| 0005 | Mobilization (0101-1) | LS | 1 | $752,192 | $747,777 | $572,036 | $533,625 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $349,007 | $950,000 | $863,074 | $1,676,355 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $7,472.39 | $24,000 | $1,000.00 | $11,350 |
| 0020 | Traffic control officer (0102-14) | HR | 1,348 | $98.55 | $105.00 | $85.00 | $101.94 |
| 0025 | Work zone sign (0102-60) | ED | 37,019 | $0.24 | $0.24 | $0.18 | $0.23 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 65,291 | $0.10 | $0.10 | $0.09 | $0.10 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 20,572 | $0.06 | $0.06 | $0.04 | $0.06 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 60 | $5.64 | $5.50 | $5.00 | $5.51 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 2,408 | $11.27 | $10.50 | $8.00 | $11.03 |
| 0050 | Temporary signalization and maintenance, intersection (0102-104) | ED | 990 | $32.41 | $12.50 | $10.59 | $36.95 |
| 0055 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 990 | $21.36 | $38.50 | $37.37 | $1.09 |
| 0060 | Type III barricade (0102-115) | ED | 566 | $0.39 | $0.40 | $0.25 | $0.39 |
| 0065 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 244 | $31.56 | $30.00 | $18.00 | $30.87 |
| 0070 | Sediment barrier (0104-10-3) | LF | 1,449 | $4.98 | $1.00 | $3.98 | $3.41 |
| 0075 | Floating turbidity barrier (0104-11) | LF | 42 | $82.42 | $15.00 | $33.22 | $15.17 |
| 0080 | Inlet protection system (0104-18) | EACH | 78 | $231.37 | $115.00 | $151.75 | $167.90 |
| 0085 | Litter removal (0107-1) | ACRE | 1,363.60 | $100.00 | $125.00 | $100.00 | $45.50 |
| 0090 | Mowing (0107-2) | ACRE | 1,196.49 | $100.00 | $125.00 | $105.00 | $92.07 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $67,182 | $79,000 | $141,601 | $188,829 |
| 0100 | Removal of existing concrete (0110-4-10) | SY | 662 | $39.04 | $58.00 | $34.64 | $39.50 |
| 0105 | Tree protection barrier (0110-21) | LF | 1,154 | $13.14 | $3.75 | $3.50 | $8.34 |
| 0110 | Optional base, base group 01 (0285-701) | SY | 6,420 | $9.33 | $30.00 | $15.42 | $21.02 |
| 0115 | Turnout base- optional materials (0286-1) | SY | 161 | $53.77 | $80.00 | $123.75 | $103.27 |
| 0120 | Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3) | SY | 57,107 | $3.98 | $4.25 | $6.05 | $9.14 |
| 0125 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 9,855 | $2.79 | $2.80 | $6.39 | $5.32 |
| 0130 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 174,434 | $1.69 | $1.80 | $2.46 | $3.85 |
| 0135 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 3,663 | $4.45 | $3.25 | $4.90 | $4.18 |
| 0140 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 2,216 | $5.58 | $4.50 | $5.63 | $23.18 |
| 0145 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 22,225 | $134.88 | $170.00 | $173.50 | $167.50 |
| 0150 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 22,357.20 | $137.14 | $165.00 | $179.70 | $189.43 |
| 0155 | Miscellaneous asphalt (0339-1) | TN | 67.10 | $735.48 | $315.00 | $728.03 | $2,755.21 |
| 0160 | Inlets, closed flume (0425-1910) | EACH | 4 | $6,549.96 | $12,050 | $5,811.94 | $6,627.01 |
| 0165 | Manhole, adjust (0425-5) | EACH | 3 | $1,445.74 | $1,725.00 | $1,282.84 | $3,302.33 |
| 0170 | Manhole, adjust, utilities (0425-5-1) | EACH | 14 | $1,445.74 | $1,725.00 | $1,282.84 | $3,302.47 |
| 0175 | Valve boxes, adjust (0425-6) | EACH | 15 | $1,445.73 | $1,575.00 | $1,282.84 | $2,192.45 |
| 0180 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 56 | $77.75 | $70.00 | $145.00 | $162.48 |
| 0185 | Polymer nosing for bridge expansion joint (0458-2) | CF | 11.70 | $1,126.98 | $1,025.00 | $1,125.00 | $1,299.87 |
| 0190 | Concrete curb & gutter, type F (0520-1-10) | LF | 260 | $45.99 | $70.00 | $40.81 | $46.53 |
| 0195 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 55 | $69.58 | $205.00 | $61.75 | $70.41 |
| 0200 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 485 | $89.59 | $78.00 | $79.50 | $90.65 |
| 0205 | Concrete ditch pavement, 6", reinforced (0524-1-49) | SY | 19 | $343.19 | $610.00 | $304.52 | $347.23 |
| 0210 | Detectable warnings (0527-2) | SF | 651 | $38.35 | $48.00 | $34.03 | $38.80 |
| 0215 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 21.40 | $336.85 | $540.00 | $175.57 | $200.19 |
| 0220 | Bedding stone (0530-74) | TN | 15.40 | $429.12 | $420.00 | $175.57 | $200.19 |
| 0225 | Guardrail -roadway, general (0536-1-1) | LF | 1,066 | $29.30 | $31.00 | $21.00 | $23.07 |
| 0230 | Pipe rail for guardrail (0536-6) | LF | 115 | $16.91 | $20.00 | $19.00 | $19.92 |
| 0235 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 2 | $309.92 | $280.00 | $575.00 | $371.59 |
| 0240 | Guardrail removal (0536-73) | LF | 1,073 | $2.25 | $5.15 | $2.50 | $2.49 |
| 0245 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $2,234.81 | $1,850.00 | $1,700.00 | $1,311.95 |
| 0250 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 12 | $3,369.69 | $3,075.00 | $3,000.00 | $3,321.41 |
| 0255 | Performance turf, sod (0570-1-2) | SY | 37,318 | $2.92 | $4.50 | $3.91 | $2.96 |
| 0260 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 150 | $2.92 | $30.00 | $91.41 | $13.79 |
| 0265 | Raised pavement marker, type B (0706-1-3) | EACH | 5,084 | $5.35 | $5.05 | $4.75 | $4.38 |
| 0270 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 27.59 | $2,479.36 | $1,325.00 | $2,200.00 | $3,828.76 |
| 0275 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 2,556 | $2.25 | $2.05 | $2.00 | $1.09 |
| 0280 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,060 | $2.93 | $2.55 | $2.60 | $3.28 |
| 0285 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 2.16 | $467.69 | $805.00 | $415.00 | $873.30 |
| 0290 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.13 | $822.69 | $805.00 | $730.00 | $1,025.78 |
| 0295 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 16 | $84.52 | $86.00 | $75.00 | $109.42 |
| 0300 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 77 | $73.25 | $45.50 | $65.00 | $60.18 |
| 0305 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 17.42 | $2,479.36 | $1,325.00 | $2,200.00 | $3,828.50 |
| 0310 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,019 | $2.82 | $2.30 | $2.50 | $2.19 |
| 0315 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 6.26 | $467.69 | $805.00 | $415.00 | $874.36 |
| 0320 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.12 | $822.69 | $805.00 | $730.00 | $104.61 |
| 0325 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $134,229 | $134,229 | $134,229 | $134,229 |
| 0330 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 23.09 | $1,859.53 | $1,660.00 | $1,947.51 | $2,190.71 |
| 0335 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 57 | $535.32 | $395.00 | $475.00 | $435.57 |
| 0340 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 16 | $2,592.06 | $2,225.00 | $2,300.00 | $2,457.06 |
| 0345 | Single column ground sign assembly, relocate (0700-1500) | EACH | 1 | $197.22 | $153.00 | $175.00 | $167.53 |
| 0350 | Single column ground sign assembly, remove (0700-1600) | EACH | 63 | $67.61 | $52.00 | $60.00 | $55.84 |
| 0355 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 21 | $214.12 | $255.00 | $190.00 | $279.21 |
| 0360 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 20 | $33.81 | $37.00 | $30.00 | $39.09 |
| 0365 | Object marker, type 2 (0705-10-2) | EACH | 16 | $67.61 | $380.00 | $60.00 | $418.82 |
| 0370 | Object marker, type 3 (0705-10-3) | EACH | 6 | $304.29 | $380.00 | $270.00 | $418.82 |
| 0375 | Raised pavement marker, type B (0706-1-3) | EACH | 4,156 | $5.35 | $5.05 | $4.75 | $4.38 |
| 0380 | Painted pavement markings, surface (0710-90) | LS | 1 | $112,698 | $120,000 | $100,000 | $309,760 |
| 0385 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,506 | $3.94 | $6.25 | $3.50 | $3.94 |
| 0390 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 982 | $5.07 | $6.50 | $4.50 | $5.47 |
| 0395 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,377 | $9.02 | $7.75 | $8.00 | $8.75 |
| 0400 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.06 | $2,930.15 | $2,150.00 | $2,600.00 | $2,647.26 |
| 0405 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 16 | $135.24 | $195.00 | $120.00 | $164.13 |
| 0410 | Thermoplastic, standard, arrow (0711-11170) | EACH | 121 | $107.07 | $75.00 | $95.00 | $109.42 |
| 0415 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 3,106 | $5.07 | $6.50 | $4.50 | $5.47 |
| 0420 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.12 | $2,930.15 | $2,100.00 | $2,600.00 | $2,616.52 |
| 0425 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,270 | $14.65 | $15.00 | $13.00 | $16.41 |
| 0430 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 58 | $5.07 | $10.50 | $4.50 | $7.11 |
| 0435 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 529 | $10.14 | $17.00 | $9.00 | $14.22 |
| 0440 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 26.53 | $4,057.14 | $5,000.00 | $3,600.00 | $5,578.58 |
| 0445 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 2.15 | $1,746.83 | $2,250.00 | $1,550.00 | $1,747.42 |
| 0450 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 15.65 | $4,057.14 | $5,000.00 | $3,600.00 | $5,580.27 |
| 0455 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 6.26 | $1,746.83 | $2,250.00 | $1,550.00 | $1,748.71 |
| 0460 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 663 | $2.82 | $5.25 | $2.50 | $2.74 |
| 0465 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.12 | $45,079 | $37,000 | $40,000 | $48,037 |
| 0470 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.12 | $45,079 | $37,000 | $40,000 | $48,037 |
| 0475 | Preformed/permanent tape, remove (0713-107) | SF | 649 | $2.82 | $5.25 | $2.50 | $5.47 |
| 0480 | Conduit, furnish & install, open trench (0630-2-11) | LF | 679 | $19.56 | $17.35 | $17.22 | $23.85 |
| 0485 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 646 | $54.33 | $66.50 | $66.41 | $59.09 |
| 0490 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 3 | $15,183 | $5,600.00 | $5,553.33 | $12,342 |
| 0495 | Signal cable, remove- intersection (0632-7-6) | PI | 3 | $1,853.40 | $1,100.00 | $1,085.00 | $2,259.46 |
| 0500 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 27 | $1,843.84 | $1,450.00 | $1,406.96 | $1,826.17 |
| 0505 | Aluminum signals pole, (0646-1-11) | EACH | 1 | $3,514.84 | $3,575.00 | $3,562.00 | $4,261.79 |
| 0510 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 5 | $2,638.95 | $3,400.00 | $3,342.00 | $3,867.89 |
| 0515 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 16 | $914.12 | $620.00 | $617.63 | $968.34 |
| 0520 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 2 | $1,223.63 | $1,000.00 | $993.00 | $1,220.00 |
| 0525 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 3 | $2,371.20 | $1,275.00 | $1,272.67 | $2,647.89 |
| 0530 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 2 | $242.30 | $555.00 | $552.00 | $76.87 |
| 0535 | Loop assembly, F&I, type B (0660-2102) | AS | 4 | $1,403.89 | $3,225.00 | $3,219.50 | $2,002.33 |
| 0540 | Loop assembly, F&I, type F (0660-2106) | AS | 11 | $2,104.09 | $2,600.00 | $2,586.09 | $2,181.78 |
| 0545 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 18 | $580.76 | $432.00 | $429.56 | $408.13 |
| 0550 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 12 | $84.90 | $348.00 | $345.75 | $76.59 |
| 0555 | Traffic controller, modify (0671-2-40) | EACH | 3 | $4,127.99 | $1,300.00 | $1,294.67 | $2,910.49 |
| 0560 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 3 | $4,738.53 | $1,440.00 | $1,434.33 | $3,025.38 |