FDOT contract T2A38 bid tabulation

SR 16 FROM SR 21 TO SR 15 (US 17). Let by Florida DOT on September 24, 2025, Clay, District 2. 4 bids received; low bid $9,992,549 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
24 SEP 2025
Pay items
112
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$9,992,549Low
2Duval Asphalt Products, Inc.$12,279,261+23%
3Preferred Materials Inc.$12,382,391+24%
4Hubbard Construction Company$14,329,059+43%
FDOT contract T2A38: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. Duval Asphalt Products, Inc.3. Preferred Materials Inc.4. Hubbard Construction Company
0005Mobilization (0101-1)LS1$752,192$747,777$572,036$533,625
0010Maintenance of traffic (0102-1)DA1$349,007$950,000$863,074$1,676,355
0015Pedestrian or bicycle special detour (0102-4-1)SY1$7,472.39$24,000$1,000.00$11,350
0020Traffic control officer (0102-14)HR1,348$98.55$105.00$85.00$101.94
0025Work zone sign (0102-60)ED37,019$0.24$0.24$0.18$0.23
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED65,291$0.10$0.10$0.09$0.10
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD20,572$0.06$0.06$0.04$0.06
0040Arrow board / advance warning arrow panel (0102-76)ED60$5.64$5.50$5.00$5.51
0045Portable changeable message sign, temporary (0102-99)ED2,408$11.27$10.50$8.00$11.03
0050Temporary signalization and maintenance, intersection (0102-104)ED990$32.41$12.50$10.59$36.95
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED990$21.36$38.50$37.37$1.09
0060Type III barricade (0102-115)ED566$0.39$0.40$0.25$0.39
0065Temporary raised rumble per day, includes all sets and relocations (0102-909)DA244$31.56$30.00$18.00$30.87
0070Sediment barrier (0104-10-3)LF1,449$4.98$1.00$3.98$3.41
0075Floating turbidity barrier (0104-11)LF42$82.42$15.00$33.22$15.17
0080Inlet protection system (0104-18)EACH78$231.37$115.00$151.75$167.90
0085Litter removal (0107-1)ACRE1,363.60$100.00$125.00$100.00$45.50
0090Mowing (0107-2)ACRE1,196.49$100.00$125.00$105.00$92.07
0095Clearing & grubbing (0110-1-1)ACRE1$67,182$79,000$141,601$188,829
0100Removal of existing concrete (0110-4-10)SY662$39.04$58.00$34.64$39.50
0105Tree protection barrier (0110-21)LF1,154$13.14$3.75$3.50$8.34
0110Optional base, base group 01 (0285-701)SY6,420$9.33$30.00$15.42$21.02
0115Turnout base- optional materials (0286-1)SY161$53.77$80.00$123.75$103.27
0120Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3)SY57,107$3.98$4.25$6.05$9.14
0125Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY9,855$2.79$2.80$6.39$5.32
0130Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY174,434$1.69$1.80$2.46$3.85
0135Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY3,663$4.45$3.25$4.90$4.18
0140Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY2,216$5.58$4.50$5.63$23.18
0145Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN22,225$134.88$170.00$173.50$167.50
0150Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN22,357.20$137.14$165.00$179.70$189.43
0155Miscellaneous asphalt (0339-1)TN67.10$735.48$315.00$728.03$2,755.21
0160Inlets, closed flume (0425-1910)EACH4$6,549.96$12,050$5,811.94$6,627.01
0165Manhole, adjust (0425-5)EACH3$1,445.74$1,725.00$1,282.84$3,302.33
0170Manhole, adjust, utilities (0425-5-1)EACH14$1,445.74$1,725.00$1,282.84$3,302.47
0175Valve boxes, adjust (0425-6)EACH15$1,445.73$1,575.00$1,282.84$2,192.45
0180Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF56$77.75$70.00$145.00$162.48
0185Polymer nosing for bridge expansion joint (0458-2)CF11.70$1,126.98$1,025.00$1,125.00$1,299.87
0190Concrete curb & gutter, type F (0520-1-10)LF260$45.99$70.00$40.81$46.53
0195Concrete sidewalk and driveways, 4" thick (0522-1)SY55$69.58$205.00$61.75$70.41
0200Concrete sidewalk and driveways, 6" thick (0522-2)SY485$89.59$78.00$79.50$90.65
0205Concrete ditch pavement, 6", reinforced (0524-1-49)SY19$343.19$610.00$304.52$347.23
0210Detectable warnings (0527-2)SF651$38.35$48.00$34.03$38.80
0215Riprap, rubble, F&I, ditch lining (0530-3-4)TN21.40$336.85$540.00$175.57$200.19
0220Bedding stone (0530-74)TN15.40$429.12$420.00$175.57$200.19
0225Guardrail -roadway, general (0536-1-1)LF1,066$29.30$31.00$21.00$23.07
0230Pipe rail for guardrail (0536-6)LF115$16.91$20.00$19.00$19.92
0235Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH2$309.92$280.00$575.00$371.59
0240Guardrail removal (0536-73)LF1,073$2.25$5.15$2.50$2.49
0245Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$2,234.81$1,850.00$1,700.00$1,311.95
0250Guardrail end treatment- parallel approach terminal (0536-85-24)EACH12$3,369.69$3,075.00$3,000.00$3,321.41
0255Performance turf, sod (0570-1-2)SY37,318$2.92$4.50$3.91$2.96
0260Performance turf, sod and shoulder treatment index (0570-1-3)SY150$2.92$30.00$91.41$13.79
0265Raised pavement marker, type B (0706-1-3)EACH5,084$5.35$5.05$4.75$4.38
0270Painted pavement markings, standard, white, solid, 6" (0710-11101)GM27.59$2,479.36$1,325.00$2,200.00$3,828.76
0275Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF2,556$2.25$2.05$2.00$1.09
0280Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF2,060$2.93$2.55$2.60$3.28
0285Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM2.16$467.69$805.00$415.00$873.30
0290Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.13$822.69$805.00$730.00$1,025.78
0295Painted pavement markings, standard, white, message or symbol (0710-11160)EACH16$84.52$86.00$75.00$109.42
0300Painted pavement markings, standard, white, arrows (0710-11170)EACH77$73.25$45.50$65.00$60.18
0305Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM17.42$2,479.36$1,325.00$2,200.00$3,828.50
0310Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF1,019$2.82$2.30$2.50$2.19
0315Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM6.26$467.69$805.00$415.00$874.36
0320Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.12$822.69$805.00$730.00$104.61
0325Initial contingency amount, DO not bid (0999-25)LS1$134,229$134,229$134,229$134,229
0330Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM23.09$1,859.53$1,660.00$1,947.51$2,190.71
0335Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH57$535.32$395.00$475.00$435.57
0340Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH16$2,592.06$2,225.00$2,300.00$2,457.06
0345Single column ground sign assembly, relocate (0700-1500)EACH1$197.22$153.00$175.00$167.53
0350Single column ground sign assembly, remove (0700-1600)EACH63$67.61$52.00$60.00$55.84
0355Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH21$214.12$255.00$190.00$279.21
0360Sign panel, remove, UP to 12 SF (0700-3601)EACH20$33.81$37.00$30.00$39.09
0365Object marker, type 2 (0705-10-2)EACH16$67.61$380.00$60.00$418.82
0370Object marker, type 3 (0705-10-3)EACH6$304.29$380.00$270.00$418.82
0375Raised pavement marker, type B (0706-1-3)EACH4,156$5.35$5.05$4.75$4.38
0380Painted pavement markings, surface (0710-90)LS1$112,698$120,000$100,000$309,760
0385Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF4,506$3.94$6.25$3.50$3.94
0390Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF982$5.07$6.50$4.50$5.47
0395Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,377$9.02$7.75$8.00$8.75
0400Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.06$2,930.15$2,150.00$2,600.00$2,647.26
0405Thermoplastic, standard, message or symbol (0711-11160)EACH16$135.24$195.00$120.00$164.13
0410Thermoplastic, standard, arrow (0711-11170)EACH121$107.07$75.00$95.00$109.42
0415Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF3,106$5.07$6.50$4.50$5.47
0420Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.12$2,930.15$2,100.00$2,600.00$2,616.52
0425Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,270$14.65$15.00$13.00$16.41
0430Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191)LF58$5.07$10.50$4.50$7.11
0435Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193)LF529$10.14$17.00$9.00$14.22
0440Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM26.53$4,057.14$5,000.00$3,600.00$5,578.58
0445Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM2.15$1,746.83$2,250.00$1,550.00$1,747.42
0450Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM15.65$4,057.14$5,000.00$3,600.00$5,580.27
0455Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM6.26$1,746.83$2,250.00$1,550.00$1,748.71
0460Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF663$2.82$5.25$2.50$2.74
0465Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.12$45,079$37,000$40,000$48,037
0470Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.12$45,079$37,000$40,000$48,037
0475Preformed/permanent tape, remove (0713-107)SF649$2.82$5.25$2.50$5.47
0480Conduit, furnish & install, open trench (0630-2-11)LF679$19.56$17.35$17.22$23.85
0485Conduit, furnish & install, directional bore (0630-2-12)LF646$54.33$66.50$66.41$59.09
0490Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$15,183$5,600.00$5,553.33$12,342
0495Signal cable, remove- intersection (0632-7-6)PI3$1,853.40$1,100.00$1,085.00$2,259.46
0500Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH27$1,843.84$1,450.00$1,406.96$1,826.17
0505Aluminum signals pole, (0646-1-11)EACH1$3,514.84$3,575.00$3,562.00$4,261.79
0510Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH5$2,638.95$3,400.00$3,342.00$3,867.89
0515Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH16$914.12$620.00$617.63$968.34
0520Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS2$1,223.63$1,000.00$993.00$1,220.00
0525Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS3$2,371.20$1,275.00$1,272.67$2,647.89
0530Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS2$242.30$555.00$552.00$76.87
0535Loop assembly, F&I, type B (0660-2102)AS4$1,403.89$3,225.00$3,219.50$2,002.33
0540Loop assembly, F&I, type F (0660-2106)AS11$2,104.09$2,600.00$2,586.09$2,181.78
0545Pedestrian detector, furnish & install, standard (0665-1-11)EACH18$580.76$432.00$429.56$408.13
0550Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH12$84.90$348.00$345.75$76.59
0555Traffic controller, modify (0671-2-40)EACH3$4,127.99$1,300.00$1,294.67$2,910.49
0560Traffic signal controller cabinet, adjust/modify (0676-1500)EACH3$4,738.53$1,440.00$1,434.33$3,025.38
FDOT contract T2A38: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of September 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy