 0470 | Bedding stone (0530-74) | TN | 343 | $219.00 | $125.00 | $97.50 | $200.00 | $205.69 | $171.92 |
| 0475 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 62 | $20.00 | $19.50 | $19.50 | $22.00 | $21.47 | $21.81 |
| 0480 | Guardrail -roadway, general (0536-1-1) | LF | 4,854 | $25.00 | $24.00 | $24.00 | $26.00 | $26.42 | $28.35 |
| 0485 | Pipe rail for guardrail (0536-6) | LF | 5,034 | $18.70 | $18.25 | $143.25 | $20.00 | $20.09 | $19.63 |
| 0490 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 1 | $2,802.00 | $2,725.00 | $2,725.00 | $3,000.00 | $2,999.73 | $2,998.32 |
| 0495 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 1 | $3,779.00 | $3,675.00 | $3,675.00 | $4,000.00 | $4,045.50 | $3,816.04 |
| 0500 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 1 | $1,748.00 | $1,700.00 | $1,700.00 | $1,800.00 | $1,871.39 | $1,908.02 |
| 0505 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 1 | $2,544.00 | $2,475.00 | $2,475.00 | $2,800.00 | $2,724.52 | $3,270.89 |
| 0510 | Guardrail removal (0536-73) | LF | 4,402 | $2.30 | $2.25 | $2.25 | $3.00 | $2.48 | $2.18 |
| 0515 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 5 | $1,594.00 | $1,550.00 | $1,550.00 | $1,700.00 | $1,706.27 | $1,962.53 |
| 0520 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $2,571.00 | $2,500.00 | $2,500.00 | $2,800.00 | $2,752.04 | $3,597.98 |
| 0525 | Fencing, wood fence, 0.0-5.0' (0550-10410) | LF | 62 | $102.00 | $50.00 | $100.00 | $75.00 | $28.62 | $129.91 |
| 0530 | Performance turf, sod (0570-1-2) | SY | 52,995 | $4.50 | $4.00 | $3.58 | $3.00 | $6.75 | $6.37 |
| 0535 | Shoulder drop off soil (0570-13-1) | CY | 4,236.90 | $1.00 | $20.00 | $33.71 | $20.00 | $41.92 | $42.96 |
| 0540 | Pull & splice box, install (0635-2-30) | EACH | 35 | $1,232.00 | $1,242.03 | $1,054.00 | $1,600.00 | $1,160.26 | $1,143.37 |
| 0545 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 12 | $3,446.00 | $2,135.16 | $2,948.00 | $2,700.00 | $3,245.21 | $3,197.96 |
| 0550 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 12 | $2,766.00 | $1,974.24 | $2,366.00 | $2,500.00 | $2,604.53 | $2,566.61 |
| 0555 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 36.07 | $1,475.00 | $1,200.00 | $1,399.96 | $1,400.00 | $1,320.94 | $1,530.09 |
| 0560 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.43 | $1,565.00 | $1,500.00 | $1,486.18 | $1,700.00 | $1,636.01 | $1,624.33 |
| 0565 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 12,153 | $0.85 | $1.50 | $0.80 | $2.00 | $1.65 | $0.87 |
| 0570 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 603 | $1.31 | $1.75 | $1.25 | $3.00 | $1.93 | $1.37 |
| 0575 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,388 | $1.56 | $2.00 | $1.50 | $4.00 | $2.20 | $1.64 |
| 0580 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 7.35 | $737.00 | $450.00 | $699.43 | $600.00 | $495.64 | $764.44 |
| 0585 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.18 | $1,432.00 | $450.00 | $1,360.00 | $580.00 | $509.54 | $1,486.40 |
| 0590 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.78 | $735.00 | $450.00 | $697.24 | $600.00 | $496.20 | $762.05 |
| 0595 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 28.73 | $1,474.00 | $1,200.00 | $1,399.85 | $1,400.00 | $1,320.84 | $1,529.97 |
| 0600 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 2,484 | $1.30 | $1.75 | $1.25 | $3.00 | $1.93 | $1.37 |
| 0605 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 5.51 | $737.00 | $450.00 | $699.62 | $600.00 | $495.10 | $764.65 |
| 0610 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.35 | $729.00 | $450.00 | $692.09 | $600.00 | $489.77 | $756.44 |
| 0615 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,250 | $50,250 | $50,250 | $50,250 | $50,250 | $50,250 |
| 0620 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $56,250 | $56,250 | $56,250 | $56,250 | $56,250 | $56,250 |
| 0625 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $43,500 | $43,500 | $43,500 | $43,500 | $43,500 | $43,500 |
| 0630 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 11.52 | $3,909.00 | $4,000.00 | $5,331.41 | $4,200.00 | $4,222.08 | $4,464.61 |
| 0635 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 177 | $535.40 | $525.00 | $525.00 | $600.00 | $577.93 | $694.27 |
| 0640 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 69 | $2,141.00 | $2,300.00 | $2,100.00 | $2,300.00 | $2,311.72 | $2,694.62 |
| 0645 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 3 | $2,294.00 | $2,600.00 | $2,250.00 | $2,400.00 | $2,476.84 | $3,210.98 |
| 0650 | Single column ground sign assembly, relocate (0700-1500) | EACH | 16 | $152.00 | $150.00 | $150.00 | $160.00 | $165.12 | $184.41 |
| 0655 | Single column ground sign assembly, remove (0700-1600) | EACH | 141 | $51.50 | $35.00 | $50.00 | $60.00 | $55.04 | $43.39 |
| 0660 | Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913) | EACH | 2 | $3,059.00 | $3,800.00 | $3,000.00 | $3,500.00 | $3,302.45 | $6,379.65 |
| 0665 | Single column ground sign assembly, F&I cantilever mount, 30.1+ SF (0700-1914) | EACH | 1 | $3,569.00 | $4,100.00 | $3,500.00 | $4,900.00 | $3,852.86 | $6,848.28 |
| 0670 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 2 | $4,589.00 | $9,500.00 | $4,500.00 | $4,800.00 | $4,953.68 | $5,984.79 |
| 0675 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 3 | $7,904.00 | $12,500 | $7,750.00 | $8,500.00 | $8,531.33 | $9,464.79 |
| 0680 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 8 | $407.00 | $1,200.00 | $400.00 | $450.00 | $440.33 | $130.18 |
| 0685 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 1 | $101.00 | $275.00 | $100.00 | $150.00 | $110.08 | $206.11 |
| 0690 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 1 | $50.50 | $75.00 | $50.00 | $60.00 | $55.04 | $113.90 |
| 0695 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $35.65 | $25.00 | $35.00 | $40.00 | $38.53 | $21.69 |
| 0700 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 40 | $35.65 | $125.00 | $35.00 | $40.00 | $38.53 | $95.46 |
| 0705 | Object marker, type 1 (0705-10-1) | EACH | 24 | $229.25 | $325.00 | $225.00 | $240.00 | $247.68 | $316.76 |
| 0710 | Raised pavement marker, type B (0706-1-3) | EACH | 5,870 | $4.20 | $4.50 | $4.00 | $5.00 | $4.95 | $4.37 |
| 0715 | Painted pavement markings, surface (0710-90) | LS | 1 | $52,680 | $54,500 | $50,000 | $60,000 | $59,995 | $128,105 |
| 0720 | Painted pavement markings, surface (0710-90) | LS | 1 | $63,218 | $54,500 | $60,000 | $60,000 | $59,995 | $139,035 |
| 0725 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 12,519 | $4.20 | $5.00 | $4.00 | $6.00 | $5.50 | $4.37 |
| 0730 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 603 | $5.25 | $7.00 | $5.00 | $8.00 | $7.71 | $5.46 |
| 0735 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,879 | $6.30 | $8.00 | $6.00 | $9.00 | $8.81 | $6.56 |
| 0740 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.78 | $3,673.00 | $1,500.00 | $3,486.21 | $1,700.00 | $1,654.01 | $3,810.27 |
| 0745 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 21 | $210.70 | $160.00 | $200.00 | $200.00 | $176.13 | $218.59 |
| 0750 | Thermoplastic, standard, arrow (0711-11170) | EACH | 290 | $84.25 | $65.00 | $80.00 | $80.00 | $71.55 | $87.44 |
| 0755 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 2,484 | $5.25 | $7.00 | $5.00 | $8.00 | $7.71 | $5.46 |
| 0760 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.36 | $3,647.00 | $1,600.00 | $3,461.54 | $1,700.00 | $1,790.33 | $3,783.30 |
| 0765 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,685 | $14.70 | $12.00 | $14.00 | $14.00 | $13.21 | $15.30 |
| 0770 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 121 | $200.15 | $140.00 | $190.00 | $160.00 | $154.11 | $207.66 |
| 0775 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 121 | $94.80 | $85.00 | $90.00 | $100.00 | $93.57 | $98.37 |
| 0780 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 784 | $14.70 | $22.00 | $14.00 | $25.00 | $24.22 | $15.30 |
| 0785 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 27.54 | $5,373.00 | $4,200.00 | $5,099.81 | $4,800.00 | $4,623.26 | $5,573.86 |
| 0790 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.43 | $5,741.00 | $5,500.00 | $5,449.31 | $6,000.00 | $5,998.69 | $5,955.85 |
| 0795 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 7.35 | $2,632.00 | $1,600.00 | $2,497.96 | $1,900.00 | $1,762.27 | $2,730.15 |
| 0800 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.18 | $5,118.00 | $8,500.00 | $4,857.14 | $9,000.00 | $9,624.29 | $5,308.63 |
| 0805 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 19.71 | $5,372.00 | $4,200.00 | $5,098.19 | $4,800.00 | $4,624.14 | $5,572.08 |
| 0810 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 5.51 | $2,632.00 | $1,600.00 | $2,498.64 | $1,900.00 | $1,760.35 | $2,730.90 |
| 0815 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 128 | $1.55 | $1.00 | $1.50 | $2.00 | $1.10 | $1.64 |
| 0820 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 1.23 | $33,661 | $25,000 | $31,948 | $28,000 | $27,476 | $34,918 |
| 0825 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 1.17 | $33,715 | $25,000 | $32,000 | $28,000 | $27,520 | $34,975 |
| 0830 | Permanent tape, yellow, 10-30 skip, 6" wide, for concrete surfaces (0713-103281) | GM | 0.05 | $11,927 | $15,000 | $11,321 | $16,000 | $15,578 | $12,373 |
| 0835 | Preformed/permanent tape, remove (0713-107) | SF | 6,684 | $1.55 | $1.00 | $1.50 | $2.00 | $1.10 | $1.64 |
| 0840 | Loop assembly, F&I, type B (0660-2102) | AS | 55 | $1,536.00 | $1,268.46 | $1,314.00 | $1,700.00 | $1,446.47 | $1,425.41 |
| 0845 | Loop assembly, F&I, type F (0660-2106) | AS | 40 | $1,992.00 | $1,484.46 | $1,704.00 | $1,900.00 | $1,875.79 | $1,848.48 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.