SR 61 / SR 363 (CRAWFORDVILLE RD / ADAMS ST) FROM ARDEN RD.. Let by Florida DOT on May 20, 2026, Leon, District 3. 4 bids received; low bid $4,628,915 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
20 MAY 2026
Pay items
112
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$4,628,915Low
2Pigott Asphalt and Sitework LLC$4,737,780+2.0%
3Capital Asphalt Inc$4,748,761+3.0%
4Peavy & Son Construction Co., Inc.$4,887,598+6.0%
FDOT contract T3987: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. Pigott Asphalt and Sitework LLC3. Capital Asphalt Inc4. Peavy & Son Construction Co., Inc.
0005Mobilization (0101-1)LS1$298,200$250,203$385,000$400,000
0010Maintenance of traffic (0102-1)DA1$300,000$196,000$225,000$250,000
0015Pedestrian or bicycle special detour (0102-4-1)SY1$21,000$40,000$25,000$5,000.00
0020Traffic control officer (0102-14)HR280$93.00$100.00$100.00$115.00
0025Work zone sign (0102-60)ED47,852$0.25$0.25$0.30$0.27
0030Business sign (0102-61)EACH13$100.00$100.00$105.00$105.00
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED28,861$0.05$0.01$0.10$0.06
0040Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD22,655$0.10$0.10$1.00$0.11
0045Arrow board / advance warning arrow panel (0102-76)ED495$5.20$0.05$5.25$5.25
0050Portable changeable message sign, temporary (0102-99)ED858$10.00$10.00$10.50$10.50
0055Temporary signalization and maintenance, intersection (0102-104)ED1,775$16.00$1.00$16.00$17.85
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,775$17.00$1.00$16.00$15.75
0065Type III barricade (0102-115)ED270$0.25$1.00$0.30$0.27
0070Inlet protection system (0104-18)EACH136$130.00$100.00$200.00$150.00
0075Litter removal (0107-1)ACRE238.15$5.20$10.00$50.00$75.00
0080Mowing (0107-2)ACRE140.19$5.20$10.00$50.00$75.00
0085Clearing & grubbing (0110-1-1)ACRE1$17,000$39,500$50,000$15,000
0090Removal of existing concrete (0110-4-10)SY2,576$39.00$30.00$35.00$50.00
0095Optional base, base group 03 (0285-703)SY112$83.00$50.00$100.00$25.00
0100Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY17,628$2.95$2.50$2.00$2.25
0105Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY78,114$3.05$2.50$2.00$1.75
0110Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY9,958$3.35$2.50$4.00$1.00
0115Superpave asphaltic conc, traffic B (0334-1-12)TN265$127.00$173.00$150.00$155.00
0120Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN1,463.20$150.00$173.00$161.00$158.00
0125Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81)TN10,868.30$147.00$173.00$161.00$158.00
0130Miscellaneous asphalt (0339-1)TN29$560.00$400.00$500.00$300.00
0135Manhole, adjust (0425-5)EACH15$1,700.00$1,700.00$1,680.00$2,150.00
0140Manhole, adjust, utilities (0425-5-1)EACH57$1,700.00$1,700.00$1,680.00$2,150.00
0145Valve boxes, adjust (0425-6)EACH44$840.00$800.00$790.00$925.00
0150Meter boxes, adjust (0425-6-1)EACH1$630.00$1,500.00$1,680.00$950.00
0155Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311)LF117$84.00$100.00$84.00$84.00
0160Concrete curb & gutter, type F (0520-1-10)LF2,903$46.00$56.00$58.00$90.00
0165Concrete sidewalk and driveways, 4" thick (0522-1)SY678$100.00$100.00$100.00$100.00
0170Concrete sidewalk and driveways, 6" thick (0522-2)SY1,293$150.00$110.00$112.50$120.00
0175Detectable warnings (0527-2)SF793$26.00$29.00$26.25$27.00
0180Guardrail -roadway, general (0536-1-1)LF1,075$25.00$25.00$25.25$25.20
0185Pipe rail for guardrail (0536-6)LF113$19.00$20.00$19.00$18.90
0190Special guardrail post- special steel post for concrete structure mount (0536-7-2)EACH1$310.00$400.00$315.00$315.00
0195Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH4$3,700.00$3,900.00$3,675.00$3,675.00
0200Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123)EACH2$2,600.00$2,750.00$2,625.00$2,625.00
0205Guardrail removal (0536-73)LF794$2.10$3.00$2.25$2.10
0210Guardrail end treatment- trailing anchorage (0536-85-20)EACH3$2,100.00$2,300.00$2,100.00$2,100.00
0215Guardrail end treatment- parallel approach terminal (0536-85-24)EACH3$3,100.00$3,400.00$3,465.00$3,465.00
0220Guardrail end treatment- type CRT (0536-85-26)EACH2$4,200.00$4,500.00$4,200.00$4,200.00
0225Performance turf, sod (0570-1-2)SY2,131$10.00$4.00$10.00$5.00
0230Raised pavement marker, type B (0706-1-3)EACH4,200$4.70$4.50$4.75$4.75
0235Painted pavement markings, standard, white, solid, 6" (0710-11101)GM8.03$1,600.00$1,500.00$1,575.00$1,515.00
0240Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.16$1,700.00$1,800.00$1,732.00$1,733.00
0245Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF6,337$2.45$2.50$2.50$2.48
0250Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF305$2.60$3.00$3.00$2.63
0255Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF3,471$2.75$2.75$3.00$2.80
0260Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM3.18$680.00$750.00$683.00$685.00
0265Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.14$1,400.00$1,400.00$1,500.00$1,418.00
0270Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.65$1,400.00$1,500.00$1,400.00$1,365.00
0275Painted pavement markings, standard, white, message or symbol (0710-11160)EACH38$36.00$50.00$37.00$36.75
0280Painted pavement markings, standard, white, arrows (0710-11170)EACH146$31.00$35.00$32.00$32.00
0285Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM6.56$1,600.00$1,500.00$1,575.00$1,575.00
0290Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF1,426$2.60$2.25$3.00$2.63
0295Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM2.01$680.00$750.00$682.00$685.00
0300Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.18$1,300.00$1,500.00$1,365.00$1,418.00
0305Initial contingency amount, DO not bid (0999-25)LS1$50,027$50,027$50,027$50,027
0310Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH1$520.00$550.00$525.00$630.00
0315Single column ground sign assembly, relocate (0700-1500)EACH3$160.00$150.00$158.00$105.00
0320Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$180.00$200.00$184.00$210.00
0325Raised pavement marker, type B (0706-1-3)EACH2,100$4.70$4.50$4.75$4.75
0330Painted pavement markings, surface (0710-90)LS1$57,000$60,000$57,750$57,750
0335Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF6,337$3.65$3.65$3.75$3.68
0340Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF305$3.90$4.00$4.00$3.95
0345Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,348$6.50$6.50$6.50$6.57
0350Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.65$3,000.00$3,000.00$3,000.00$3,000.00
0355Thermoplastic, standard, message or symbol (0711-11160)EACH9$260.00$250.00$262.00$263.00
0360Thermoplastic, standard, arrow (0711-11170)EACH125$83.00$75.00$84.00$84.00
0365Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF1,426$4.40$4.00$4.50$4.50
0370Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.18$3,500.00$4,000.00$3,675.00$3,675.00
0375Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,123$12.00$13.00$13.00$12.60
0380Thermoplastic, preformed, white, message (0711-14160)EACH29$160.00$175.00$158.00$157.50
0385Thermoplastic, preformed, white, arrow (0711-14170)EACH21$160.00$175.00$158.00$157.50
0390Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM8.03$4,500.00$4,500.00$4,515.00$4,515.00
0395Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.16$6,200.00$6,000.00$6,500.00$6,222.00
0400Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM3.18$1,800.00$1,800.00$1,840.00$1,838.00
0405Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.14$10,000$10,000$10,300$10,290
0410Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM6.56$4,500.00$4,500.00$4,515.00$4,515.00
0415Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM2.01$1,900.00$2,000.00$1,890.00$1,890.00
0420Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF200$5.20$5.00$5.25$5.25
0425Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.57$43,000$40,000$44,100$44,100
0430Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.28$15,000$15,000$15,750$15,750
0435Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.29$43,000$40,000$44,000$44,100
0440Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.28$20,000$20,000$21,000$21,000
0445Conduit, furnish & install, open trench (0630-2-11)LF716$17.00$20.00$16.00$17.85
0450Conduit, furnish & install, directional bore (0630-2-12)LF799$41.00$40.00$37.00$40.00
0455Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI6$7,000.00$14,000$6,300.00$7,875.00
0460Signal cable, remove- intersection (0632-7-6)PI6$410.00$1,800.00$370.00$840.00
0465Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH13$1,000.00$1,400.00$945.00$1,470.00
0470Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH3$930.00$1,000.00$840.00$525.00
0475Aluminum signals pole, (0646-1-11)EACH10$3,500.00$2,500.00$3,150.00$3,360.00
0480Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH9$1,400.00$2,500.00$1,260.00$3,360.00
0485Aluminum signals pole, remove (0646-1-60)EACH3$120.00$500.00$105.00$525.00
0490Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS1$1,700.00$2,000.00$1,600.00$1,910.00
0495Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36)AS1$1,900.00$2,500.00$1,800.00$2,520.00
0500Vehicular traffic signal, remove- poles to remain (0650-1-60)AS1$170.00$500.00$160.00$210.00
0505Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70)AS1$690.00$1,500.00$630.00$1,050.00
0510Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH8$540.00$650.00$490.00$735.00
0515Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS10$1,400.00$1,200.00$1,260.00$1,210.00
0520Loop detector inductive, F&I, type 10 (0660-1110)EACH22$420.00$500.00$385.00$420.00
0525Loop assembly- F&I, type A (0660-2101)AS35$1,500.00$1,700.00$1,365.00$1,575.00
0530Loop assembly, F&I, type B (0660-2102)AS47$1,300.00$1,650.00$1,155.00$1,900.00
0535Loop assembly, F&I, type F (0660-2106)AS21$1,700.00$1,950.00$1,575.00$2,100.00
0540Pedestrian detector, furnish & install, accessible (0665-1-12)EACH37$2,600.00$2,100.00$2,300.00$2,200.00
0545Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH26$58.00$125.00$53.00$78.75
0550ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH3$9,300.00$7,500.00$8,400.00$7,350.00
0555ITS CCTV camera, relocate (0682-1400)EACH1$2,100.00$2,500.00$1,900.00$1,575.00
0560Sign panel, relocate, 12-20 SF (0700-3502)EACH1$470.00$600.00$430.00$630.00
FDOT contract T3987: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy